176 results about "Drilling and blasting" patented technology

Drilling and blasting is the controlled use of explosives and other methods such as gas pressure blasting pyrotechnics, to break rock for excavation. It is practiced most often in mining, quarrying and civil engineering such as dam, tunnel or road construction. The result of rock blasting is often known as a rock cut.

High-energy geological environment surrounding rock classification and decision-making method based on digital twinning and multi-source feedback

The invention belongs to the technical field of tunnel and underground engineering intelligent construction and geotechnical engineering informatization, and discloses a high-energy geological environment surrounding rock classification and decision-making method based on digital twinning and multi-source feedback. The problems caused by difficulty in realizing surrounding rock state dynamic sensing, multi-source data fusion classification and construction decision closed-loop linkage in the prior art in a high-energy geological environment are solved. The method comprises the following steps: firstly, constructing a tunnel three-dimensional geology-structure digital twinborn body based on initial survey data; in the construction process, multi-source data such as geology, construction disturbance and surrounding rock response are collected in real time through the Internet of Things technology and mapped to the digital twinborn body, and virtual-real synchronous updating is achieved. And then, constructing a deep learning-parameter inversion hybrid model on the basis of the multi-source fusion data, outputting a dynamic surrounding rock classification index DRCI and key mechanical parameters, inputting the DRCI and the key mechanical parameters into a multi-objective optimization module, and giving a self-adaptive drilling and blasting scheme. And finally, reversely correcting the model through a construction feedback result to realize closed-loop self-learning.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Optimized construction method for horizontal circumferential drilling and blasting parameter model of spherical crown dome

The invention discloses a spherical crown dome horizontal circumference drilling and blasting parameter model optimization construction method, and the method comprises the steps: collecting geological, crustal stress, hydrological and structural plane data, building a three-dimensional geological information model, carrying out the working condition partitioning based on a surrounding rock quality evaluation index, and constructing a parameter probability distribution model and an uncertainty boundary of each partition. Therefore, precise space description and parameter variability quantification of the spherical crown dome construction area are realized. The method comprises the following steps: establishing a three-dimensional numerical model of a cavern group, integrating blasting power, seepage and stress multi-physical field effects by adopting a finite element-discrete element coupling method, introducing a surrounding rock deterioration constitutive model considering cumulative damage and unloading aging, calibrating key parameters through an indoor test and field trial explosion, and establishing a three-dimensional model of the cavern group. And the numerical model can truly reflect the mechanical property degradation track of the surrounding rock under repeated blasting disturbance.
Owner:POWER CHINA KUNMING ENG CORP LTD +2

Tunnel drilling and blasting slag removal vehicle autonomous path planning method and device based on Navigation 2 behavior tree scheduling framework

The invention provides a tunnel drilling and blasting slag removal vehicle autonomous path planning method and device based on a Naligation 2 behavior tree scheduling framework, and the method comprises the following steps: S1, carrying out the data collection and map construction of a tunnel scene after drilling and blasting; s2, identifying a blasting residue area and generating a target point; s3, constructing a behavior tree scheduling structure and planning a path; and S4, performing path search, execution and feedback evaluation based on a path planning algorithm. According to the method, multi-source sensor mapping and deep learning semantic segmentation technologies are combined, high-precision recognition and traffic area extraction of residual obstacles in an unstructured tunnel environment after drilling and blasting are performed are performed, complex scenes faced by slag removal path planning are fully considered, a behavior tree scheduling mechanism is adopted to fuse path planning, target scheduling and an anomaly recovery strategy, and the path planning efficiency is improved. And a path execution system of real-time response and fault-tolerant capability is further constructed, and the operation continuity and robustness of the robot in a complex operation environment are improved.
Owner:FUZHOU UNIV

Tunnel accurate drilling and blasting design method integrating multi-source intelligence and closed-loop optimization

