Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

484 results about "Buttress" patented technology

A buttress is an architectural structure built against or projecting from a wall which serves to support or reinforce the wall. Buttresses are fairly common on more ancient buildings, as a means of providing support to act against the lateral (sideways) forces arising out of the roof structures that lack adequate bracing.

Buttress conveying device

The invention provides a buttress transportation device which comprises a chassis, a protection component, a hoisting component and a fixing component, the chassis is used for supporting a plurality of buttresses, the chassis comprises a supporting seat and a bottom plate, the supporting seat is fixedly connected with the bottom plate and used for supporting the bottom plate, the buttresses are placed on the bottom plate, and the protection component is arranged on the bottom plate. The protection component is arranged in the circumferential direction of the chassis, the protection component is fixedly connected with the chassis, the protection component is used for limiting the buttress and preventing the buttress from falling off from the chassis, and the hoisting component is arranged in the circumferential direction of the chassis and connected with the chassis and the protection component. The buttress is transported to a ship, the fixing component clamps the buttress, the fixing component is used for limiting the buttress and fixing the buttress to the bottom plate, and the fixing component is detachably connected with the bottom plate, so that the buttress is conveniently fixed to or detached from the bottom plate.
Owner:SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD

Curve pushing intelligent synchronous control construction method

The invention provides a curve pushing intelligent synchronous control construction method. The curve pushing intelligent synchronous control construction method comprises the steps that S1, a crane moving area is compacted; s2, multiple sets of temporary buttresses are erected on the pushing linear extension line; s3, after the steel box girder is transported in place, the steel box girder is placed on the jig frame, and S4, a propelling scheme is set according to a bridge curve, and jacking strokes of a vertical jack, a propelling jack and a transverse jack are distributed; and S5, a beam falling jack is installed for beam falling, and the pushing equipment and the temporary buttress are dismantled after beam falling is completed. And a pushing scheme is set, and the pushing path of each jack is controlled, so that the steel box girder is pushed according to the preset path, the pushing precision is ensured, and the construction quality and the construction efficiency are ensured.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1

Construction integration platform

ActiveCN223227008UBuilding scaffoldsButtressPilaster
The construction integrated platform comprises a platform vertical frame, one side of the platform vertical frame is used for being connected with the side, away from an inner shell, of an outer shell, the platform vertical frame is vertically arranged in the vertical direction, the platform vertical frame comprises a plurality of supporting stand columns vertically arranged in the vertical direction, and the multiple supporting stand columns are sequentially arranged to define the platform vertical frame; the top end of the supporting stand column extends towards one side to be provided with an overhanging arm. The two ends of the first transverse frames are connected to the two adjacent cantilever arms correspondingly; the two ends of the second transverse frame are connected to the two adjacent cantilever arms respectively, one first transverse frame or one second transverse frame is connected between the two adjacent cantilever arms, and the position of the second transverse frame in the vertical direction is higher than that of the first transverse frame. According to the construction integrated platform, the buttress can be avoided, interference to the inner buttress is avoided, construction is convenient, and therefore the construction efficiency can be improved.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD

Building protection plate with damping and buffering functions

The invention relates to the technical field of building protection plates, and discloses a building protection plate with damping buffering, which comprises an upper buttress, a lower buttress, a glass fiber fireproof filling material layer, rubber supports and a closed protection plate, the rubber supports are distributed between the upper buttress and the lower buttress, and base plates are arranged above and below the rubber supports; mounting bolts are connected and distributed at the bottom of the base plate through threads in a penetrating manner; the glass fiber fireproof filling material layer is arranged outside the rubber support and located between the upper buttress and the lower buttress. The closed protection plate comprises an upper sealing plate and a lower sealing plate, fastening bolts are connected into the upper sealing plate and the lower sealing plate in a penetrating mode, and the fastening bolts are connected to the outer side walls of the upper buttress and the lower buttress through threads. The building protection plate with the damping and buffering functions has the advantages of fire disaster isolation, fire spread prevention and safety protection, has the properties of fire prevention, flame retardance, water prevention, shock resistance, wind resistance and the like, has good sound insulation performance, effectively reduces noise pollution, and is environment-friendly and non-toxic.
Owner:SHANXI CONSTR ENG CO LTD

