Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

145results about How to "Improve demolition efficiency" patented technology

Forming process and forming mold for precast concrete box-type house

The invention discloses a forming process and a forming mold of a precast concrete box-type house. The forming process comprises the following steps: step S1, pouring concrete out of a house bottom plate; s2, a wall plate inner mold and a wall plate outer mold are mounted on the house bottom plate subjected to pouring forming, and a wall plate pouring cavity is formed between the wall plate inner mold and the wall plate outer mold; s3, a top plate mold is in lap joint with the wallboard inner mold, and a top plate pouring groove is formed between the top plate mold and the wallboard outer mold; s4, a temporary supporting rod is arranged at the bottom of the top plate mold; s5, concrete is poured into the wall plate pouring cavities and the top plate pouring grooves, and house wall plates and roof plates are formed; s6, after the house wall plates and the roof plate are poured and formed, the wall plate inner mold, the wall plate outer mold and the temporary supporting rods are removed; the top plate formwork is a non-dismantling formwork, and the top plate formwork is reserved on the roof plate formed through pouring. The production efficiency of the box-type house can be improved.
Owner:华润智筑科技(定安)有限公司 +1

Construction method of make-up water pipe transformation project

According to the construction method of the make-up water pipe reconstruction project, by means of deep fusion of three-dimensional modeling laser scanning and a geographic information system, the existing pipe and surrounding conditions are accurately surveyed, a route is scientifically planned, and the construction risk and the change possibility are reduced; and when the old pipe is dismantled, the flexible airtight packing cabin is matched with colloid injection to ingeniously stop water in a segmented mode, orderly cutting is matched, the pipe section is safely dismantled, blasting hazards are avoided, and the dismantling efficiency is improved. When the new pipe is laid, the damping and noise reduction cushion layers are arranged in the grooves, the external force resistance of the new pipe is enhanced, fine verification is conducted after sealing connection, and the laying precision and quality are guaranteed. After new pipe connection is completed, tracer particle water is injected, deep inspection is conducted, segmented pressure testing is combined, hidden danger all-around troubleshooting is conducted, repairing and perfecting are conducted in advance, the reliability of the new pipe is greatly improved, the construction efficiency, quality and water supply long-term stability of a make-up water pipe modification project are remarkably improved, and the operation and maintenance cost is reduced.
Owner:华能海南发电股份有限公司海口电厂 +1

Fixing device for bridge group anchor and construction method

The invention relates to a fixing device for bridge group anchors and a construction method, the fixing device for bridge group anchors comprises a plurality of steel strands and anchor bearing plates, and further comprises a mounting frame, the mounting frame comprises a back plate and a plurality of partition plates, the partition plates are fixedly mounted on the back face of the back plate, the partition plates divide the back plate into a plurality of compartments, and round holes are formed in the portions, in the middles of the compartments, of the back plate; and the anchor boxes are fixedly installed in the compartments, and installation parts of the anchor boxes penetrate through the round holes, are located on the front face of the back plate and are suitable for steel strands to penetrate through. According to the fixing device, an installation pipe is fixedly installed on a fixing plate, a steel strand penetrates through the installation pipe, and a pipeline installation hole is formed in an installation part of an anchor box and used for installing the installation pipe in a penetrating mode; the angle of the anchor box is adjusted and fixed when the anchor box is mounted, then the mounting pipe and the steel strand are positioned and fixed, the influence on the mounting angle of the steel strand in the subsequent construction process is avoided, the incident angle of the steel strand can be accurately controlled, and firmness and reliability are achieved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1

