Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

3818 results about "Lifting equipment" patented technology

Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift loads. This includes jacks, block and tackle, vacuum lifts, hoists, rotating screws, gantries, A frames, gin poles, shear legs, sheerleg, windlasses, lifting harnesses, fork lifts, hydraulic lifting pads, air lift bags, and cranes.

Full-automatic poker machine

The invention relates to a full-automatic poker machine, which comprises a mounting bottom plate and a plurality of support legs. A card inlet is disposed on the mounting bottom plate, card cutting and primary card distributing equipment is arranged at one end of the card inlet, card sorting and secondary card distributing equipment is arranged at the other end of the card cutting and primary card distributing equipment, card flopping and dealing equipment is disposed at the other end of the card sorting and secondary card distributing equipment, card pushing equipment is arranged at the other end of the card flopping and dealing equipment, and card lifting equipment is disposed on one side of the card pushing equipment. When the full-automatic poker machine works, disorder poker cards are primarily separated by the aid of the card cutting and primary card distributing equipment, then are adjusted to face the same direction and separated from each other by the card sorting and secondary card distributing equipment, then by the aid of the card flopping and dealing equipment, the single poker cards with front surfaces facing upwards and downwards are adjusted so that the front surfaces of the single poker cards face upwards or downwards in a unified manner and the single poker cards are dealt, the poker cards are pushed to specified positions by the card pushing equipment, and finally are lifted to a tabletop by the card lifting equipment, and card cutting and dealing actions are completed. The full-automatic poker machine brings convenience for reducing labor intensity of game, waiting time is shortened, and simultaneously, automation degree of the machine is improved.
Owner:陈雄兵

Method of removing radioactive materials from a submerged state and/or preparing spent nuclear fuel for dry storage

A system, apparatus and method of processing and / or removing radioactive materials from a body of water that utilizes the buoyancy of the water itself to minimize the load experienced by a crane and / or other lifting equipment. In one aspect, the invention is a method comprising: a) submerging a container having a top, a bottom, and a cavity in a body of water having a surface level, the cavity filling with water; b) positioning radioactive material within the cavity of the submerged container; c) raising the submerged container until the top of the containment apparatus is above the surface level of the body of water while a major portion of the container remains below the surface level of the body of water; and d) removing bulk water from the cavity while the top of the container remains above the surface level of the body of water and a portion of the container remains submerged. The bulk water can be added back into the cavity to add neutron shielding after the container is placed in a staging area and prior to personnel performing the desired operations to the container. As a result, gamma radiation and neutron shielding of the container can be maximized for any crane capacity.
Owner:HOLTEC INT

Concrete casting production technique with energy-saving environmental-protection function

The invention relates to production technology for a concrete precast element with energy-saving and environment-friendly functions. In the production of the prior concrete precast element, the fixing of a precast element mould, operators, lifting equipment and raw materials of production are in a motion state, and the production has low efficiency, serious noise pollution, large steam loss, and large energy consumption, and cannot isolate vibrating noise. The technology comprises the following steps: demoulding of a precast element; clearing the inner surface of the mould and spraying mould oil; installing an embedded part and lifting a reinforcement cage; casting concrete and vibrating the concrete; touching the surface of the concrete and clearing the outside surface of the mould; standing and curing; polishing the surface of the concrete; and steam curing. The mould does reciprocating running circularly by current production equipment, and workers, materials and equipment are fixed relatively so as to improve the productivity. The working procedures of vibrating and steam curing are carried out in a fixed station so as to isolate the noise effectively and carry out effective heat insulation on the steam loss and heat loss. The production technology has significant energy conservation and environment protection, and is favorable for popularizing.
Owner:SHENZHEN GANGCHUANG BUILDING MATERIAL

Lifting method and lifting system for six-degree-of-freedom active type wave compensation

The invention discloses a lifting method and a lifting system for six-degree-of-freedom active type wave compensation. The lifting method is characterized in that eight sets of servo systems and a binocular vision detection system are arranged on lifting equipment of a supply ship, each servo system consists of a steel wire rope traction lifting tool system driven by a servo motor, and the binocular vision detection system comprises two cameras; every two of eight steel wire ropes in the lifting tool system are respectively tied to the four corners of a load, and the two cameras are used for respectively detecting, and forming negative feedback according to the relative positions and relative attitudes of the supply ship and the supplied ship in the supply process, and the current speed and position parameters of the steel wire ropes, and the negative feedback is input into the control parameters of the steel wire ropes; the servo motors are used for controlling the rotation speeds and directions of the steel wire ropes according to the control parameters, the six-degree-of-freedom movement of the load corresponding to a base is uniform with the six-degree-of-freedom movement of the supplied ship corresponding to the base, and the purpose of six-degree-of-freedom relative movement compensation is realized. The lifting method has the advantage that the anti-swinging characteristic is better.
Owner:NAT UNIV OF DEFENSE TECH

Steel box girder assembling construction method

The invention provides a construction method for assembling steel box girders, which is used for the hoisting construction of the steel box girders during the road and bridge construction. The method comprises the steps as follows: a first steel box girder section is hoisted; a second steel box girder section is hoisted and suspended on the soleplate of the first steel box girder section; a connecting clamp plate is arranged at the top plate of the first steel box girder section and the second steel box girder section and is respectively suspended on top of the first steel box girder section and welded on the top of the second steel box girder section; hoisting equipment is removed; the mutual position of the steel box girder sections is adjusted and the steel box girder sections are welded to each other; the connecting clamp plate is removed; the temporary pier is removed; and the assembly is completed. As the residual assembly is adopted, the steel box girder construction under complex construction environment has large elasticity, thus ensuring the assembly precision and quality; the loading form is adopted to carry out the assembly of the steel box girder, thus solving the problem that the temporary pier is difficult to be arranged when the site is restricted; the construction time of hoisting equipment and the use of the temporary piers are reduced; and the whole assembly process is simple, feasible, safe, reliable, economical and reasonable.
Owner:GUANGZHOU MUNICIPAL ENG GROUP