Combined structure of assembly type ditch and retaining wall and construction method of combined structure

PendingCN120061393AArtificial islandsHops/wine cultivationButtressLand rehabilitation
The invention discloses a combined structure of an assembled ditch and a retaining wall and a construction method thereof, and belongs to the technical field of agriculture and forestry land reclamation. The structure comprises a ditch and a retaining wall, the ditch is formed by interlocking and clamping a bottom plate and a wall plate through a broken-line-shaped groove and a tenon, and the outer side of the ditch is wrapped with hydraulic cloth and a hydraulic film in a layered mode to enhance the impermeability; the retaining wall adopts the right triangle buttress and the hollow reinforced concrete baffle, is fixed through the plug pin and is connected with the ditch through the inhaul cable in the threading pipe, so that the anti-overturning and anti-sliding stability is improved. The construction method comprises the steps of prefabricating the components, laying impermeable materials in a layered mode, conducting modular assembling, conducting backfilling and greening and the like. Through structure optimization and standardized prefabrication, the problems that a traditional cast-in-place structure is long in construction period, high in manufacturing cost and the like are solved, and the advantages of being rapid in assembly, multiple in seepage prevention, capable of saving cost and environmentally friendly are achieved. Compared with a cast-in-place scheme, the comprehensive manufacturing cost is reduced, the construction efficiency is remarkably improved, and the water and soil loss prevention and control effect is better.
Owner:POWER CHINA KUNMING ENG CORP LTD

Universal fixture for fixing multi-directional building template frame

The invention discloses a universal fixture for fixing a multi-directional building template frame. The universal fixture comprises a fixed clamping plate, a short-stroke sliding groove, a sliding hollow groove box, a long-stroke sliding block, a bottom plate, a connecting piece, a sliding block limiting device and a long-stroke sliding groove. A rectangular steel block is arranged on the upper portion of the fixed clamping plate, a short-stroke sliding block is arranged below the rectangular steel block, and the short-stroke sliding block is inserted into a short-stroke sliding groove welded to the upper portion of the sliding hollow groove box so that the short-stroke sliding block and the sliding hollow groove box can be connected together. Sliding block limiters are arranged on the short-stroke sliding grooves in the outer sides of the fixing clamping plates to limit movement of the fixing clamping plates, and the two fixing clamping plates are connected with a building formwork through rectangular steel blocks. A long-stroke sliding block is fixed below the sliding hollow groove box and is inserted into a long-stroke sliding groove welded above the bottom plate, so that the long-stroke sliding block and the long-stroke sliding groove are connected together in a sliding manner; sliding block limiters are arranged at the two ends of the long-stroke sliding block to limit the movement of the sliding hollow groove box; connecting pieces are arranged on the two sides of the bottom plate, connecting holes are formed in the connecting pieces, and the bottom plate is fixedly connected with the buttress through the connecting pieces on the two sides.
Owner:SHENYANG JIANZHU UNIVERSITY

Construction structure for continuous steel beam to span existing railway

The utility model relates to the technical field of railway construction, and particularly discloses a construction structure for a continuous steel beam to span an existing railway, which comprises a bearing mechanism, a supporting mechanism and a steel beam, the bearing mechanism comprises a rail and a steel sleeper, the steel sleeper is laid on the lower surface of the rail, a longitudinal beam is mounted on the upper surface of the steel sleeper, and a cross beam and a supporting mechanism are arranged on the lower surface of the rail; the supporting mechanism comprises cast-in-situ bored piles and manual hole digging piles, and the cast-in-situ bored piles are arranged at the two ends of the cross beam; the bearing mechanism with the longitudinal beams and the cross beams and the supporting mechanism with the cast-in-situ bored piles and the manual hole digging piles are arranged, the cast-in-situ bored piles are used as buttresses, and the I-shaped steel auxiliary beams are used as an overhead system formed by the longitudinal beams and the cross beams, so that the road can pass through the existing railway; compared with conventional jacking construction, cost is reduced, efficiency is improved, a series of problems that in traditional jacking construction, efficiency is low, cost is high, construction precision is difficult to control and the like can be solved, and potential safety hazards of uncontrollable factors in trenchless construction can be reduced to a great extent.
Owner:NO 3 ENG COMPANY LTD OF CCCC FIRST HARBOR ENG COMPANY +1