Photovoltaic combiner box

The utility model relates to the technical field of photovoltaic combiner boxes, in particular to a photovoltaic combiner box which comprises a mounting plate, fixing boxes distributed in an array are mounted on the front end face of the mounting plate, clamping blocks are clamped in the fixing boxes, and a photovoltaic combiner box body is fixedly connected to the inner side faces of the clamping blocks. According to the photovoltaic combiner box mounting plate, the whole mounting plate can be fixed on a wall through the supporting plates and the second fastening bolts, then the whole photovoltaic combiner box can be conveniently and rapidly mounted or dismounted in a clamping mode, time and labor are saved, and the mounting plate is convenient to mount and dismount. The photovoltaic combiner box dismounting efficiency is improved, third fastening bolts are rotated to relieve limiting of the containing plate, in this way, a movable rotating plate and a rotating plate which are rotationally installed can rotate relative to each other so that the containing plate can be moved out of the photovoltaic combiner box, and electrical installation guide rails on the containing plate can be comprehensively displayed; therefore, electrical components in the photovoltaic combiner box can be detected.
Owner:KORORENA ELECTRIC CO LTD

Building demolition operation platform and operation method thereof

The invention discloses a building demolition operation platform and an operation method thereof.The building demolition operation platform comprises a base system, stand columns, a lifting system, a main structure platform and a transportation system, the base system is used for supporting the lifting system, the main structure platform and the transportation system through the stand columns, one end of the lifting system is slidably connected with the stand columns, and the other end of the lifting system is fixedly connected with the main structure platform; the main structure platform is used for ascending and / or descending relative to the stand column through the lifting system and conducting building demolition operation when stopping moving, and the transportation system is fixed to the main structure platform and used for transporting building materials generated by building demolition operation. By adopting the embodiment of the invention, not only can the dismantling efficiency of building dismantling be improved, but also the potential safety hazard in the building dismantling process can be reduced.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD

Pile dismounting equipment

The utility model discloses pile dismounting equipment which comprises a dismounting and hoisting platform, a vibratory hammer, a clamping device and a fluid jetting device, the vibratory hammer is connected with the dismounting and hoisting platform, and the output end of the vibratory hammer is connected with the top end of a cylindrical pile; the clamping device is connected with the dismounting and hoisting platform and is used for clamping the cylindrical pile; the fluid jetting device is connected with the dismounting and hoisting platform and movably arranged on the dismounting and hoisting platform in the axial direction of the cylindrical pile, and the fluid jetting device is used for jetting fluid to break through soil around the cylindrical pile. According to the pile disassembling equipment, the vibratory hammer is arranged at the top of the cylindrical pile to vibrate and hit the cylindrical pile, and the fluid jetting device is arranged to impact soil around the cylindrical pile, so that the friction force between a seabed and the cylindrical pile can be reduced, and the cylindrical pile can be conveniently pulled out of the seabed; the dismounting efficiency of the cylindrical pile is improved, the dismounting cost of the cylindrical pile is reduced, and the safety in the dismounting process of the cylindrical pile is improved.
Owner:CHINA THREE GORGES CORPORATION

A tower crane dismantling auxiliary device

The present application discloses a tower crane dismantling auxiliary device, which is used to assist in dismantling the tower crane and improve the dismantling efficiency and safety. The present application includes: a main arm, a secondary arm, a pulley, a back-pull assembly and a side-pull assembly; one end of the secondary arm is fixed to the main arm, the other end of the secondary arm is fixed to the arm frame of the tower crane, the secondary arm is used to support the main arm, one end of the main arm is connected to the pulley, the other end of the main arm is fixed to the arm frame of the tower crane, the pulley is fixed to the upper end of the main arm through a rotating shaft, the pulley is used to support the steel cable of the hoist of the tower crane, the steel cable passes around the pulley, one end of the steel cable is connected to the hoist of the tower crane, and the other end is connected to the dismantling part, the steel cable lifts or lowers the dismantling part under the drive of the hoist, the back-pull assembly fixes the main arm and provides a backward balancing pull for the main arm, and the side-pull assembly fixes the main arm and provides a lateral balancing pull for the main arm.
Owner:GUANGXI SPECIAL EQUIP SUPERVISION & INSPECTION INST P R CHINA +1

