Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2085 results about "Time segment" patented technology

Energy management system data filling method and architecture based on time sequence analysis

The invention discloses an energy management system data filling method and architecture based on time sequence analysis, and the method achieves the intelligent prediction and filling of a data missing segment in an energy management system through constructing a filling model based on a naive Bayes algorithm, and improves the data integrity and continuity. The system firstly dynamically manages historical data and new data through a sliding window mechanism to ensure that the model can fully consider the change trend of time sequence data in the filling process. The filling model combines the distribution characteristics of historical data and current data during initialization, and endows the data in different time periods with weights, so that the model can adapt to the equipment state and environment change. And after the data missing segment is detected, the system immediately calls the filling model to carry out prediction filling, replaces the original missing data with the result and writes the result into the database, so that the accuracy of subsequent analysis and anomaly detection is ensured.
Owner:ZHIYUAN XINNENG (BAODING) ELECTRIC TECHNOLOGY CO LTD

Time to digital conversion

A circuit for time to digital conversion, the circuit comprises a time to digital converter, TDC, configured to receive trigger signals and event signals and, for each event signal, provide a time stamp indicative of a time period between the event signal and an associated trigger signal, a first memory unit for storing a set of time stamps associated with one trigger signal and provided by the TDC, and a processing unit configured to compare the set of time stamps stored in the first memory unit to new time stamps provided by the TDC to determine coincident time stamps.
Owner:AUSTRIAMICROSYSTEMS AG

Node and methods performed thereby for handling drift in data

A method performed by a node for handling drift in data. The node obtains a dataset including a plurality of datapoints corresponding to a plurality of values of one or more dependent variables for a plurality of first features over a time period. The node determines, using machine learning and explainability, in the absence of determining whether or not the plurality of datapoints has a drift, whether or not there has been a change in respective one or more characteristics of a subset of the plurality of first features having a largest contribution to a variability of the datapoints in the plurality of datapoints based on a threshold from a first time period to a second time period. The node then initiates application of a drift policy on the plurality of datapoints based on a result of the determination.
Owner:TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)

Skip learning for multivariate anomaly detection on streaming data

Systems and methods are described for detecting anomalies within time series data using one or more online machine learning models. In one example, time series data may be obtained that spans a moving time period of a set length, to be used as training data. A machine learning model may be trained using the training data to identify anomalies in the time series data by upon detecting an estimation of an anomalous value in the time series data, pausing input of additional values of the training data into the machine learning model, and resuming input of the additional values of the training data into the machine learning model based on detecting at least one non-anomalous value. The trained machine learning model may then be used to detect a first anomaly in additional time series data by comparing the at least one additional value to the trained machine learning model.
Owner:AMAZON TECH INC

Abnormal management device, abnormal management method, and abnormal management system

It aims to appropriately manage the bias of the signal processing amount. 【Solution means】 The abnormality management device 1 uses, as teacher data, normal data indicating the number of normal packets distributed to each device for each time zone, and learns, by maximum likelihood estimation, the parameters of a probability model that outputs the posterior probability that the number of packets distributed to each device for each time zone is normal. A learning unit 11, the posterior probability for each device for each time zone estimated by the learned probability model, the probability distribution of the normal data for each device estimated based on the normal data, and the prior probability of being normal. A derivation unit 12 that derives the probability distribution of abnormal data indicating the number of abnormal packets distributed to each device in the time zone, and the probability distribution of the normal data and the probability distribution of the abnormal data for each device for each time zone are equal. And a setting unit 13 that sets, as a threshold value for abnormality determination of the number of packets distributed to each device, the number of packets corresponding to the value of the probability distribution that becomes the value.
Owner:INTERNET INITIATIVE JAPAN INC

Method and System for Fast Column Processing for Highly Irregular LDPC Codes

Decoding method and memory system which group bits in irregular LDPC codes having similar degrees of convergence into respective degree groups, classify the degree groups according to a metric indicative of a number of decoding iterations for convergence, divide a time period for convergence of the decoding iterations into different zones for the processing of selected degree groups within each zone, and skip decoding of the bits in a non-converging zone where the bits are not converging.
Owner:SK HYNIX INC

Analytics in view of dynamic beam configurations

Method comprising: receiving, for each of plural times, a respective first indication indicating that a first base station adopted a respective beam setting at the respective time; storing, in a database, for each of the plural times, the respective beam setting adopted, according to the respective first indication, by the first base station at the respective time along with the respective time; monitoring whether a request for the beam setting adopted by the first base station in a time period is received; retrieving, from the database, the one or more beam settings adopted, according to the database, by the first base station in the time period if the request is received; reporting the retrieved one or more beam settings adopted, according to the database, by the first base station in the time period in a response to the request.
Owner:NOKIA SOLUTIONS & NETWORKS OY