Mounting device for friction pendulum support of building shock insulation layer

The utility model relates to a friction pendulum support mounting device for a building shock insulation layer. The friction pendulum support mounting device comprises a lower buttress steel bar, an embedded plate assembly and a leveling bolt assembly, the pre-embedded plate assembly comprises a pre-embedded steel plate arranged above the lower buttress steel bar, a plurality of bolt sleeve assemblies are distributed at the bottom of the pre-embedded steel plate, the lower portions of the bolt sleeve assemblies are located in the lower buttress steel bar, and a pre-embedded plate reserved opening penetrates through the middle of the pre-embedded steel plate; four leveling bolt assemblies are evenly distributed on the periphery of the bottom of the embedded steel plate, each leveling bolt assembly comprises a leveling screw and a leveling nut, the leveling nuts are screwed on the leveling screws in a threaded mode, the leveling nuts are welded to one of the horizontal reinforcing steel bars of the lower buttress reinforcing steel bars, and the tops of the leveling screws make contact with the bottom of the embedded steel plate. According to the utility model, the elevation and levelness of the embedded steel plate can be adjusted by screwing the leveling screw rod, and the mounting quality of the friction pendulum assembly can be effectively ensured, so that the working performance of the friction pendulum support and the shock isolation effect of the shock isolation layer are ensured.
Owner:CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD +1

Shock insulation tensile device working in whole process of earthquake

The invention provides a shock insulation tensile device working in the whole process of an earthquake, and relates to the technical field of building earthquake resistance. The vibration isolation device comprises a vibration isolation support fixedly installed between an upper buttress and a lower buttress and further comprises a plurality of tensile viscous dampers, the two ends of each tensile viscous damper are connected with the upper buttress and the lower buttress through universal hinges correspondingly, a C-shaped plate is arranged on one side of each tensile viscous damper, four fixing arms are fixedly installed on each C-shaped plate, and each C-shaped plate is connected with the corresponding fixing arm. The ends, away from the C-shaped plate, of the four fixing arms are connected with a cylinder body of the tensile viscous damper, and two scale plates are installed in the C-shaped plate in a sliding mode. The shock insulation tensile device working in the whole process of the earthquake has the advantages that the shock insulation support can be effectively prevented from being damaged due to the fact that the shock insulation support bears too large tensile force, related personnel can conveniently measure the maximum extension and retraction amplitude of the piston rod of the tensile viscous damper in the earthquake after the earthquake, detection components are flexible to install, and data recording reliability is high.
Owner:CHINA SOUTHWEST ARCHITECTURAL DESIGN & RES INST CORP LTD

Multi-functional connector

An assembly for offsite construction of a building, a connector for use in such an assembly, along with a method of manufacture of such a connector, and a method of construction using the assembly. The connector includes first and second buttress elements defining, respectively, a first location portion and a second location portion. The first location portion and the second location portion are configured, respectively, to receive first and second structural elements extending at transverse angles to each other. The first and second buttress elements each has first and second opposite side walls defining an access space between them for a connector to be accessed. The second side wall of the first buttress element and the second side wall of the second buttress element together define a third location portion configured to receive a third structural element extending transversely to the first and second structural elements.
Owner:MOONSHINE INVESTMENT HOLDINGS LIMITED

Ventilation system of municipal underground pipe ditch

The utility model discloses a ventilation system of a municipal underground pipe ditch. Due to the fact that the buried depth is small, the section is small, ventilation facilities are often lost or simplified, and ventilation in an existing comprehensive pipe ditch is not smooth. Working wells of the underground pipe ditch serve as ventilation wells, two ventilation pipes are arranged between every two working wells of the underground pipe ditch and in the lateral direction of the underground pipe ditch, and the ventilation pipes extend out of the ground for ventilation. An unpowered hood is arranged at the top of the ventilation pipe; a concrete buttress is arranged at a bottom elbow of the ventilation pipe for fixing, and a waterproof sleeve is arranged at the side wall of the ventilation pipe penetrating through the underground pipe ditch. The underground pipe trench multi-point natural ventilation system can achieve multi-point natural ventilation of an underground pipe trench, can greatly reduce the temperature in the pipe trench, is very beneficial for discharging waste heat and reducing the temperature in the trench, and meanwhile ensures the safety of inspection and maintenance personnel.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP

Civil engineering pile foundation detection device

The invention relates to the technical field of civil engineering pile foundation detection, and discloses a civil engineering pile foundation detection device which comprises a to-be-detected pile foundation, a jack is arranged at the top of the to-be-detected pile foundation, a main beam is arranged at the top of the jack, buttresses are arranged on the portions, on the two sides of the to-be-detected pile foundation, of the foundation correspondingly, and the buttresses are arranged on the main beam. A gap is reserved between the buttress and the main beam, a concrete block or other counterweight materials used for counterweight are placed on the bearing table, and when the gravity generated by the bearing table presses downwards, downward pressure amplified by the lever structure for multiple times can act on the top of the main beam so as to facilitate load testing; the lever structure can amplify the sinking gravity of the bearing platform, so that a simulation test can be carried out under the condition of adopting fewer balancing weights when a pressure-bearing test is actually carried out on the pile foundation to be tested, and the problem that a large number of concrete blocks are required to carry out a balancing weight test in a conventional static load compression test is solved. And a crane needs to spend a lot of time to carry concrete blocks, so that the cost is increased.
Owner:GUIZHOU POLYTECHNIC COLLEGE OF COMM

Fabricated slope support waterproof system

The invention discloses an assembly type slope support waterproof system, and relates to the technical field of slope support waterproof construction of underground structure engineering, and the assembly type slope support waterproof system comprises a slope A and a foundation pit bottom B. A buttress mechanism is arranged at the bending position of the slope A and the foundation pit bottom B. A foundation pit bottom drainage mechanism is arranged in the foundation pit bottom B. The assembly type slope support waterproof mechanism is used for achieving assembly of a slope support waterproof system. The assembly type slope support waterproof mechanism comprises a prefabricated support steel plate unit; prefabricating the concrete support plate units; the supporting steel plate and the concrete supporting plate are applied in a combined mode, compared with a pure concrete supporting plate, the complexity of hoisting supporting is reduced, the concrete buttress arranged at the slope bottom is beneficial to assisting slope supporting of the concrete supporting plate, and therefore a good stable slope supporting foundation is formed; and further, the integrated fixing fastener, the hook and other assemblies are used for reinforcing fixed connection, so that the side slope plays a relatively stable role.
Owner:YUNNAN AGRICULTURAL UNIVERSITY +1

Connection structure shared by photovoltaic system and metal roof system

Disclosed in the present invention is a connection structure shared by a photovoltaic system and a metal roof system, the connection structure comprising concrete buttresses, pre-embedded parts, adapters, cross beams, a metal roof main keel and a photovoltaic system main keel, wherein the lower portion of each pre-embedded part is buried in a corresponding concrete buttress, the upper end of the pre-embedded part is connected to a corresponding adapter, and the adapter is fixed to the upper portion of the concrete buttress; each cross beam is connected to a corresponding adapter by means of a first connector; the metal roof main keel is perpendicular to the cross beams and is welded and fixed to the side portions of the cross beams; and the photovoltaic system main keel is arranged in parallel to and above the metal roof main keel, and the photovoltaic system main keel is connected to a second connector fixed to the top of each cross beam. The present invention has the beneficial effects that the metal roof main keel and the photovoltaic system main keel are integrally mounted on the cross beams, and the cross beams are fixed to the buttresses, such that the integrity of the whole structure is good, and the stability and wind resistance of the whole roof system are significantly improved.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1

Shock insulation system with vertical stepped quasi-zero stiffness characteristic and design method thereof