Road isolation belt

The utility model discloses a road isolation belt, and relates to the technical field of road construction equipment. The device structurally comprises a linear cement pier, a right-angle cement pier, a direct stand column, a right-angle connecting stand column, a partition plate and a cantilever frame used for installing a lamp strip and a spray pipe. Rectangular through grooves communicating with the upper end faces of the linear cement piers are formed between the two ends of the linear cement piers. Rectangular insertion holes matched with the straight stand columns in an inserted mode are formed in the centers of the upper ends of the linear cement piers; a partition plate is installed between every two adjacent direct stand columns. Through the combined design of the linear cement piers, the right-angle cement piers, the direct stand columns, the right-angle connecting stand columns and the partition plates, an isolation belt can be rapidly built on a road; screws are not needed in the mounting process, so that the mounting and dismounting efficiency is improved; the design of the cantilever frame facilitates installation of equipment such as a lamp strip and a spray pipe, the lamp strip and the spray pipe can be fixed at different height positions through the U-shaped groove body and the kidney-shaped through hole, and the lighting and dust falling effects of a construction site are improved.
Owner:东平县公路事业发展中心

Water pressure driving type fire-fighting drilling device and fire-fighting drilling water gun

The utility model relates to the technical field of fire fighting appliances, in particular to a water pressure driving type fire fighting drilling device which comprises a water guide pipe, a drilling assembly arranged at the rear end of the water guide pipe, an impeller and a rotating shaft, the impeller and the rotating shaft are arranged in the water guide pipe, and a plurality of first drainage holes are formed in the position, opposite to the rear end of the impeller, of the water guide pipe. The rotating shaft is rotationally connected with the water guide pipe, the front end of the rotating shaft is fixedly connected with the rear end of the impeller, and the rear end of the rotating shaft is fixedly connected with the drilling assembly so that the drilling assembly can be driven to rotate when the impeller is driven by water flow to rotate. The utility model further provides a fire-fighting drilling water gun which comprises a water gun base, and the water gun base is provided with the water pressure driving type fire-fighting drilling device. The device is high in forcible entry drilling efficiency, can effectively cool a forcible entry drilling area, and is favorable for guaranteeing the personal safety of firefighters.
Owner:江永县消防救援大队

Building steel bar dismantling mechanism

A building steel bar dismantling mechanism comprises a fulcrum base, a left supporting frame A, a left supporting frame B, a right supporting frame A, a right supporting frame B and a clamp body structure, one end of the left supporting frame A and one end of the right supporting frame A are rotationally installed in the middle of the fulcrum base, and a left rotating shaft structure and a right rotating shaft structure are installed at the other end of the left supporting frame A and the other end of the right supporting frame A respectively. One end of the left supporting frame B and one end of the right supporting frame B are rotationally connected with the left supporting frame A and the right supporting frame A through a left rotating shaft structure and a right rotating shaft structure respectively, the other end of the left supporting frame B and the other end of the right supporting frame B are rotationally installed on the side portion of the clamp body structure, and a right-hand threaded hole and a left-hand threaded hole are formed in the left rotating shaft structure and the right rotating shaft structure respectively. A rotating screw structure is installed in the right-hand threaded hole and the left-hand threaded hole and further connected with a rotating driving mechanism. The steel bar dismounting device is simple in structure, the steel bar dismounting efficiency can be improved, and steel bar dismounting operation is more convenient and safer.
Owner:CHONGQING JIAOTONG UNIV TRAFFIC SAFETY TECH RES INST CO LTD

Center ditch inspection well steel core mold

The utility model provides a central ditch inspection well steel core mold, which is characterized in that a template comprises a plurality of hinged plates which are hinged with one another, and the plurality of hinged plates are connected end to end to form a square cylindrical structure corresponding to an inspection well; the two sets of supporting structures are detachably supported at the two ends of an inner cavity of the formwork respectively, and each supporting structure comprises a transverse support and an inclined support. The two ends of the transverse support are supported on the inner walls of the two opposite sides of the formwork through first supporting pieces correspondingly, the two ends of the inclined support are supported on the two opposite corners of the formwork through second supporting pieces correspondingly, the formwork formed by a plurality of hinged plates is arranged, and the formwork is detachably supported in an inner cavity of the formwork through two sets of supporting structures. In the pouring process, the rigidity of the formwork can be guaranteed, the pouring quality is improved, the supporting structure is dismantled after pouring is completed, due to the fact that the hinged plates are formed in a hinged mode, dismantling can be fast, dismantling efficiency is improved, and formwork loss caused by violent dismantling is avoided.
Owner:CHINA RAILWAY NO 9 GROUP CO LTD