Stability monitoring system and stability monitoring method of lifting equipment

ActiveCN102556866AMonitor job stabilityWorking conditions are accurately determinedCranesMonitoring systemIndustrial engineering
The invention provides a stability monitoring system of lifting equipment, comprising a first acquisition unit which is arranged at the position of a landing leg oil cylinder of the lifting equipment and acquires the force applied to each landing leg, a second acquisition unit which acquires the lifting weight of the lifting equipment, a judging unit which reads a working condition table which ispre-stored in a storage unit and a processing unit, wherein the working condition table contains working condition information, a lifting weight parameter and a rated landing leg counter-force, the working condition information corresponds to the lifting weight parameter and the rated landing leg counter-force one by one, the judging unit finds the rated landing leg counter-force which corresponds to the obtained lifting weight from the working condition table and compares the rated landing leg counter-force with the acquired force applied to each landing leg, and the processing unit limits the action of a corresponding executing mechanism according to the judging result. In the technical scheme of the invention, the stability monitoring system can detect the counter-force applied to eachlanding leg in real time and the rotating position of each landing leg, compares with the preset working condition table, controls the action of a crane and avoids the roll-over of the crane. The invention also provides a stability monitoring method of lifting equipment.
Owner:SANY AUTOMOBILE HOISTING MACHINERY

Dry vertical shaft storage system for spent fuel of nuclear power station and storage method thereof

The method provides a dry vertical shaft storage system for spent fuel of a nuclear power station and a storage method thereof. The system comprises a loading subsystem, a storage subsystem, a reloading subsystem, a transferring subsystem, a residual heat discharge subsystem, a negative pressure ventilation subsystem, a fuel suction subsystem and an air blowing subsystem. The system saves a water-cooling system and a water purification system on the basis of the water storage method; the storage vertical shaft is arranged underground, so that the influence of an external event can be effectively prevented, such as airplane crash; when the spent fuel needs to be transferred, a spent fuel storage tank can be taken out of a storage depot, and then directly loaded in a spent fuel shielding transport cask through lifting equipment so as to be conveniently transported; a plant and structural equipment are not polluted by radioactive materials, so the spent fuel storage depot can be normally disassembled and retired after the spent fuel storage tank is transferred; radioactive decontamination is not needed and the spent fuel storage depot can be conveniently retired; and the storage tank can be processed in different phases to reduce initial cost according to the operation of the power station.
Owner:CHINERGY CO LTD

Push pipe construction method and push pipe device

The invention provides a push pipe construction method and a push pipe device, and belongs to the technical field of architectural engineering equipment. The technical problems such as low construction efficiency of the conventional push pipe construction method are solved. The construction method comprises the following steps: a, digging a well; b, mounting equipment; c, jacking a drill head of the push pipe; d, jacking a pipeline; e, pumping mud; f, taking out a machine head, and the like. The push pipe device comprises jacks, a jack bracket, a sliding rail and a push pipe drill head, wherein the jacks are arranged on the jack bracket; the push pipe drill head is arranged on the sliding rail; telescopic rods of the jacks are towards the push pipe drill head; a circular back is arranged between the jacks and the push pipe drill head, and the circular back is attached to the end part of the push pipe drill head; the front end of the push pipe drill head is connected with a water inlet pipe and a mud outlet pipe, and hoisting equipment is also arranged above the sliding rail. According to the invention, in the process of jacking, water can be injected into the front end of the push pipe drill head through the water inlet pipe, excavated soil is changed into slurry by water currents, the slurry is discharged out of the mud outlet pipe, and the soil discharging efficiency is improved.
Owner:GUOQIANG CONSTR GRP

Set bearing platform foundations and construction method thereof

ActiveCN102767189AReduce the impact of adverse factorsReduce construction difficultiesFoundation engineeringYardLifting equipment
The invention discloses set bearing platform foundations and a construction method thereof. The foundations comprise piles which are vertical. Bearing platform plates are arranged horizontally on the piles, the piles and the bearing platform plates are connected by cast-in-place concrete, temporary water stop air sacs are arranged on the bottom portion of the cast-in-place concrete. The piles are subjected to in-situ hole drilling and pouring, and the bearing platform plates are precast in overland precast yards. The precast bearing platform plates are transported to bridge locations by land or by water and hoisted by overwater hoisting devices, and the bearing platform foundations are constructed according to the construction method of the set bearing platform foundations. According to the set bearing platform foundations and the construction method, separate precast and assembly of bearing platform foundations can be achieved, influences of adverse factors of deep water, tides, shipping, ecology and the like on deep-water bridge foundation construction in rivers, lakes and seas are reduced, construction difficulties are reduced, the security of engineering quality is guaranteed, and construction progress is expedited. The structure design is reasonable, the construction method is reliable, and the method can be widely applied in deep-water bridge foundation construction of rivers, lakes and seas.
Owner:CHINA RAILWAY FIFTH SURVEY & DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products