2224 results about "Scaffolder" patented technology

They are not going to do that kind of work,” said Yu Hang Flord, who has been a scaffolder for 30 years and later became the director of Wui Fai Holdings, a member of the Hong Kong and Kowloon Scaffolders General Merchants Association.

Overhanging type outer scaffold and construction method

InactiveCN109779225AAvoid the problem of uncontrollable parallelismReduce construction costsScaffold accessoriesBuilding support scaffoldsFalseworkSheet steel
The invention provides an overhanging type outer scaffold which comprises an outer scaffold body, the outer scaffold body is fixed to the outer side of a building outer wall through wall connecting pieces, and the wall connecting pieces comprise a first wall connecting piece, a second wall connecting piece and a third wall connecting piece. Compared with a traditional overhanging scaffold construction technology, the construction method has the advantages that by means of the construction method of embedded connecting steel plates on beams and fixing I-shaped steel, the problems that the overhanging scaffold has large requirements for I-shaped steel materials, and an embedded wall connecting rod is difficult to control on the aspect of parallelism and construction hole residues are solved.The embedded connecting steel plates do not affect masonry construction, the hidden danger of leakage caused by the fact that holes are reserved during masonry and the potential safety hazard causedby the fact that wall connecting rods are dismantled during worker construction are reduced, and the influence on the building structure is small. An overlong I-shaped steel material does not need tobe arranged to be fixed in a building, materials are saved, and the construction cost is saved. The problem that the parallelism of the embedded wall connecting rods is difficult to control is avoided, the construction efficiency is improved, and the construction period is shortened.
Owner:CHINA MCC17 GRP

Intelligent attaching lifting scaffold equipment for cambered super high-rise building and construction method

The invention provides intelligent attaching lifting scaffold equipment for a cambered super high-rise building and a construction method. The problem that a traditional steel tube cantilever scaffold and attaching type lifting scaffold cannot meet construction requirements of the modern super high-rise building with various external vertical faces is solved. The equipment comprises a climbing frame and a plurality of ground climbing frames, each ground climbing frame comprises first ground climbing beams used for climbing up of the climbing frame and second ground climbing beams used for angle adjustment, and the first ground climbing beams and the second ground climbing beams are the same in structure and arranged on a main body structure plate in a spaced mode. The construction method comprises a climbing frame mounting method, a climbing frame climbing-up method, a climbing frame angle adjustment method and a climbing frame detaching method. Climbing up and angle adjustment of the attaching type lifting scaffold equipment are improved through two sets of different systems correspondingly; when climbing up is needed, the first ground climbing beams and a climbing guiding rail are adopted for achievement; when angle adjustment is needed, the second ground climbing beams, vertical rods and hydraulic oil cylinders are adopted for achievement; and climbing up and angle adjustment are not interfered with each other, and each set of system can meet the stress requirement.
Owner:CONSTR & INSTALLATION ENG THE THIRD ENG GROUP OF CHINA RAILWAY +1

Cylindrical latticed shell sealed canopy and expanded installation method thereof

ActiveCN105951994AGuarantee engineering safety accidentsImprove stabilityArched structuresVaulted structuresEngineeringWire rope
The invention discloses a cylindrical latticed shell sealed canopy and an expanded installation method thereof. Bidirectional elastic plate type rubber supports are adopted and rotary centers of the two supports are overlapped with spherical centers of support bolts; the labor division is definite, the transmission is reasonable and boundary assumptions are consistent. In an installation process, a spherical hinge support composed of a lateral temporary limiting support and a vertical support can be adaptive to the outer surface of a spherical bolt very well, can rotate around the spherical bolt and can limit the movement of the spherical center of the spherical bolt. The structure of the lateral temporary limiting support and time nodes for mounting and dismounting the lateral temporary limiting support are defined, so that project safety accidents caused by the fact that the supports are unstable or support balls slide out in the project are avoided. A steel wire rope and a wind cable rope are used so that the supporting stability is improved and the reliable connection is realized. In an installation process disclosed by the invention, a scaffold does not need to be established and lifting equipment including a crane and the like is used as auxiliary tools, so that safe, efficient and economic construction is realized and the construction period is short. The installation precision is high and the selection of a closing position is economical.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Building scaffold steel pipe rust removal device