A mobile integrated pipe gallery inner formwork

The present invention relates to the field of building formwork, and in particular to a mobile integrated pipe gallery inner formwork, comprising: a base, universal wheels arranged at the bottom of the base, a truss fixedly arranged on the base, an upper formwork fixedly connected to the truss, two corner formworks hinged to both sides of the upper formwork, two side formworks fixedly connected to the bottom of the corner formwork, and an opening and closing mechanism arranged between the two side formworks. The universal wheels are used for the free movement of the inner formwork, and the angles between the corner formworks and the side formworks and the upper formworks can be changed through the opening and closing mechanism, so as to complete the positioning of the inner formwork and the guide wall. Compared with the installation of scaffolding, the operation is simple and the precision is high. When the formwork needs to be dismantled, the opening and closing mechanism can also separate the side formworks and the corner formworks from the side wall of the pipe gallery, thereby improving the dismantling efficiency.
Owner:TIANJIN JIUWEI NEW MATERIALS CO LTD

Roof structure and vehicle

The invention provides a vehicle roof structure and a vehicle, and relates to the technical field of vehicles, the vehicle roof structure comprises a vehicle roof component and a mounting structure, and a mounting hole communicated with a space in the vehicle is formed in the vehicle roof component; the mounting structure comprises a mounting seat arranged on the mounting hole and a connecting piece, the connecting piece is provided with a connecting position and a containing position, the connecting position penetrates through the mounting seat outwards from the space inside the automobile, the containing position penetrates through the mounting seat inwards from the space outside the automobile, and the connecting piece can be used for being detachably connected with the luggage rack at the connecting position. According to the roof structure, the luggage rack can be rapidly fixed to the vehicle to achieve the decoration effect, and the attractiveness of the vehicle can be improved. Moreover, when the luggage rack does not need to be arranged on the vehicle, the luggage rack can be quickly detached from the vehicle, and then the connecting piece can be switched from the connecting position to the accommodating position, so that the connecting piece is prevented from obviously protruding out of the roof component and being exposed out of the mounting hole, and the attractiveness of the detached luggage rack is ensured.
Owner:FUYAO GLASS IND GROUP CO LTD

Outer wall scaffold for green building construction

The utility model relates to an exterior wall scaffold for green building construction, which comprises a base and two groups of lifting components, and the two groups of lifting components are arranged on two sides of the upper surface of the base at intervals along the transverse direction; the lifting assembly comprises a reciprocating motor and a bearing seat, the bearing seat is arranged above the reciprocating motor, a threaded lead screw is rotationally connected between the reciprocating motor and the bearing seat, sliding seats are arranged on the threaded lead screw in a meshed and sliding mode, and a conveying table is arranged between the opposite side faces of the two sliding seats. According to the outer wall scaffold for green building construction, the two lifting assemblies arranged at the upper end of the base are utilized, the conveying table can be driven to do vertical reciprocating lifting motion, the height of the conveying table can be adjusted along with the change of the construction progress, and the building and dismantling efficiency is greatly improved; the problem that a traditional scaffold needs to be constructed and dismantled by workers for many times is solved; in addition, due to the fact that manual high-altitude operation is reduced, the safety risk is also reduced.
Owner:ZHONGTIAN URBAN INVESTMENT (FUJIAN) CONSTR CO LTD