The invention relates to the technical field of building seismic isolation, in particular to a seismic isolation system with a vertical stepped quasi-zero stiffness characteristic and a design method of the seismic isolation system. A building three-dimensional seismic isolation system with the vertical stepped quasi-zero stiffness characteristic comprises a horizontal seismic isolation support arranged on the top face of a lower buttress; the positive stiffness system comprises at least one vertical steel spring, and the two ends of the vertical steel spring are connected to the top face of the horizontal shock insulation support and the bottom face of the upper buttress correspondingly. The negative stiffness system comprises a variable-slope guide plate, a horizontal multi-layer annular spring and a supporting plate, the thickness of the variable-slope guide plate changes in the height direction of the variable-slope guide plate, one end of the horizontal multi-layer annular spring abuts against the variable-slope guide plate, the horizontal multi-layer annular spring is connected to the supporting plate, and the supporting plate is connected to the upper buttress; the horizontal multi-layer annular spring can be driven to move along the surface of the variable-slope guide plate by changing the distance between the upper buttress and the lower buttress, and the horizontal multi-layer annular spring moves along the surface of the variable-slope guide plate, so that the length of the horizontal multi-layer annular spring is changed, and then negative stiffness is provided.
Owner:CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD +1

Integrated underpinning structure for bridge in deep foundation pit of urban tunnel and construction method

The present invention relates to an integrated underpinning structure for a bridge in a deep foundation pit of an urban tunnel, the integrated underpinning structure comprising an original bridge bearing platform, an expansion bearing platform and a tunnel reverse constructed roof slab‌, wherein the original bridge bearing platform, the expansion bearing platform and the tunnel reverse constructed roof slab ‌are sequentially and fixedly connected into an integrated structure from inside to outside; the integrated structure serves as both a bridge underpinning force transmission structure and a roof slab‌ of a newly-built tunnel, and the integrated structure also serves as a first support for a tunnel deep foundation pit enclosure structure; a bridge pier and a bridge structure are sequentially provided on the upper portion of the original bridge bearing platform from bottom to top, and an original bridge pile is provided on the lower portion of the original bridge bearing platform; a reinforcement pile is provided at the bottom of the expansion bearing platform, and a temporary buttress is provided at the top during construction; a jack is provided on the top surface of the temporary buttress and is used to assist in controlling the bridge structure to settle into a safety range during tunnel construction; and two sides of the tunnel reverse constructed roof slab‌ extend to the top ring beam of the tunnel in a direction of the cross section of the foundation pit and are connected to the top ring beam. The underpinning structure provided in the present invention serves as both the bridge underpinning force transmission structure and the roof slab‌ of the newly-built tunnel.
Owner:JSTI GRP CO LTD +2

Series GIS equipment foundation settlement monitoring system based on laser ranging method

The embodiment of the invention provides a series GIS equipment foundation settlement monitoring system based on a laser ranging method.The series GIS equipment comprises a plurality of buttresses, the series GIS equipment foundation settlement monitoring system comprises a plurality of measuring units, and each measuring unit comprises two arm rods, a plurality of connecting rods and a plurality of connecting rods, each measuring unit is arranged between two adjacent buttresses, so that the tail ends of the two arm levers are positioned right above the two adjacent buttresses; the laser displacement meters are arranged at the tail ends of the arm levers to measure the distances from the arm levers to the corresponding buttresses in the vertical direction and send the measured values to the corresponding measuring units; the data receiving and processing module is used for receiving relative settlement of the adjacent buttresses of each measuring unit and calculating relative settlement and absolute settlement of all the buttresses relative to the reference buttress; wherein the relative settlement of the adjacent buttresses is obtained based on measured values of the laser displacement meters on the two sides of each measuring unit. Therefore, effective and accurate GIS equipment foundation settlement monitoring is realized.
Owner:STATE GRID CORPORATION OF CHINA +1

Fabricated debris flow comprehensive silt arrester system and construction method

ActiveCN119041359ASolve technical problems of limited assembly designflexible structureBarrages/weirsClimate change adaptationButtressBrick
The invention discloses an assembly type debris flow comprehensive silt arrester system and a construction method. The system foundation part is cast in place, and other parts are assembled; the mountain-shaped base part is a system stabilizing framework and provides an assembly connecting base; the lower gravity wall and the upper grating wall of the fence and row combination can be flexibly designed; the apron part comprises a dam front apron and a dam rear apron which are brick paving piece layers covering a ditch bed, adjacent brick paving pieces are positioned and interlocked, and the dam front apron is in a step ascending type; the flow guide wall is a wall brick piece up-down staggered joint masonry wall body; the wing wall is formed by splicing wing wall plates in a layered mode, each layer is provided with one plate, and the wing wall is vertically positioned and interlocked. And the connecting fasteners comprise prestressed through twisted steel bars for connecting the buttress row and the blocking and discharging part, and through steel bars, non-through steel bars and anchor rods at other parts. Comprehensive protection of the channel, the channel bed and the bank slope is achieved, and the fabricated concrete silt arrester scheme is complete. A brand-new main dam body structure is utilized, the effective range of technical elements of dam design and transformation is expanded, and the system can adapt to debris flow prevention and control targets for a long time.
Owner:INST OF MOUNTAIN HAZARDS & ENVIRONMENT CHINESE ACADEMY OF SCI

