Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

32results about "Building scaffolds" patented technology

Simple standing platform for installing skeleton revetment precast block

The utility model relates to the technical field of revetment precast block, and particularly discloses a simple standing platform for mounting a skeleton revetment precast block, which comprises a precast block, one end of the precast block is connected with a mounting platform, one end of the mounting platform is provided with a supporting leg, one end of the mounting platform away from the supporting leg is provided with a hook, the bottom of the supporting leg is connected with a fitting assembly, and the fitting assembly swings along an axis. The mounting platform arranged in the device can build a temporary construction platform at one end of the mounted precast block, and the 'L' shape of the mounting platform can be adapted to the slope of the precast block in an inclined state, so that the construction personnel can better perform construction activities at one end of the precast block. The problem that the construction personnel is difficult to stably stand and move when the existing revetment precast block is installed in sections is solved.
Owner:CHINA RAILWAY NO 2 ENG GROUP CO LTD +1

A steel framed support device

ActiveCN224379360UBuilding scaffolds
This utility model belongs to the technical field of support devices, specifically a steel structure support device, comprising: a base plate and a top plate; four first T-slots disposed on the base plate; four first T-blocks respectively engaged with the four first T-slots; four support pipes respectively fixedly installed on the four first T-blocks; four second T-slots disposed on the top plate; four second T-blocks respectively engaged with the four second T-slots; four lifting rods respectively fixedly installed on the bottom of the four second T-blocks; two connecting plates located between the base plate and the top plate, each connecting plate having two round holes, the outer sides of the four lifting rods respectively contacting the inner walls of the four round holes; the bottom ends of the four lifting rods respectively inserting into the four support pipes. This utility model is easy to assemble, requiring no bolts or tools, saving time and effort.
Owner:BEIJING SCI & TECH ARCHITECTURAL DESIGN INST CO LTD

Automatic control method and automatic control program for a lifting device

To provide an automatic control method and an automatic control program for lifting devices, allowing correct grasping of abnormality on the basis of an operation state of the lifting device, while improving work efficiency when operating the lifting device, and advantageous for stable and effective operation of the lifting device.SOLUTION: Automatic control of each hydraulic control part 30 is performed so that the lifting amount of a lifting bed 16 becomes the lifting amount of one operation set in advance by repeating the lifting operation of each lifting jack 24 multiple times. When the operation state of a lifting device 14 is determined to be abnormal on the basis of the operation state of the lifting device 14 detected by an operation state detecting part 28, and a prescribed determination condition, the stop of the lifting operation of the lifting jack 24 is commanded to each hydraulic control part 30.SELECTED DRAWING: Figure 1
Owner:FUJITA CO LTD

Lifting device

To provide a lifting device that is advantageous for stable and efficient operation of the lifting device by enabling accurate identification of abnormalities based on the operating state of the lifting device, while improving work efficiency when operating the lifting device.SOLUTION: A lifting device comprises a lifting control unit 59 that automatically controls each hydraulic control unit 30 so that the lifting and lowering amount of a lifting platform 16 becomes a preset one-time lifting and lowering amount by repeating the lifting and lowering operation of each lifting jack 24 a plurality of times, and an operating state detection unit 28 that detects the operating state of a lifting device 14. The lifting device commands stop of the lifting operation of the lifting jack 24 to each hydraulic control unit 30 when the operating state of the lifting device 14 is determined to be abnormal based on the detected operating state and predetermined determination conditions.SELECTED DRAWING: Figure 1
Owner:FUJITA CO LTD

Movable Base for Use with a Scaffold

PendingUS20260160080A1Building scaffoldsHand cart accessories
A base for use with scaffolding. Side support members of the base have scaffold receiving members provided at ends thereof. First cross member and second cross member extend between the side support members and are rotatably mounted to the side support members. First wheels are mounted to the first cross member and second wheels are mounted to the second cross member. A connecting shaft extends between and is pivotally mounted to the first cross member and the second cross member. As the first cross member and the first wheels are rotated in a first direction, the second cross member and the second wheels are rotated in a second direction from a first position to a second position, allowing the first wheels and the second wheels to be positioned in engagement with the ground or floor surface.
Owner:AQUA CONSCIENCE HOLDINGS LLC

A general-purpose concrete slab composite floor system without the need for removing the bottom formwork, construction method and carbon emission reduction calculation method