Forcible entry tool for emergency fire fighting

The utility model relates to the field of forcible entry tools, and discloses a forcible entry tool for emergency fire fighting, which comprises a fixing rod, a forcible entry device and a fixing plate, the forcible entry device is arranged at one end of the fixing rod, the fixing plate is arranged at the other end of the fixing rod, and the middle of the rear end of the fixing plate is fixedly connected with a limiting block. The middle of the front end of the fixing plate is fixedly connected with the other end of the fixing rod, the forcible entry device comprises a fixing block, a protruding block is fixedly connected to one side of the fixing block, a limiting groove is fixedly connected to the position, close to the lower portion, of the front end of the fixing block, and a first connecting rod is fixedly connected to one side of the rear end of the limiting groove. A second connecting rod is fixedly connected to the other side of the rear end of the limiting groove, and a handle is fixedly connected to the position, close to the lower portion, of the other side of the fixing block. According to the emergency fire-fighting forcible entry tool, window breaking and burglary-resisting window forcible entry are effectively conducted through the fixing plate, and meanwhile the forcible entry device is arranged to dismantle a single handrail.
Owner:胡建峰

Industrial personal computer convenient to disassemble and repair

The utility model provides an industrial personal computer convenient to disassemble and repair, which belongs to the technical field of industrial personal computers and comprises a base, a bearing plate is fixedly connected in the base, a machine body is arranged on the upper end face of the bearing plate, a limiting mechanism used for limiting the machine body is arranged on the base, and the machine body is rotatably connected with a cover plate through a hinge. A mounting box is fixedly connected to the right end of the upper end face of the cover plate through screws, two pressing blocks are symmetrically and slidably connected into the mounting box, clamping plates are fixedly connected to the lower end faces of the inner ends of the two pressing blocks, and a guide column is slidably connected between the two clamping plates. Through the arrangement of the base, the bearing plate and the limiting mechanism, the industrial personal computer can be rapidly disassembled and assembled, screws do not need to be frequently disassembled and assembled, disassembly and assembly are convenient and rapid, the industrial personal computer can be conveniently and rapidly disassembled and repaired, the disassembly and repair efficiency is improved, and the problem that in the prior art, the screws need to be frequently disassembled and assembled for disassembling and repairing the industrial personal computer, and consequently disassembly and repair are inconvenient is solved.
Owner:成都纵横通达信息工程有限公司

Segmented foldable shrinkage core for box girder

A box girder segmented foldable shrink core mold, which comprises segmented core molds, stacked rod longitudinal connecting steel wires and core mold longitudinal connecting bolts; the adjacent edges of the segmented core molds are connected by the core mold longitudinal connecting bolts to form a whole; a stacked rod longitudinal connecting steel wire is connected between the adjacent segmented core molds. The box girder segmented foldable shrink core mold has the following beneficial effects: the box girder folding inner mold can be stably folded and unfolded, and can be stably separated from the concrete, and the operation is convenient, so that the dismounting efficiency and construction safety of the box girder core mold can be improved.
Owner:CHINA RAILWAY SIXTH GROUP CO LTD +1

Connector fixing structure

The utility model discloses a connector fixing structure which comprises a contactor, and one side of the contactor is provided with an outer cover. The mounting frame is arranged on one side of the front end and the rear end of the outer cover, the mounting frame is fixedly connected with the outer cover, a sliding groove is formed in the mounting frame, a mounting plate is arranged in the sliding groove, the mounting plate is in sliding fit with the sliding groove, and a second rotating rod is arranged at the end, away from the outer cover, of the mounting plate; the second rotating rod is rotationally connected with the mounting plate, and one end of the second rotating rod extends out of the mounting frame; the extrusion rods are fixedly arranged at one end, close to the outer cover, of the mounting plate, the number of the extrusion rods is four, and the extrusion rods are distributed at equal intervals, so that the problems that the connector is inconvenient to disassemble, the whole connector needs to be disassembled when the connector needs to be disconnected, and the fixing position of a contactor is difficult to adjust by the outer cover of the connector are solved; and outer covers matched with the contactors need to be replaced when the contactors with different lengths are fixed.
Owner:东莞市景诚实业有限公司