The invention discloses a tunnel precise drilling and blasting design method integrating multi-source intelligence and closed-loop optimization. The method comprises the steps that geological parameters are collected through geological detection equipment; based on fracture mechanics and rock mass damage theories, constructing a quantitative relation model reflecting joint network distribution, stress wave propagation characteristics and a rock mass crushing effect coupling mechanism; inputting the geological parameters into a pre-constructed multi-dimensional knowledge base, integrating historical engineering data association rules by the multi-dimensional knowledge base by using a graph database, and extracting geological features; based on a deep learning model, analyzing the mapping relation between the geological features and the blasting parameters, and generating a preliminary blasting scheme including the blast hole distance, the charging structure and the detonating mode; according to the method, a closed-loop optimization system of geologic features-blasting parameters-effect evaluation is constructed, so that dynamic intelligent decision-making and construction self-adaptive regulation and control of tunnel drilling and blasting design are realized, and the contour forming precision and the blasting efficiency are remarkably improved.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2

Downward parallel medium-length hole sublevel filling mining method for low-grade broken ore body

The invention provides a downward parallel medium-length hole sublevel filling mining method for a low-grade broken ore body, belongs to the technical field of mining, and solves the problems that a traditional mining method is low in mining efficiency and high in cost under complex geological conditions. Downward parallel medium-length holes are adopted in each section for drilling and blasting, efficient stoping is achieved in cooperation with remote control ore removal and supporting equipment, an interbed filling technology is adopted in a goaf to be combined with a reinforcing mesh structure to form an artificial roof, stress and displacement changes of a filling body are monitored in real time through a ground pressure monitoring system, and the stoping sequence and supporting parameters are optimized. According to the method, the efficiency and safety problems of a traditional mining method in low-grade and broken ore deposit and three-under resource mining are solved, large-scale, low-cost, safe and efficient mining is achieved, and the method is suitable for ore body mining under complex geological conditions.
Owner:JINCHUAN GROUP CO LTD +1

Multifunctional all-in-one unit for drilling and blasting method construction and construction technology

The invention discloses a multifunctional all-in-one unit for drilling and blasting method construction and a construction technology, and relates to the technical field of tunnel construction, the multifunctional all-in-one unit comprises a rack assembly, a left drilling arch arm frame, a left drilling arm frame, a vertical arch arm frame, a right drilling arm frame, a right drilling arch arm frame, a guniting arm frame, a pumping system, a hydraulic system and an electrical system; a vertical arch module of the left drilling arch arm frame, a vertical arch module of the vertical arch arm frame and a vertical arch of the right drilling arch arm frame snatch a left arch frame, a middle arch frame and a right arch frame to carry out arch erecting and mesh welding operation; a charging hanging basket is arranged at the front end of the rack assembly; the rock drilling modules of the left drilling arch arm frame and the right drilling arch arm frame work independently or cooperatively in cooperation with the left drilling arm frame and the right drilling arm frame and are used for drilling anchor rod holes and blast holes. According to the invention, multiple functions such as drilling of blast holes, charging of a hanging basket, blasting, erecting of meshes, anchor rod operation, guniting and the like can be integrated, parallel working procedures or seamless connection of the working procedures can be realized, and the construction progress can be greatly improved.
Owner:SICHUAN LANHAI ENG EQUIP MFG CO LTD

Tunnel mechanical fault shutdown influence prediction method and system based on CART decision tree

The invention provides a tunnel mechanical fault shutdown influence prediction method and system based on a CART decision tree, and belongs to the technical field of tunnel engineering. The method comprises the steps that equipment operation data and construction environment parameters in drilling and blasting method tunnel construction are collected, and a multi-dimensional feature set is constructed; performing preprocessing and feature screening on the data in the multi-dimensional feature set, and establishing a fault-shutdown associated feature matrix; based on a CART decision tree algorithm, constructing a fault shutdown influence prediction model by using the fault-shutdown association feature matrix; inputting equipment state data collected in real time and construction parameters into the prediction model, and dynamically outputting a prediction result through decision tree rule matching; and adaptively adjusting and optimizing the parameters of the prediction model according to the dynamic change of the construction stage. According to the method, multi-dimensional, high-precision and interpretable prediction on the mechanical fault shutdown influence can be realized, and intelligent support is provided for construction decision making.
Owner:SHANDONG UNIV (QIHE) INST OF NEW MATERIALS & INTELLIGENT EQUIP +1