Incremental pushing temporary buttress design method based on reinforcement learning

The invention belongs to the technical field of bridge construction, and particularly relates to a design method for a temporary pushing buttress based on reinforcement learning. The method comprises the following steps that reinforcement learning modeling is carried out, and a temporary buttress design agent is constructed; constructing a finite element simulation environment for simulating the structural response of the buttress scheme; training a temporary buttress design agent by adopting a depth deterministic strategy gradient algorithm; and strategy network deployment: deploying the trained temporary buttress design agent model to an engineering design platform, and realizing automatic generation of a pushing temporary buttress design scheme in an actual scene. According to the method, the intelligent and dynamic temporary buttress design optimization is realized by constructing the multi-target reinforcement learning framework including buttress stability, material consumption and girder deformation and combining with the depth deterministic strategy gradient algorithm to train the intelligent body capable of automatically carrying out temporary buttress design under different environment constraints; and the design efficiency of the temporary buttress is obviously improved.
Owner:CCCC SECOND HIGHWAY ENG CO LTD

Method and system for intelligently detecting displacement of seismic isolation support during earthquake

The invention relates to the technical field of seismic isolation support displacement measurement, and particularly discloses an intelligent detection method and system for seismic isolation support displacement during an earthquake. The system comprises a seismic isolation support displacement intelligent detection device and a signal control processing system, wherein the seismic isolation support displacement intelligent detection device comprises a seismic isolation support, an upper buttress, a lower buttress, a displacement signal transmitter, a displacement signal acquisition area, a protective cover and a protective coaming; the shock insulation support is located between the upper buttress and the lower buttress. The displacement signal transmitter is mounted on the lower buttress; the displacement signal acquisition area is positioned on the lower side of the upper buttress; the protective cover is installed between the upper buttress and the lower buttress, and the protective coaming is installed on the periphery of the protective cover. The signal control processing center has the functions of displacement signal triggering, collection, time synchronization, information processing and early warning and forecasting. According to the intelligent detection method and system for the displacement of the seismic isolation support, the deformation information of the seismic isolation support during an earthquake can be conveniently obtained, and intelligent self-inspection and early warning of the displacement change of the seismic isolation support during and after the earthquake are realized.
Owner:CHINA RAILWAY CONSTR GROUP CO LTD

Upper buttress template supporting and adjusting device for shock insulation support

The utility model provides an upper buttress template support adjusting device for a shock insulation support, which comprises a support adjusting unit arranged on one side of an upper buttress, the bottom of the upper buttress is connected with a lower buttress, the support adjusting unit comprises a threaded column and a sleeve, the bottom of the threaded column is supported on the lower buttress, the top of the sleeve is provided with a top plate, and the top plate is connected with the threaded column. The position of the sleeve is changed along the axis of the threaded column, so that the top plate sequentially passes through the batten and the back ridge to fix the bottom formwork and the end formwork, and the upper buttress, the bottom formwork and the end formwork are connected to form a pouring space of the partition damper. The device is compact in structure, ingenious in design, capable of greatly improving the efficiency of installing and fixing the upper buttress formwork, easy to operate and good in using effect.
Owner:CHINA COMM GUANGHANG BUREAU FIFTH ENG CO LTD +1