Dismantling method of river-crossing double-cantilever aqueduct structure

The invention provides a dismantling method for a river-crossing double-cantilever aqueduct structure. The dismantling method comprises the following steps that firstly, blasting sections are divided; the aqueduct structure is divided into a left blasting section, a river-crossing blasting section and a right blasting section from left to right; 2, dividing blasting areas of all the blasting sections; thirdly, blast holes in all the blasting areas are constructed; step 4, charging explosives in each blast hole and installing a detonating element; 5, mounting a detonating network of each blasting section; step 6, detonating; the river-crossing blasting section is firstly detonated, then the left blasting section and the right blasting section are detonated by adopting a delayed detonating technology, the detonating direction of the left blasting section is from left to right, and the detonating direction of the right blasting section is from right to left; and 7, checking after explosion. According to the method, the construction efficiency of dismantling the river-crossing double-cantilever aqueduct structure is improved.
Owner:SINOHYDRO BUREAU 8 CO LTD

Formwork for water conservancy project

The utility model relates to the technical field of hydraulic engineering, in particular to a hydraulic engineering formwork which comprises a fixing plate, an adjusting assembly is arranged on the top of the fixing plate, and installation assemblies are arranged on the two sides of the fixing plate. The adjusting assembly comprises a sliding groove, the sliding groove is formed in the top of the fixing plate, the inner wall of the bottom end of the sliding groove is movably connected with a sliding plate, the middle of the top of the sliding plate is fixedly connected with sliding blocks, the interiors of the two sliding blocks are jointly and movably connected with a two-way threaded rod through threads, and one end of the two-way threaded rod is fixedly connected with a crank. According to the formwork for the water conservancy project, through two sliding blocks and a two-way threaded rod in the adjusting assembly, the fixing plates on the two sides can move relatively, the distance between the two fixing plates can be adjusted by rotating a crank according to needs, and the two sliding blocks and the two-way threaded rod can be taken down together through sliding grooves to be conveniently disassembled and assembled; the disassembly and assembly efficiency is improved; the physical output is reduced.
Owner:YINGCHUAN CONSTR ENG CO LTD

Multi-step stair formwork supporting device

The utility model discloses a multi-step stair formwork supporting device, relates to the technical field of building construction, and solves the technical problem that a multi-step stair formwork supporting device in the prior art is inconvenient to dismantle. The multi-step stair formwork supporting device comprises a base. The connecting rod is detachably mounted on the base, and the axis of the connecting rod is perpendicular to the base; one end of the supporting pipe is installed on the connecting rod in a sliding mode in the axis direction of the connecting rod, and the axis of the supporting pipe and the axis of the connecting rod are located on the same straight line; the limiting piece is installed between the supporting pipe and the connecting rod and used for fixing the supporting pipe; in the working state, the base is installed at the top end of the n stair formwork, and the other end of the supporting pipe abuts against the bottom end of the (n + 1) stair formwork. Therefore, through the arrangement of the connecting rod, the base can be separated from the supporting device without cutting, so that the dismantling efficiency of the multi-step stair template supporting device provided by the embodiment of the utility model is improved.
Owner:CHINA NUCLEAR IND 24 CONSTR

Quick wall connecting piece for outer frame and connecting method

The invention relates to a wall connecting piece for a quick outer frame and a connecting method. The wall connecting piece for the quick outer frame comprises an extending steel pipe and a connecting piece, the locking mechanism is connected with the extension steel pipe, a socket connecting mechanism is arranged at the end, away from the extension steel pipe, of the locking mechanism, and the end, away from the locking mechanism, of the socket connecting mechanism is bent downwards to form a socket part; the wall body connecting mechanism is connected with the existing building main body; a socket slot matched with the socket part in a socket manner is formed in the wall body connecting mechanism; after the socket part is inserted into the socket groove from top to bottom, the socket groove and the socket part are limited, so that the extension steel pipe is connected with the wall body connecting mechanism; the locking mechanism and the wall connecting mechanism are arranged to be connected with the outer frame and the building body which need to be connected correspondingly, and efficient connection of the outer frame and the building body is achieved through socket matching of the socket connecting mechanism on the locking mechanism and the socket groove in the wall connecting mechanism.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Fire rescue forcible entry tool