Method for automatically designing section contour and blast hole position of tunnel through drilling and blasting method

The invention provides a drilling and blasting method tunnel section contour and blast hole position automatic design method, and relates to the technical field of tunnel engineering, and the method comprises the following steps: S1, determining the type of a tunnel section contour; s2, performing parameterized representation and automatically drawing a contour line based on the tunnel section contour type; s3, based on the drawn tunnel section contour, conducting parameterized arrangement of cut holes, peripheral holes, bottom plate holes and auxiliary holes, and generating coordinates of various blast holes; automatically designing blast hole positions through different types of tunnel section contours; and the arrangement of the blast holes is converted into the generation of coordinate points, so that the requirements of intelligent mechanical equipment for tunnel excavation in the drilling and blasting method on the coordinates of the blast holes are met, and finally, the intelligent and refined blast hole arrangement of a tunnel excavation site in the drilling and blasting method is realized. The problems that in the contour drawing and blast hole arrangement link, manual lofting is often low in efficiency and large in error are solved, and it is avoided that the excavation section deviates from the design, the over-excavation or under-excavation phenomenon occurs, and the construction quality is affected.
Owner:SHENYANG UNIVERSITY OF TECHNOLOGY

TBM (Tunnel Boring Machine) water conveying tunnel lining steel pipe mounting and transporting equipment and transporting and mounting method and device

The invention relates to TBM water conveyance tunnel lining steel pipe installation and transportation equipment and a transportation and installation method, the TBM water conveyance tunnel lining steel pipe installation and transportation equipment comprises a rail transportation system, a transfer system, a wheel type transportation system, an installation butt joint device and temporary supporting profile steel, the rail transportation system is arranged on a drilling and blasting tunnel section, and the transfer system is arranged at the junction of the drilling and blasting tunnel section and a segment tunnel section; the wheel type transportation system is arranged on a pipeline, and the installation butt joint device is arranged at the end of a lined section. The rail transportation system and the transfer system share the same group of rails at the intersection; the installation and construction of the lining steel pipe of the TBM water delivery tunnel with the engineering quantity smaller than 1 kilometer can be facilitated, the construction efficiency is improved, and the cost is reduced.
Owner:SINOHYDRO BUREAU 14 CO LTD

Drilling and blasting method tunnel machine group cooperation large machine intelligent scheduling system

The invention relates to the technical field of tunnel construction automation, and discloses a drilling and blasting method tunnel machine group cooperation large machine intelligent scheduling system comprising the following steps: an Internet of Things sensing unit used for obtaining an equipment individual state; the macroscopic scene visual perception subsystem is used for identifying a macroscopic scene event; the state data management module is used for calculating a dynamic influence factor which can be attenuated along with time and can be adjusted for the state and the event; the decision potential field construction module is used for generating a space decision potential field model containing attraction potential and repulsion potential according to the dynamic influence factors; and the scheduling instruction generation module is used for planning a path based on the potential field model and generating an instruction. According to the method, the unified decision potential field adjusted by the dynamic influence factors is constructed, the scheduling problem is converted into the path planning problem, and unified and efficient scheduling of conventional processes and emergencies is achieved.
Owner:ZHONG GUO JIAN ZHU TU MU JIAN SHE YOU XIAN GONG SI +1

Tunnel hole slag image intelligent identification method and system based on multi-task deep learning