Protective demolition structure for existing building masonry infilled wall

The utility model provides an existing building masonry infilled wall protective dismantling structure which comprises a suspended ceiling, infilled walls and a frame beam, the infilled walls are arranged on the two sides of the suspended ceiling, and the suspended ceiling is located on the lower portion of the frame beam. The utility model has the advantages that the channel steel cross beam, the angle steel bracket, the channel steel buttress, the suspender, the tapered end channel steel and the tapered end nut are arranged in a matched manner, and the double-spliced channel steel cross beam is matched with the angle steel bracket and the channel steel buttress, so that a powerful supporting system is provided for the infilled wall. The structure can effectively guarantee the stability of the remaining wall body and the suspended ceiling structure, and the suspended ceiling is prevented from being damaged in the wall body dismantling process. By arranging the suspenders, the lock head channel steel and the lock head nuts, the span of the double-spliced channel steel cross beam can be effectively reduced, the safety of the wall body is ensured, and the protective construction mode can effectively avoid damage and loss to the suspended ceiling caused by dismantling work. In this way, protective dismantling of the infilled wall can be achieved on the premise that the safety of the suspended ceiling is not affected, and the problems existing in the prior art are effectively solved.
Owner:XINJIANG UNIVERSITY

Large-diameter circular coal bunker retaining wall structure

The utility model belongs to the technical field of coal bunker retaining walls, and particularly relates to a large-diameter round coal bunker retaining wall structure which comprises a coal retaining wall, buttresses and a foundation, the coal retaining wall is round, the buttresses are distributed on the outer side wall of the coal retaining wall in a round array shape, the top end of the foundation is connected with a round limiting block, and the round limiting block is connected with the coal retaining wall. A group of drainage holes are formed in the surface of the round limiting block in a round array shape in a penetrating mode, and a water collecting groove is reserved between the round limiting block and the coal blocking wall. Therefore, the problem that the rigidity of the flexible steel beam is gradually worse due to the influence of complex weather conditions such as strong wind and rain and snow is effectively reduced. According to the design, the durability of the retaining wall structure of the large-diameter circular coal bunker is improved, accumulated water in the water collecting tank can be conveniently discharged to the outside through the arranged drainage holes, the water dredging efficiency is improved, and the corrosion risk of residual water to the coal retaining wall is further reduced.
Owner:CHINA ENERGY ENG GRP SHANXI ELECTRIC POWER CONSTR NO 3 CO LTD

Positionable aluminum tray

The utility model belongs to the technical field of trays, and relates to a positionable aluminum tray, which comprises a tray, a pop-up mechanism and a positioning device, when a heavy object is placed on the tray, an elastic bearing plate begins to deform, a battery supplies power to an electromagnetic sliding block, so that the electromagnetic sliding block is full of magnetism, the electromagnetic sliding block and a magnet attract each other, and the electromagnetic sliding block slides to the topmost end; when the tray is transferred by the forklift, the electromagnetic sliding block restores to the original position again, at the moment, the included angle of the connecting rod is gradually increased to be close to 180 degrees, the supporting rod is driven to move towards the interior of the buttress, and therefore the supporting rod moves towards the outer side of the buttress, the crank is driven to rotate clockwise, and the positioning device is driven to move to the outer side of the buttress; by means of the linkage mechanism of the gravity and the popping mechanism, the contradiction problem that metal shielding and physical protection cannot coexist can be solved, and then the signal quality and the protection performance of the tray can be guaranteed.
Owner:TIANJIN BANGFU GUANCHUANG TECHNOLOGY CO LTD

Tamper resistant container

A vacuum formed, tamper resistant container resists deformation of the sides thereof that might otherwise permit access to contents of the container without removal of the lid. Downward protruding lid features reinforce the wall of the container base, and buttress features included in the rim of the base extend from a base flange diagonally downward and inward to the inner rim of a recessed shelf, thereby resisting downward rotation of the wall beneath the lid protruding features. In embodiments, attachment tabs surrounded by frangible boundaries are incorporated in the lid and attached to the base by living hinges, such that removal of the lid requires breaking of the frangible boundaries and detachment of the lid from the attachment tabs. Pucker elements associated with the attachment tabs can cause the attachment tabs to pivot away from the lid when the attachment tabs are detached from the lid.
Owner:POLARPAK

