The invention discloses a medium thick heavy-
pitch crushed ore 
body frame type artificial top downward segmenting cemented filling method which comprises the following steps: dividing chamber jambs along the trend of an ore body; adopting a rail-less mining aligning 
system; pre-constructing a high-strength 
reinforced concrete artificial top in a segmented drilling lane; adopting a 
stoping sequence from up to down; performing 
drilling and blasting ore removal on the ore body through the segmented drilling lane at bottom; adopting medium-length hole drilling and remotely controlling a scraper to 
discharge ore; after finishing the mining of the chamber, utilizing concrete 
tailings to perform cemented filling; after finishing the mining of the jambs, utilizing concrete 
tailings or pure 
tailings to perform cemented filling; after completely 
stoping the mine chamber in the frame under the protection of the concrete artificial top, starting to stope the 
jamb adjacent to the segment, and meanwhile 
stoping the corresponding mine chamber in the frame of the next segment, and then stoping the corresponding 
jamb of the next segment; and after completely mining the chamber 
jamb in the 
middle segment, immediately turning towards the lower 
middle segment for stoping. The method provided by the invention has the advantages that the safety for mining the heavy-
pitch medium thick crushed or ultra-crushed ore body is high, the 
resource depletion loss rate is low, the mechanical degree is high, the production capacity is high, and the like.