The invention discloses a tunnel hole slag image intelligent identification method and system based on multi-task deep learning, and relates to the technical field of crossing of hydraulic engineering and artificial intelligence, and the method comprises the steps: obtaining a hole slag image and shared data, constructing an original data set, preprocessing the original data set by using a dynamic adaptive data enhancement strategy and a focus loss function to obtain an enhanced data set; constructing a multi-level classification deep learning model of a multi-branch output structure, respectively outputting probability distribution results of different classifications, and setting a loss function and a loss weight of the multi-level classification deep learning model; and performing optimization training on the multi-stage deep learning model, inputting an enhanced data set generated in real time into the multi-stage classification deep learning model after optimization training, and outputting drilling and blasting parameter recommendation based on a lithology identification result. According to the method, the hierarchical classification model with multi-branch output is constructed, and construction method identification and specific lithology classification can be realized at the same time.
Owner:GUANGXI ZHUANG AUTONOMOUS REGION WATER CONSERVANCY & ELECTRIC POWER SURVEY DESIGN & RES INST CO LTD +1

Deep-buried hard rock tunnel micro-seismic monitoring and segmented advanced blasting collaborative pressure relief method

The invention relates to the technical field of tunnel and underground engineering safety construction, in particular to a deeply-buried hard rock tunnel micro-seismic monitoring and segmented advanced blasting collaborative pressure relief method which comprises the steps that a pre-constructed micro-seismic monitoring system is arranged along the tunnel wall so as to collect and analyze seismic source parameters of a micro-seismic event; whether a preset early warning threshold value is exceeded is judged according to the judgment result; if yes, segmented advanced blasting pressure relief design is carried out based on the seismic source parameters of the micro-seismic event, so that blasting parameters are obtained; according to the blasting parameters, drilling wall protection and charging blasting are conducted on the tunnel hole wall, so that the blasted tunnel hole wall is obtained; the current surrounding rock response of the tunnel wall after blasting is observed, whether the current surrounding rock response exceeds a preset early warning threshold value or not is judged, if yes, it is judged that pressure relief is effective and tunneling is normal, and if not, blasting parameters are adjusted or pressure relief is supplemented in the next cycle. Therefore, the problems of passive rock burst risk early warning, poor pressure relief effect, extensive parameter control and the like under the high ground stress condition in drilling and blasting method construction of the deeply-buried hard rock tunnel are solved.
Owner:WUHAN UNIV +1

Drill boom mechanism, drilling and blasting assembly and drilling and blasting trolley

The drill boom mechanism comprises a first shell, a first linear driving piece, a first rotary driving piece, a main drill rod and a monitoring piece, a first through hole is formed in the front end of the first shell, and a first sliding seat is arranged in the first shell in a sliding mode in the front-back direction; the first rotary driving part is installed on the first sliding seat, the first linear driving part is installed on the first shell and is in transmission connection with the first sliding seat, the main drill rod penetrates through the first penetrating hole, the tail end of the main drill rod is connected with the driving end of the first rotary driving part, and the monitoring part is arranged at the front end of the first shell. The first linear driving part drives the first sliding seat to drive the first rotary driving part and the main drill rod to move in the front-back direction, the first rotary driving part is used for driving the main drill rod to rotate, and the monitoring part is used for monitoring the run-out amount of the main drill rod in the radial direction when the main drill rod rotates. Therefore, the runout value of the main drill rod in the radial direction can be monitored in real time through the monitoring piece so as to judge whether the main drill rod has the risk of fracture or not.
Owner:CHINA RAILWAY 11TH BUREAU GRP CORP LTD +1

Ultrahigh-pressure aerodynamic pulse fracturing-while-drilling device and method

The invention relates to the technical field of rock-soil drilling and blasting engineering, and discloses an ultrahigh-pressure aerodynamic pulse fracturing-while-drilling device and method.The ultrahigh-pressure aerodynamic pulse fracturing-while-drilling device comprises an aerodynamic pulse generating device used for guiding gas to a high-low pressure gas channel switching inner core; the high-low pressure gas channel switching inner core is located at one end of the aerodynamic pulse generating device, an internal rotation pneumatic rotating impeller is arranged at the end, away from the aerodynamic pulse generating device, of the high-low pressure gas channel switching inner core and used for driving the down-the-hole pneumatic impact hammer device to operate, and the down-the-hole pneumatic impact hammer device is used for impacting and extruding rocks; the conversion joint is used for realizing connection between the internal rotation pneumatic rotating impeller and the down-the-hole pneumatic impact hammer device; the pneumatic pulse pressure relief adjusting sliding sleeve is used for switching gas flow channels with different pressures. The invention provides a coaxially integrated drilling and blasting integrated composite device which is compact in structure, reliable in action and acceptable in cost, so that the tunneling circulation time is shortened, and the operation risk is reduced.
Owner:HOHAI UNIV

