A kind of 7 type shield support under horizontal non-blasting mining method, belong to the technical field of ore body mining, it includes the following steps, S1, in the
vein along the upper section in the tunnel, install 7 type shield support, 7 type shield support is from east side along the
vein up mountain, start through
joist series connection arrangement to west side along the
vein up mountain;S2, after installation and arrangement are completed, from the middle position of along the vein to both ends, using rock
drill to carry out retreating type slope rock drilling, according to the angle of 15 ° to both sides mining, mining to vertical height drops 1m, then, horizontal retreating type rock drilling 1m, during,
shovel truck follows and carries out in and out
slag operation, transports ore to ramp, then, through ore chute connecting channel, transports to ore chute, unloads to ore chute, until rock drilling to end only remaining body length about 4m, will rock
drill in stope connecting channel, turns around, will end remaining 4m advancing type rock drilling.The present application simplifies the
recovery process, can effectively improve the production efficiency of ore block, and lower the cost of
ton ore.