The utility model discloses a fire rescue forcible entry tool which comprises a fixed crowbar, a flat hoe is fixedly connected to the bottom of the fixed crowbar, a pointed-end crowbar is fixedly connected to the position, perpendicular to a flat crow plate, of the top of the fixed crowbar, a movable sleeve is slidably connected to the outer surface of the fixed crowbar, and fixing rings are fixedly connected to the two ends of the movable sleeve. The side, close to the flat crow plate, of the fixed ring is fixedly connected with a movable ring. A fixing frame is fixedly connected to the outer surface of the side, close to the pointed-end pinch bar, of the moving ring, a rotating rod is rotationally connected to the inner wall of the fixing frame, a connecting rope is fixedly connected to the outer surface of the rotating rod, and a protective sleeve is fixedly connected to the end, away from the rotating rod, of the connecting rope. According to the fire rescue forcible entry tool, the position of the movable sleeve can be moved, so that a user can confirm the optimal acting point according to the actual situation, the force distribution is more uniform when the user forcibly exits, bending of a crowbar in the forcible entry process is prevented, meanwhile, the force can be saved, and the forcible entry efficiency is improved.
Owner:SHAANXI SAIJIU FIRE TECH CO LTD

Demolition construction method for existing river channel-crossing prestressed concrete bridge

The invention discloses a demolition construction method for an existing overpass river channel prestressed concrete bridge, and the method comprises the following specific steps: S100, carrying out the detailed detection and evaluation of the condition of the bridge, determining the condition of a bridge structure, and evaluating the demolition difficulty of the bridge; s200, carrying out simulation calculation on bridge demolition so as to determine an optimal segmented cutting demolition scheme, and determining the position of a first cutting point; s300, the prestress of the bridge is gradually released through professional equipment and technology, the internal stress of the bridge structure is adjusted, and the structure instability risk caused by sudden dismantling is reduced; s400, cutting the bridge from the position of the first cutting point according to a dismantling scheme of bridge simulation calculation, hoisting a part to be cut and removed by using hoisting equipment while cutting, and directly hoisting the part to a specified position by using the hoisting equipment after cutting is completed; when the bridge is cut, the cutting flatness and precision of the bridge sections need to be ensured.
Owner:CHINA RAILWAY 11TH BUREAU GRP CORP LTD

Construction method for climbing cone anchoring type bracket of pier cap of gate-type pier

The invention relates to the technical field of bridge construction, in particular to a gate-type pier cap climbing cone anchoring type bracket construction method which mainly solves the technical problem that large potential safety hazards exist when a cast-in-place pier cap is operated through a floor stand. The construction method comprises the steps that S1, pier top steel bars are bound; s2, preassembling a climbing cone assembly; s3, mounting a pier top template; s4, positioning a climbing cone; s5, pier top concrete pouring; s6, an inner side formwork of the pier top is dismantled, and concrete curing is conducted; s7, mounting a bracket and establishing a bracket system; s8, mounting a pier cap template; s9, pier cap steel bars and concrete are constructed; and S10, the formwork and the support system are dismantled. According to the construction method, the pre-buried climbing cone assembly is connected with the bracket and is matched with the support system to serve as a bracket to support pier cap construction, a floor stand does not need to be installed, the installation and detachment efficiency is improved, the labor cost is reduced, and meanwhile potential safety hazards are reduced; in addition, the structure can be reused, and is more energy-saving and environment-friendly.
Owner:CHINA RAILWAY SIXTH GROUP CO LTD +1