PendingCN122082535Ahighlight materialitySignificant progressConstruction materialCovering/liningsIndustrial constructionFloor slab
This invention discloses a universal concrete slab system with no-removal bottom formwork, its construction method, and a carbon emission reduction calculation method, belonging to the field of prefabricated building technology. The core system consists of prefabricated no-removal bottom formwork units, a coordinating load-bearing steel reinforcement skeleton, a post-cast composite concrete layer, and a support and force transmission system. These are fixedly connected to bidirectional reinforcing bars via embedded connectors to form a coordinating load-bearing skeleton, ensuring a firm bond between the prefabricated bottom formwork and the post-cast layer, creating an overall load-bearing structure with the same strength as a fully cast-in-place slab of the same thickness. The prefabricated bottom formwork can be finished with white cement, achieving a unified attribute of temporary formwork, permanent structure, and finished decorative surface. The supporting construction method is designed to fit the specific characteristics of the system, significantly simplifying construction procedures. The carbon emission reduction calculation method is tailored to the dual / triple attributes of the no-removal bottom formwork, with specific calculation rules. This invention features a safe and reliable structure, wide applicability, and outstanding green and low-carbon effects, making it suitable for various civil and industrial building projects and complying with dual-carbon policy requirements.
Owner:苏锦平

Illumination structure

This technology enables the creation of three-dimensional illuminations using light in locations where there are no fixed structures on the land. [Solution] The system comprises a frame structure 10 consisting of a temporary framework that is removable and installed at the installation site 30, and LED lighting means 20 arranged along the framework that constitutes the frame structure 10. With this configuration, the frame structure 10 can be installed at the installation site 30 where there are no fixed structures on the ground, and the LED lighting means 20 can be arranged along the framework, making it possible to create a three-dimensional illumination using light in a place where there are no fixed structures on the ground. Since the frame structure 10 is removable, it can be removed from the installation site 30 after the event is over and returned to the state before the event. The frame structure 10 is lightweight and easy to transport because it consists of a framework, and it can be installed at the installation site 30, for example, in a place where heavy objects cannot be placed, thus having a wide range of applications. Furthermore, when installed outdoors, it is well-ventilated and has excellent wind resistance.
Owner:JR WEST BUILT

A site-restricted butyne diol synthesis steel structure frame multi-column stacking prefabricated foundation setting and construction method

The application provides a site-limited acetylenediol synthesis steel structure frame multi-column stacking prefabricated foundation arrangement and construction method, and relates to the technical field of steel structure frame construction. The concrete foundation is poured on the device ground, and the steel structure footing anchoring bolt is embedded in the concrete foundation. The application adopts the combined design of the concrete foundation + adjustable support steel column + detachable heightening assembly, directly uses the concrete foundation for stacking prefabrication, and perfectly adapts to various narrow site scenes. The setting of the leveling and pressing assembly can accurately adjust the support levelness, avoids steel structure displacement and welding deformation, and the flexible combination of the support steel column assembly and the heightening steel column assembly can adapt to steel structure prefabrication requirements of different sizes and different heights.
Owner:CHINA NAT CHEM ENG THIRD CONSTR

Method and weighing system for monitoring a scaffold erected on a passenger transport system

PendingEP4755835A1EscalatorsBuilding scaffolds
The present invention relates to a method for monitoring a scaffold (106) erected on a passenger transport system (100), wherein during the erection (200) of the scaffold (106) a weighing unit (112) of a multi-part weighing system (102) is arranged between a load application point (108) of the scaffold (106) and a support point (110) on the passenger transport system (100), wherein after the erection (200) a load (114) introduced into the support point (110) is determined using the weighing unit (112) and a warning (118) is issued if the load (114) exceeds a predefined warning load (116).
Owner:INVENTIO AG

Workbench

PendingJP2026106714ABuilding scaffolds
The present invention provides a workbench equipped with outrigger devices on the column bases that support the boards. [Solution] With the auxiliary legs of the outrigger device (5) in the retracted position (P1), the end fitting (25) of the auxiliary leg (7) forms a protruding portion (32) that extends outward from the vertical line Z hanging down from the joint edges (2a, 2b) of the top plate and a receiving portion (33). When two workbenches are placed with their joint edges and column legs facing each other, the protruding portion (32) of one end fitting facing the other is fitted into the receiving portion (33) of the other end fitting, thereby enabling the joining of the joint edges (2a, 2b) and forming a positioning means (34) in the edge extension direction X by engaging against the edge extension direction X in which the joint edges extend.
Owner:ALINCO