Drilling and blasting method tunnel construction quality evaluation method and system

The invention provides a drilling and blasting method tunnel construction quality evaluation method and system, and relates to the technical field of tunnel construction quality evaluation. According to the method, drilling, charging, blasting vibration and tunnel contour data are collected in real time and transmitted to a server. The server maintains a dynamically updated tunnel contour reference, calculates a contour quality vector through spatial transformation, and integrates construction parameters and geological data to construct a construction state vector. Based on a construction response field constructed by historical data, the system deduces an expected vibration speed and contour quality as a prediction reference. And through difference analysis of actual data and a predicted value, the system generates a current state conflict vector, and inquires a decision mapping table to output a construction parameter adjustment instruction. And the equipment control system executes parameter cooperative adjustment and feeds back new data to the server to form closed-loop control of evaluation and optimization, so that real-time, accurate and adaptive control of the construction quality is realized.
Owner:THE NO 6 ENG CO LTD OF CHINA RAILWAY 20TH BUREAU GRP +1

A method for purifying a source of dust in a tunneling process

PendingCN122441178A
A method for purifying smoke source in tunnel excavation process relates to the field of tunnel engineering air purification, comprising a device box, a negative pressure return air inlet, a pressure fan, a static pressure box, a smoke treatment device, a harmful gas purification device and a high-pressure air curtain system are fixed in the device box, the high-pressure clean air jet formed by the air outlet is sprayed to the drilling and blasting operation face, the high-concentration smoke-carrying air area is targeted, quickly diluted and strongly disturbed, the smoke-carrying air is passively returned to the negative pressure return air inlet grid area on both sides of the device box, the smoke particles are intercepted and purified by the smoke treatment device, the harmful gas is purified by the harmful gas treatment device, and the purified air is pressurized and sprayed by the pressure fan to complete the circulation of the smoke-carrying air on the face; the airflow organization formed by the method has good disturbance effect on the air retention on the face, has good smoke and dust removal effect in a large space or range, and is also suitable for relatively closed space.
Owner:CHINESE PEOPLES LIBERATION ARMY UNIT 96608

Construction method for long inclined shaft of pumped storage power station

The invention relates to a construction method for a long inclined shaft of a pumped storage power station. The method is suitable for the technical field of pumped storage power station construction. According to the technical scheme, the construction method for the long inclined shaft of the pumped storage power station comprises the steps that a small-diameter TBM is adopted to conduct excavation from bottom to top along the axis of the long inclined shaft to be excavated, and a pilot tunnel arranged along the axis of the long inclined shaft is formed; and after excavation of the pilot tunnel is completed, the inclined shaft reaming TBM is adopted for excavation from top to bottom along the axis of the long inclined shaft to be excavated, and the long inclined shaft is formed. In order to solve the problems that the water diversion inclined shaft of the pumped storage power station is long in construction length, large in gradient, small in construction working face, long in construction period, various in working procedure, changeable and complex in geological condition and the like, the method that a pilot tunnel is excavated through a small-diameter TBM firstly, and then one-time forming is achieved through inclined shaft reaming TBM expanding excavation is adopted; the method solves the potential safety hazard that the geological condition in front cannot be detected in manual drilling and blasting in the inclined shaft construction process and in the inclined shaft TBM construction process, the hole forming quality is improved, disturbance to surrounding rock is reduced, and the construction safety of personnel is guaranteed.
Owner:POWERCHINA HUADONG ENG CORP LTD +2