ActiveCN111230222AImprove rust removal effectAvoid the phenomenon of circumferential rotationRevolution surface grinding machinesGrinding drivesWorkbenchSteel tube
The invention provides a building scaffold steel pipe rust removal device, and belongs to the technical field of building equipment. The device solves the problems that an existing scaffold steel pipeis poor in rust removal quality. The building scaffold steel pipe rust removal device comprises a bottom plate and a workbench, wherein a pushing base is arranged on the bottom plate in a sliding mode, a plurality of forward rust scraping rings and a plurality of reverse rust scraping rings are rotationally connected to the workbench, a plurality of forward scrapers are arranged on the inner sideface of each forward rust scraping ring in the circumferential direction, a plurality of reverse scrapers are arranged on the inner side face of each reverse rust scraping ring in the circumferentialdirection, the workbench is provided with a driving piece capable of driving the forward rust scraping rings and the reverse rust scraping rings to synchronously and reversely rotate, the workbench is further provided with a plurality of rolling assemblies, and each rolling assembly comprises at least two rolling wheels used for abutting against and supporting the lower portion of a steel pipe and at least two rolling wheels capable of being pressed on the upper portion of the steel pipe. The building scaffold steel pipe rust removal device is better in rust removal effect and is more labor-saving in manual operation.
Owner:广州耀方脚手架工程有限公司

Positively-biased multidirectional three-dimensional connected clamp plate link, quick-release frame, application and method of positively-biased multidirectional three-dimensional connected clamp plate link and quick-release frame

ActiveCN104763717AForce relationship is clearSimple design and constructionScaffold connectionsRod connectionsMechanical engineeringMulti directional
The invention discloses a positively-biased multidirectional three-dimensional connected clamp plate link, a quick-release frame, an application and a method of the positively-biased multidirectional three-dimensional connected clamp plate link and the quick-release frame. The clamp plate link comprises a knob core, a clamp plate, a clamp ring and a knob pin, and is an independent connecting piece capable of simultaneously realizing forwardly, obliquely and multidirectional connecting or concentrically connecting in a same point way; the quick-release frame is a planar frame or a three-dimensional frame formed by mutually assembling an upright bar, a flat bar and an oblique bar; the clamp plate link and the quick-release frame can be applied to a carrying frame, a bailey frame, a bridge frame, a storage rack, a frame, a crane carriage, an elevator frame, a suspension frame, a lifting frame and a carrying frame to be quickly dismounted, especially a scaffold, a template support and the like in the engineering construction field; the independent nodes and independent rod pieces of the quick-release frame can be realized in a solderless manufacturing and pin fixed connection way, the same-point, same-node, coplanar and concentric connection can be realized, the multi-directional bearing, flexibility and diversity and variation can be realized; in addition, the clamp plate link is safe and convenient, firm and durable, accurate and quick.
Owner:朱宏宇

Construction technology of hanging basket moving platform for high slope

The invention discloses a construction technology of a hanging basket moving platform for a high slope. The construction technology is characterized by including the following steps that (1) anchoring points are arranged; (2) a working steel wire rope and a safety steel wire rope are mounted; (3) a suspension platform is assembled; (4) a safety lock and a hoister are installed in place; (5) an independent life line is arranged; and (6) construction tools are mounted. The construction technology is suitable for high slope operations and vertical plane high-place operations where scaffolds are unsuitable for being erected. The hanging basket moving platform is a movable construction platform erected for high-place construction operation, and is a suspension structure anchored to the high place; and particularly in the construction process of slope reinforcement projects with anchor cables and anchor rods of the high slope, the hanging basket is hung by the steel wire ropes and the slope top anchoring points and is moved to the specific construction location through the hoister and rollers, so that a safe construction platform is formed. The construction technology is an application technological innovation to replace the scaffold function during high-place construction.
Owner:SICHUAN SHUTONG PORT WATERWAY ENG CONSTR CO LTD