Scaffolding for arch bridge ribs

This invention discloses scaffolding for arch ribs of arch bridges, relating to the field of scaffolding technology. The invention includes four scaffolding poles and two frame plates. Two limiting holes are provided at one end of each scaffolding pole. Two connecting sleeves are provided on the lower surface of each frame plate. One end of each scaffolding pole is in movable contact with the inner wall of the connecting sleeve. U-shaped sleeves are provided on both sides of each frame plate. The surface of the connecting sleeves is provided with a disassembly and assembly mechanism for assembling and disassembling the scaffolding poles. A fixing mechanism is provided inside the U-shaped sleeve. By rotating a lead screw, the lead screw drives a second slider to move horizontally along the inner wall of a second sliding groove. The second slider moves the scaffolding poles horizontally through the connecting sleeves, thus facilitating the horizontal displacement of the scaffolding. This allows construction workers to stand on the scaffolding and perform construction work at different locations on the two arch ribs of the arch bridge. Simultaneously, it effectively reduces the amount of scaffolding used during construction and effectively reduces the time required to erect the scaffolding.
Owner:HANGZHOU SANHE ENG TECH CO LTD +1

Construction method of large-span corridor bailey frame based on midas model

This invention relates to a construction method for a large-span Bailey bridge connecting corridor based on the Midas model, belonging to the field of large-span connecting corridor technology. The method includes: analyzing the stress on the basement roof slab based on the positioning coordinates of pre-embedded steel plates, drawing a foundation node layout diagram, and welding double-section steel foundation beams to form a force-transfer frame. This frame is vertically assembled with Bailey panel columns to form Bailey column units, and adjacent units are horizontally connected using channel steel connecting rods to construct a support skeleton. The stress and deformation of this skeleton are calculated using Midas software to obtain verification data, based on which Bailey crossbeams and longitudinal beams are hoisted to establish a high-altitude load-bearing platform. Finally, the platform is fixed to the I-beam distribution beams using clamping plates to create a distribution beam support layer. Based on this layer, a disc-lock scaffold is erected to complete the construction of the connecting corridor pouring platform. This method solves the problem that existing technical solutions often lack effective utilization assessment of underground space, leading to potential insufficient foundation bearing capacity during construction.
Owner:CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP

Scaffolding platforms

PCT designated stageWO2026109882A1Building scaffoldsLaddersPhysical medicine and rehabilitationPhysical therapy
A scaffolding platform in which pairs of legs are pivotally attached to the platform for folding between an operative position and a folded position beneath the platform, a first leg of each pair of legs being pivotally attached to the platform by a first push button pivot assembly having one or more plungers which are displaceable generally parallel to the pivot axis of the pair of legs by depressing a push button of the first push button pivot assembly to disengage the plungers from cooperating apertures carried by the platform and the first leg to allow pivoting of the pair of legs relative to the platform. The first push button pivot assembly being arranged to hold the plungers disengaged from the apertures when its push button has been depressed once whilst the first leg is at first and second predetermined angles relative to the platform corresponding to the folded and operative positions of the first leg. A second push button pivot assembly is provided for pivotally mounting a second leg of the pair of legs to the platform, the second push button pivot assembly having the same construction as the first push button assembly, but being rotated through 180 degrees about a vertical axis before being connected with the platform and the second leg of the pair of legs. The second leg of the pair of legs is connected to the second push button pivot assembly so that the folded position of the pair of legs beneath the platform still corresponds with the first predetermined angle of the second push button pivot assembly but the operative position of the pair of legs no longer corresponds to the second predetermined angle of the second push button pivot assembly thus requiring the user of the scaffolding platform to continue to depress the push button of the second push button pivot assembly in order to retain its plungers disengaged from the cooperating apertures to allow movement of the pair of legs away from the operative position thus preventing accidental folding of the pair of platform legs.
Owner:POP-UP PRODUCTS LTD

A base facilitating maintenance of a desulfurization tower gas storage tank

ActiveCN224326007UDispersed particle separationBuilding scaffoldsGas holderMechanics
The present disclosure relates to the technical field of desulfurization tower gas storage tank, and particularly provides a base facilitating overhauling of a desulfurization tower gas storage tank, comprising a guide ring, a pedal, a base body and a locking assembly, the guide ring is arranged along the circumferential side of the base body; the bottom of the pedal is provided with a first supporting leg and a second supporting leg; the first supporting leg and the second supporting leg are both hinged to the pedal; the first supporting leg is slidably connected to the guide ring; the second supporting leg is located on the side of the pedal away from the base body; and the locking assembly is arranged between the pedal and the second supporting leg. The present disclosure is provided with the pedal, when overhauling the high place of the gas storage tank, the staff can step on the pedal, and the pedal can rotate around the circumference of the base body, thereby facilitating detection of the circumference of the tank body.
Owner:SHENHUA GUONENG ENERGY GRP +1