Tunnel anchor drilling method, medium and equipment based on three-dimensional point cloud

PendingCN122328090AShotcretePoint cloud
This invention relates to the field of tunnel drilling and blasting technology, and particularly discloses a method, medium, and equipment for tunnel anchor drilling based on three-dimensional point clouds. The tunnel anchor drilling method includes: scanning the surface of the initial shotcrete in the tunnel working section using lidar to obtain a three-dimensional point cloud model of the initial shotcrete surface; extracting the two-dimensional point cloud contour of the circumferential anchor cross-section based on the three-dimensional point cloud model of the initial shotcrete surface to obtain a two-dimensional physical contour model of the initial shotcrete surface; constructing the parametric equation of the anchor axis according to the designed anchor parameters, and solving it simultaneously with the two-dimensional physical contour model of the initial shotcrete surface to obtain the axis distance parameter and the actual drilling coordinates; and using a drilling-anchor-injection integrated trolley to perform drilling operations at a designed angle based on the axis distance parameter and the actual drilling coordinates. This invention directly solves for the actual drilling coordinates of the anchor based on the point cloud cross-section, overcoming the interference of unevenness of the initial shotcrete surface on anchor positioning and improving the accuracy of anchor placement.
Owner:CENT SOUTH UNIV +1

Drilling and blasting integrated machine group bench

ActiveCN310008552SMining engineeringMachine
1. The name of the design product: the gantry of the drilling and blasting integrated machine set. 2. The use of the design product: as the installation carrier of the working arm and electro-hydraulic system of the drilling and blasting integrated machine set. 3. The design points of the design product: in shape. 4. The picture or photo that best shows the design points: perspective view 1. 5. Other circumstances that need to be explained: the bottom view is not common in use, so the bottom view is omitted.
Owner:SICHUAN LANHAI ENG EQUIP MFG CO LTD

Unsupervised learning method for feature extraction of tunnel point cloud and overbreakage detection in drill and blast method

The present application belongs to the technical field of tunnel engineering digitized construction, and particularly relates to a method for extracting point cloud features and detecting overbreak and underbreak of a tunnel by drilling and blasting method without supervised learning. Firstly, three-dimensional laser scanning is used to obtain initial point cloud data of tunnel excavation, and point cloud thinning and registration are used for pretreatment. Then, a convex hull algorithm is used to calculate the actual excavation axis, and an excavation section with a thickness of 0.1m is intercepted at a fixed interval of 10m. The K-means clustering algorithm is used for noise reduction processing of the point cloud slices, and the convex hull vertices are screened to accurately extract the actual excavation contour line. Finally, the overbreak and underbreak of each convex hull is calculated to realize real-time quantitative analysis of the overbreak and underbreak of the tunnel. By fusing three-dimensional laser scanning, unsupervised learning and the convex hull algorithm, the present application realizes the leap of overbreak and underbreak detection of a tunnel from "discrete, lagging and manual" to "continuous, real-time and intelligent", and provides efficient, accurate and reliable digital technical support for the drilling and blasting method tunnel construction.
Owner:NO 3 ENG COMPANY LTD OF CCCC FIRST HARBOR ENG COMPANY +1

A tunnel construction method

This invention relates to the field of tunnel engineering, specifically to a tunnel construction method, comprising the following steps: simultaneously excavating at both ends of the tunnel using both TBM (Tunnel Boring Machine) and drill-and-blast methods to form a TBM tunnel section and a drill-and-blast tunnel section; excavating the TBM tunnel section and the drill-and-blast tunnel section to both ends of the through tunnel section; firstly constructing a dismantling chamber using the drill-and-blast method, and then constructing a TBM through section to the dismantling chamber using the TBM method; dismantling the TBM tunneling machine in the dismantling chamber and transporting it out of the tunnel, thus completing the tunnel construction. This invention, through this simultaneous construction method at both ends, can effectively improve the overall excavation efficiency of extra-long tunnels, thereby significantly shortening the construction period of extra-long tunnels.
Owner:CHINA RAILWAY NO 2 ENG GROUP CO LTD +1