Cold anchor changing device for railway engineering

The utility model discloses a cold anchor changing device for railway engineering, which comprises an anchor changing cutter, a fastening component, a sliding component and a lifting component, the fastening component is of an inverted U-shaped structure, the sliding component is mounted on the outer side wall of the vertical end of the fastening component along the vertical direction, and the lifting component is mounted on the outer side wall of the vertical end of the fastening component. The lifting assembly is installed on the side, away from the fastening assembly, of the sliding assembly so that the lifting assembly can synchronously move up and down along with the sliding assembly conveniently, the lifting assembly comprises a driving part and a clamping part, the output end of the driving part downwards penetrates through the sliding assembly and then is connected with the clamping part, and the inner wall of the clamping part is matched with the top of the anchor changing cutter in shape so that the anchor changing cutter can be clamped conveniently. The driving part and the clamping part are driven by the sliding plate to move up and down along the sliding rail, the anchor changing cutter is meshed with the plastic sleeve, and after the clamping part and the top of the anchor changing cutter are clamped, the driving part drives the clamping part to rotate, and the clamping part drives the anchor changing cutter and the plastic sleeve to rotate synchronously, so that the anchor changing cutter and the plastic sleeve are screwed out of the placing cavity. The dismantling efficiency of the plastic sleeve is improved, and the labor cost is reduced.
Owner:CHINA RAILWAY FIRST GROUP CO LTD +2

A temporary support removal method for existing concrete components

The present invention discloses a temporary support removal method for existing concrete components, which belongs to the technical field of building removal, and includes the following steps: marking according to preset segmentation positions, dividing the existing concrete components into multiple concrete segments from bottom to top for easy cutting operation; cutting the first end face slit of the first concrete segment starting from the lower end; installing two annular limiting devices at intervals on the concrete component; installing a first jack between the two annular limiting devices; cutting the second end face slit of the first concrete segment; lifting the first concrete segment from its original position; installing a second jack between the two cut end faces, and disassembling the two annular limiting devices; repeating the above steps to complete the removal of all concrete segments. The removal method disclosed by the present invention can effectively support and remove existing concrete components, thereby improving the removal efficiency of buildings.
Owner:SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD

Construction method for dismantling upper structure of steel box girder type pedestrian trestle

The embodiment of the invention discloses a demolition construction method and device for an upper structure of a steel box girder type pedestrian trestle, electronic equipment and a storage medium, and relates to the technical field of bridge engineering construction. Comprising the following steps of early-stage preparation, construction preparation, bridge accessory structure and decoration dismantling, steel box girder dismantling, pier column and bearing platform dismantling, waste treatment and resource recovery and later-stage inspection and acceptance. Through fine design, the steel box girder is divided into a plurality of modules to be disassembled one by one, and the technical means of oxygen acetylene gas cutting, mechanical crushing and the like are adopted, so that rapid and accurate construction is ensured. Meanwhile, environmental protection measures are taken, waste is treated in a classified mode, and resources are recycled. According to the scheme, the dismantling efficiency is improved, the construction cost is reduced, the influence on the surrounding environment is remarkably reduced, and it is ensured that the dismantling process is safe and controllable.
Owner:SHENZHEN MUNICIPAL ENG CORP

Bearing outer sleeve dismounting device and dismounting method

The invention relates to the technical field of bearing disassembly, in particular to a bearing outer sleeve disassembly device and method. The bearing outer sleeve disassembly device comprises a fixed frame placed on a bearing seat, two receding holes are formed in the top of the fixed frame, a circular tube cross beam is detachably placed in a bearing outer sleeve, and a plurality of steel balls are movably placed in the circular tube cross beam; the circular tube cross beam is in threaded connection with a pushing screw used for pushing the steel balls to the two sides, the two ends of the circular tube cross beam are connected with chains respectively, the two chains upwards penetrate through the corresponding receding holes, a movable cross beam is arranged above the fixed frame, the top ends of the chains are connected to the movable cross beam, and a jack is supported between the movable cross beam and the fixed frame. The device is easy in material obtaining, simple to manufacture and low in cost, the dismounting efficiency of the bearing outer sleeve is improved, the operation time is obviously shortened, and the construction technical difficulty is reduced.
Owner:CHINA MCC22 GROUP CORP LTD