Fabricated underwater suspension tunnel

The utility model discloses an assembly type underwater suspension tunnel which comprises pile foundations, connecting piers, damping supports, a lower cross beam, an upper cross beam, a double-ball-head connecting rod and a tunnel pipe joint, the pile foundations are anchored into the seabed, and tenons are fixed to the top ends of the pile foundations; mortises are formed in the lower end faces of the connecting piers, and the tenons are assembled in the mortises; the damping support is fixed on the connecting pier; the lower cross beam is fixed on the two adjacent damping supports; the upper cross beam is fixedly connected with a tunnel pipe joint; the upper cross beam and the lower cross beam are connected through a plurality of double-ball-head connecting rods. The upper cross beam, the lower cross beam and the double-ball-head connecting rods form a plane truss, so that it is guaranteed that constraint of a tunnel has enough transverse and vertical rigidity; a damping support is arranged between the lower cross beam and the pile foundation to guarantee the anti-seismic performance of the structure; the buttress adapts to longitudinal deformation of the tunnel through rotation of the two ends of the double-ball-head connecting rod in the longitudinal direction of the tunnel.
Owner:HUBEI ZHONGGUANG HIGHWAY SURVEY & DESIGN CO LTD +1

Fabricated raft foundation connected by pored inserting plates in grouting manner

The utility model relates to the technical field of building foundation construction, and mainly provides an assembly type raft foundation connected through pored inserting plates in a grouting mode. The foundation comprises a base body and hole inserting pieces, the base body is provided with a top installation face and two splicing faces symmetrically arranged on the two sides of the top installation face, the splicing faces are perpendicular to the top installation face, the top installation face is provided with a plurality of buttress assembly holes, the buttress assembly holes are arranged in a rectangular array, inserting grooves are formed in the splicing faces, and the hole inserting pieces are arranged in the inserting grooves. One end of each inserting groove communicates with the top mounting face, the base bodies of the multiple assembly type bases are spliced through the splicing faces, the hole inserting pieces are inserted into the spliced inserting grooves, and the hole inserting pieces and the spliced inserting grooves are integrally and fixedly connected through concrete pouring. The problems that in the prior art, in the working process after a prefabricated foundation is combined and assembled, the connection stability is poor, and the working life is difficult to guarantee can be solved.
Owner:POWERCHINA HUBEI ELECTRIC ENGINEERING CO LTD +1

Buttress for ground photovoltaic construction

The utility model relates to the photovoltaic field, discloses a buttress for ground photovoltaic construction, and solves the problems that the surface of laid concrete is uneven sometimes, the buttress is easy to be unstable after being installed when the buttress is directly installed on the concrete, a new concrete installation surface needs to be used for re-laying the concrete, and the construction cost is low. The buttress for the ground photovoltaic construction solves the problems that a buttress main body is arranged, a pushing mechanism is arranged in the buttress main body, a limiting mechanism is arranged on the inner side of the pushing mechanism, and through the arrangement of the pushing mechanism and the limiting mechanism, the buttress main body can be driven to move, and the working efficiency is influenced. The pushing mechanism is rotated to drive the limiting mechanism to move towards the middle, the limiting mechanism is limited, the lower portion of the buttress can make stable contact with the ground, and therefore the purpose of improving the installation efficiency is achieved.
Owner:POWERCHINA JIANGXI ELECTRIC POWER ENGINEERING CO LTD

Device for dismantling overline simply supported girder bridge by rotating body

The utility model discloses a device for dismantling an overline simply supported girder bridge by rotating, which relates to the technical field of bridge dismantling, and comprises a horizontal positioning spherical hinge, an arc-shaped slideway, a plurality of supporting legs, a plurality of supporting legs and a plurality of supporting legs, after the rotating body section and the support are cut and separated, the supporting foot and the horizontal positioning spherical hinge can support the rotating body section, the integrated connecting mechanism is integrally connected with the rotating body section, the temporary cable bent tower is arranged on the rotating body section, and the rotating body mechanism is used for driving the rotating body section to move in the direction away from a line along the arc-shaped sliding way. The overline simply supported girder bridge is split into the rotating body section and the non-rotating body section, the supporting mechanism is reformed through the horizontal positioning spherical hinge, the annular sliding way and the supporting foot, the rotating body mechanism drives the rotating body section to move in the direction away from a line along the arc-shaped sliding way to the position where the line is not affected, and then disassembly and disassembly work is conducted. Lines below the bridge can be completely avoided in the construction process.
Owner:BEIJING UNIV OF TECH +1