Scaffold safety railing device

The present invention provides a support clamp device for a safety rail or similar device adapted for mounting on a pump jack pole comprising: a first pole clamp, circumscribing a generally rectangular perimeter, the first pole clamp comprising a generally U-shaped bar having a first side; a second side and a third side, wherein the first and third sides are approximately parallel to each other and the second side is approximately perpendicular to the first and third sides and wherein the second side further comprises an aperture; and a fourth side removably attached to the first and third sides opposite and approximately parallel the second side; and a second pole clamp, circumscribing a generally rectangular perimeter, the second pole clamp comprising a generally U-shaped bar having a first side; a second side and a third side, wherein the first and third sides are approximately parallel to each other and the second side is approximately perpendicular to the first and third sides and wherein the second side further comprises an aperture; and a fourth side removably attached to the first and third sides opposite and approximately parallel the second side; and a pole clamp connecting fastening means stably inserted through the aperture of the second side of the first pole clamp and through the aperture of the second side of the second pole clamp, wherein the first pole clamp and the second pole clamp are able to pivotably rotate about the axis formed by the pole clamp connecting fastener.
Owner:MORRIS MICHAEL JOHN

Method for constructing hanging rope and pipe combined all-round scaffold construction platform and protective system

ActiveCN103669815AEliminate the cumbersome process of setting upEnsure safetyBuilding material handlingBuilding scaffoldsArchitectural engineeringRebar
The invention relates to a method for constructing a hanging rope and pipe combined all-round scaffold construction platform and a protective system. The method is characterized by comprising steps of 1), erecting the hanging rope and pipe combined all-round scaffold construction platform, in other words, (1) arranging steel ropes within a range encircled by structure columns or reinforcement pull rings so as to form a net, (2) laying 'bottom' horizontal tubes on steel rope planes in a longitudinally and transversely staggered manner, (3) arranging diagonal bracings, (4) connecting and erecting upright tubes onto the 'bottom' horizontal tubes by the aid of steel pipe fasteners, (5) erecting horizontal cross rods on the upright tubes according to safety technical specifications for building fastener type steel pipe scaffolds to form an all-round scaffold body, (6) fully laying scaffold floors on the uppermost-layer horizontal cross rods to form an operation platform, and (7) arranging safety protective fences on the upright tubes around the operation platform; 2), constructing the construction all-closed safety protective system. The method has the advantages that the hanging rope and pipe combined all-round scaffold construction platform and the protective system can be safely and quickly constructed by the method, and cross operation or normal use of relevant functional zones below construction regions can be guaranteed.
Owner:CHINA FIRST METALLURGICAL GROUP

Formwork reinforcing system replacing wood with steel and construction technology thereof in external wall construction

The invention belongs to the field of building construction, and provides a formwork reinforcing system replacing wood with steel and a construction technology thereof in external wall construction. The formwork reinforcing system replacing the wood with the steel is characterized in that a steel keel support assembly is arranged on a concrete structural wall body and composed of vertical battens and horizontal battens, the vertical battens are fixed to waterproof-bolt holes in the uppermost row of the two sides of the concrete structural wall body, the horizontal battens are horizontally arranged on the vertical battens, vertical keels are perpendicularly arranged on the horizontal battens, and the vertical keels are fixedly connected with a wooden formwork through steel nails. The construction technology of the formwork reinforcing system replacing the wood with the steel comprises the following steps of scaffold erection, aerial supporting construction of the external wall vertical steel keels, seam splicing construction of an external wall formwork, steel keel installation construction and external wall reinforcing construction. According to the formwork reinforcing system replacing the wood with the steel and the construction technology thereof in the external wall construction, the technology is simple, operation is convenient, and the construction problem existing in an existing construction technology is effectively solved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products