The utility model discloses a
tower crane attachment device for a super high-rise building without dismounting a
hanging basket, which comprises a back plate, a panel, an attachment lug plate, a screw rod and a
screw cap, a bolt sleeve penetrating through a wall is pre-embedded during the construction of a main body structure, the panel and the back plate are connected with a building wall body through bolts, the attachment lug plate is welded on the panel, and the screw rod is welded on the back plate. The attaching lug plate is used for being connected with an attaching rod of a
tower crane, the nut is fixed to the panel, a penetrating hole is formed in the panel, and the screw penetrates through the nut and the penetrating hole and then is connected with a bolt sleeve in a wall. When the
tower crane is used for dismantling, the attachment device is synchronously dismantled, the nut and the back plate are dismantled in the floor, and the attachment rod of the
tower crane and the attachment device are hoisted to the ground together by the
tower crane and then dismantled, so that by means of the
tower crane attachment device, the dismantling work can be completed in the floor, the dismantling efficiency is improved, and the high-altitude operation risk existing in the dismantling work is reduced; meanwhile, when the tower crane attachment device is dismantled, a
hanging basket does not need to be additionally erected to serve as a dismantling operation tool, and the cost for leasing and installing the
hanging basket is saved.