Supporting structure for floor type external scaffold adjacent to high slope and construction method of supporting structure

The invention discloses a supporting structure for a floor type external scaffold adjacent to a high slope and a construction method thereof.The supporting structure comprises a building body, a foundation pit is formed below a first-layer beam of the building body in an excavation mode, a ground beam is formed in the foundation pit in a pouring mode, and the ground beam is arranged below the first-layer beam; a frame column is connected between the ground beam and the first floor beam; the soil retaining plate is connected between the first floor beam and the ground beam; the cantilever plate is poured on the slope top of the side slope of the foundation pit, and one side of the cantilever plate extends in the direction of the building body and is connected to the ground beam so as to support an outer scaffold; and the foundation pit is filled with the backfill soil, and the backfill soil is supported on one side of the cantilever plate. According to the method, the problems that in an engineering scene close to a high slope, due to the fact that the distance between a slope supporting structure and a building body is limited, when an external scaffold is constructed close to the high slope, the steel consumption amount is large or much labor is consumed in an existing method are solved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Aerial work platform with linkage damping

A lift device and a method of controlling the lift device are provided. The lift device has a linkage assembly supported by a chassis, a work platform supported by the linkage assembly, and a hydraulic system. The hydraulic system has a lift cylinder to move the linkage assembly between a retracted position and an extended position, and a damping cylinder to increase stiffness of a pair of linkages positioned between the distal end of the lift cylinder and the work platform. When the linkage assembly is being extended, the lift cylinder receives pressure from the hydraulic system at a first pressure and the damping cylinder receives fluid from the hydraulic system at a second pressure, the second pressure lower than the first pressure.
Owner:TEREX SOUTH DAKOTA INC

A multi-machine combination device for a formwork moving platform

This invention discloses a multi-machine combination device for a formwork mobile platform, comprising several formwork mobile platform mechanisms. Each mechanism includes a replaceable template, a mobile robot platform, a support cylinder, and a telescopic support assembly. A load-bearing rod is installed at the telescopic end of the telescopic support assembly, positioned above the mobile robot platform. The replaceable template includes a central template with side templates rotatably connected to both sides. The central template is mounted on top of the telescopic support assembly. The support cylinder is hinged between the side templates and the central template, used to adjust the angle between the side templates and the central template. The side templates of adjacent formwork mobile platform mechanisms are arranged side-by-side and tightly fitted. This invention can be assembled and disassembled according to the dimensions of the building, replacing traditional scaffolding installation and traditional formwork. It is easy to assemble and disassemble, improving work efficiency, versatility, and practicality.
Owner:BEIJING RUICHUANG ZHONGJIAN INTELLIGENT ENGINEERING CO LTD

Protection device and power generation device

In order to provide a protection device that can be used as a power supply at a construction site, a site of repair work, or the like, a protection device according to the present invention comprises: a protection member that covers an object; and a thin-film solar cell that is provided on the outside of the protection member.

Intelligent construction apparatus and method of use thereof

ActiveCN122082561ASmooth moving movementSimplify the transshipment processBuilding material handlingBuilding scaffoldsStanding frameLogistics management
The application relates to the technical field of building intelligent lifting scaffolds, in particular to a kind of intelligent construction equipment and its using method, including underframe, side stand frame installed on the front and back of underframe and construction roof plate lifted between side stand frame, building materials are directly lifted by construction roof plate, conveying frame can also be distributed with the lifting of construction roof plate, the conveying frame of inclined distribution can continuously convey building materials upwards, that is, by combining conveying equipment with self-lifting scaffold, an integrated intelligent construction equipment is designed, which is used in cooperation with self-lifting scaffold, effectively solving the problem of separation and frequent independent operation in the prior art, the integrated design simplifies the transfer process of materials from ground to high-altitude operation surface, realizes continuous and efficient vertical and horizontal logistics circulation, significantly reduces the number of empty equipment waiting and repeated lifting, thereby greatly improving the overall construction efficiency.
Owner:CCCC SOUTHEAST CONSTR CO LTD