Drilling and blasting method tunnel construction scheme simulation method and system based on digital twinning

The application relates to the technical field of tunnel drilling and blasting construction, in particular to a drilling and blasting method tunnel construction scheme simulation method and system based on digital twinning, which comprises the following steps: collecting geological and rock mass data, historical blasting data, site equipment data, site personnel data, real-time environment and working condition data; constructing a digital twinning model of a tunnel to be blasted, and updating the digital twinning model; designing an original drilling and blasting plan based on historical experience and mechanism analysis, and obtaining an optimal drilling and blasting construction scheme by using the digital twinning model and a hierarchical collaborative strategy; performing a field drilling and blasting experiment by using the optimal drilling and blasting construction scheme, and obtaining real blasting data to optimize the digital twinning model. The application realizes auditing and screening of a blasting construction scheme by constructing a high-fidelity tunnel digital twinning model and using a hierarchical collaborative strategy, and unifies efficiency and precision while obtaining the optimal drilling and blasting construction scheme.
Owner:EAST CHINA JIAOTONG UNIVERSITY +1

Open-air drilling blasting orifice waterproof device

The utility model belongs to the technical field of drilling and blasting hole water prevention, and particularly relates to an open-air drilling and blasting hole opening water inflow prevention device which comprises a column body, a limiting plate is fixedly connected to the top of the column body, an air bin is formed in the column body, an elastic air bag is fixedly connected to the outer wall of the column body, and an adjusting mechanism is arranged in the column body. And a fixing assembly is arranged below the limiting plate. According to the water inflow prevention device for the open-air drilling blasting orifice, by using an adjusting mechanism and a fixing assembly, a worker can drive a round rod to ascend by rotating a screw rod, then a transverse plate is driven to ascend, under the action of a guide rod, a hinge rod can drive a sleeve rod and an inner rod to move, and a drill bit can be inserted into the inner wall of the orifice; meanwhile, after air in the air bin enters the elastic air bag, the elastic air bag expands and is limited by the limiting plate, then the elastic air bag is tightly attached to the outer wall of the hole opening, water proofing of the hole opening is achieved, and operation is convenient.
Owner:GEZHOUBA YIPULI XINJIANG BLASTING ENG CO LTD

Horizontal short-hole shrinkage method suitable for residual phosphate ore mining

The application discloses a horizontal shallow hole and ore remaining room pillar method suitable for phosphorite residual ore mining, which comprises the following steps: firstly, designing middle section and stope structure parameters, determining the position of the ore pillar, then performing preparation and cutting engineering, and finally, in the process of the last mining, after rock drilling and blasting, ventilation and ore leveling, a working face for subsequent mining is formed, then in the subsequent mining, with the increase of the stripped ore and the expansion of the mined-out area, three continuous working zones of mining, ore transportation and dry filling are formed between two ore pillar mining areas, and the mining is repeatedly performed. In order to cope with the complex engineering environment of the phosphorite, for the area with poor operation conditions, a door-shaped arch pillar is used between the ore pillars to improve the stability of the mined-out area. The application can improve the residual ore mining efficiency of the lower layer existing mined-out area, is safe and reliable in mining operation, low in production cost, small in engineering quantity, high in adaptability to engineering environment, and can fully utilize the ore pillar condition of the mined-out area to meet the supporting requirement.
Owner:WUHAN UNIV OF TECH +1

Bending auxiliary adjustment system and method for drill rods of a jumbo in a super-large diameter tunnel

The application discloses a kind of bending auxiliary adjustment systems of rock drilling jumbo drill rod of super diameter tunnel and application method thereof, the system includes: drill rod unit, attitude sensor unit, data acquisition and processing unit and main control and display unit.Floating casing structure is made of fixed guide section, flexible joint and floating casing, to ensure that drill rod can drive sensor to move freely even if it is deflected during advancing.The attitude sensor unit integrates gyroscope, accelerometer and magnetometer, enabling high-frequency real-time collection of drill rod pitch angle, yaw angle and other attitude information.The data acquisition and processing unit outputs stable results through sensor fusion and attitude calculation, and the main control and display unit generates and visually displays the correction suggestions in combination with the target drilling direction.The application effectively assists operators in correcting drill rod bending through real-time attitude monitoring and adjustment suggestion output, significantly improving the precision and efficiency of super diameter tunnel drilling and blasting construction.
Owner:TAIYUAN UNIVERSITY OF TECHNOLOGY +1

Integrated lining prefabrication and assembly comprehensive construction method for tunnel bottom kilometer detection and drilling and blasting equipment of small-section tunnel of plateau railway

The invention relates to a plateau railway small-section tunnel bottom kilometer detection and drilling and blasting equipment integrated lining prefabrication and assembly comprehensive construction method. The method comprises tunnel bottom advanced kilometer detection operation, drilling and blasting supporting multifunctional integrated operation, secondary lining prefabrication and assembly operation and deeply-buried ditch pipe joint pushing type operation. According to the method, kilometer-level advanced geological forecast and pressure relief drainage, small-section drilling and blasting equipment integrated construction, full-ring prefabricated lining assembly construction and deeply-buried ditch pushing arrangement are sequentially achieved, and whole-process integrated construction is formed.
Owner:CHINA COMMUNICATIONS CONSTRUCTION

Composite stratum multi-cutter head rectangular pipe jacking blind area processing structure and method

ActiveCN115898424BRealize full-section constructionGood explosion-proofOther gas emission reduction technologiesBlasting cartridgesStructural engineeringPipe
The application discloses a composite stratum multi-cutter disc rectangular pipe jacking blind area processing structure and method, comprising a drilling and blasting integrated processing structure, defining the advancing direction of the pipe jacking machine as the front, the drilling and blasting integrated processing structure comprising a drilling module and a blasting module connected in sequence from front to back, the blasting module rear end being connected with a drilling machine through an adapter pipe; a channel is arranged in the soil chamber corresponding to the cutter disc blind area of the multi-cutter disc rectangular pipe jacking machine, the drilling and blasting integrated processing structure being arranged in the channel, and a valve being arranged on the side of the channel close to the cutter disc. The drilling and blasting integrated processing structure can drill and excavate the hard rock in the blind area of the pipe jacking machine and perform blasting to form dense cracks in the blind area, break the originally hard rock, and thus realize full-face construction of the pipe jacking machine in the composite stratum.
Owner:SOUTHWEST JIAOTONG UNIV

A method and system for fine prediction of rock burst grade in drill-and-blast tunnel construction stage

The present application relates to the field of tunnel engineering, and specifically discloses a method and system for fine prediction of rock burst grade in tunnel construction stage by drill and blast method, comprising the following steps: constructing a basic sample library; establishing a mapping relationship between drilling parameters and first principal stress, second principal stress, third principal stress, elastic modulus and Poisson's ratio and other surrounding rock mechanical parameters based on energy method; constructing an extended sample library based on the mapping relationship and the basic sample library; constructing an intelligent rock burst grade prediction model based on deep learning, and bringing the extended sample library into the intelligent rock burst grade prediction model for training; and fine prediction of rock burst grade in front of the tunnel face according to the constructed intelligent rock burst grade prediction model. The present application can effectively reduce the input of construction personnel and prevent the impact of rock burst on the safety of construction personnel, and guide the intelligent construction of tunnels.
Owner:SOUTHWEST JIAOTONG UNIV

Drill arch arm module of integrated drill-blast unit

1. Name of the product in this design: Drilling arch arm module of integrated drilling and blasting unit. 2. Application of this design: for drilling and frame erection in tunnels and underground engineering. 3. The key design feature of this product is its shape. 4. The image or photograph that best illustrates the design's key points: 3D view 1.
Owner:SICHUAN LANHAI ENG EQUIP MFG CO LTD