POI recommendation method based on multi-modal time information fusion

The invention provides a multi-modal time information fusion POI recommendation method, relates to the technical field of computer intelligence, and provides a multi-modal tense information fusion model MTFNR model for next POI recommendation, which fuses a long and short term preference model LSTHN and a time information model TIHN, time information modeling can obtain behavior modes of the user in different time periods, and behavior rules of the user can be better known; the interest change of the user can be dynamically captured through long-term and short-term preference modeling, and the timeliness of POI recommendation is improved; and finally, the MTFNR model adds the space-time interval information of the user on the basis of the GRU model, the dependency relationship of the sign-in sequence is effectively captured, and the recommendation system has better robustness, so that the overall performance of the model is improved. In addition, the MTFNR model can capture the interest change of the user in time, so that the recommended POI is more accurate.
Owner:SHENYANG LIGONG UNIV

Power amount adjustment system

To provide a power amount adjustment system capable of reducing power consumption according to requests to reduce the power consumption due to tight power supply and demand.SOLUTION: In a power amount adjustment system 100, when a server 4 acquires tight power supply and demand information requiring a reduction in power consumption in a specific time period, the server is configured to change and adjust a start time of defrosting operation when the specific time period overlaps with a time period during which pulldown is scheduled to be performed.SELECTED DRAWING: Figure 1
Owner:FUJI ELECTRIC CO LTD

Heat supply system load prediction method and system based on big data and medium

The invention provides a heat supply system load prediction method and system based on big data and a medium. The method comprises the steps of obtaining load operation data and corresponding influence factor data of a preset heat supply system in a preset time period, segmenting the load operation data and the corresponding influence factor data according to a time sequence, and obtaining load operation data and influence factor data corresponding to n time subsequences, performing weighting processing to obtain a load fluctuation index, extracting statistical characteristic data of the load operation data, performing processing to obtain a load form index, obtaining energy data in a preset time period, performing processing to obtain a load efficiency characteristic index, and performing processing in combination with the load fluctuation index and the load form index to obtain a load comprehensive evaluation index; the load comprehensive evaluation index is compared with a preset load comprehensive evaluation threshold value, heat supply system load prediction is conducted according to a comparison result, and therefore the heat supply system load prediction technology based on big data is achieved.
Owner:BEIJING HONGFENG ZHIKONG TECH CO LTD

Method for training a model able to predict a power consumption or production of at least one electric equipment

A method for training at least one model able to predict a power consumption or production of at least one electric equipment, also called target. The method includes: (a) obtaining time series data representing the evolution of the power consumption or production of the target over a first period of time, (b) comparing the target time series data to known time series data representing the evolution, over a second period of time, of the power consumption or production of known electric equipments, the second period of time being greater than the first period of time, to determine the k known time series data that are the most similar to the target time series data, (c) training of a first prediction model or backbone for each of the k known electric equipments, the backbone being able to predict the evolution over time of the consumption or the production of the corresponding known electric equipment, the backbone being trained on the corresponding time series data over the second period of time, and (d) training at least one second prediction model, called target model, by fine tuning at least one of the first trained prediction model on the time series data of the target over the first period of time.
Owner:SCHNEIDER ELECTRIC IND SAS

Power consumption distribution method and device, storage medium and program product

The invention discloses a power consumption distribution method and device, a storage medium and a program product, and relates to the technical field of servers, and the method comprises the steps: dividing a plurality of time slots, and in each time slot interval, according to the predicted load demand of each node and the task priority weight of a task executed by each node in the corresponding time slot, determining the task priority of each node; according to the method, the dynamic priority of each node is determined, and then the power consumption of each node is allocated based on the dynamic priority and the resource budget of each node in each time slot interval, so that the method can flexibly adapt to different load requirements and execution of tasks with different priorities in different time periods, and the tasks with high priorities can guarantee more resources; according to the method, resource waste is avoided, reliable decision support is provided for power consumption management of the server, system stability and task execution efficiency are effectively balanced, and double breakthrough of the data center in the aspects of energy conservation and performance optimization is promoted.
Owner:INSPUR SUZHOU INTELLIGENT TECH CO LTD

Subway information broadcast control method based on time period scheduling

The invention relates to the technical field of subway information broadcast control, and discloses a subway information broadcast control method based on time period scheduling. The method comprises the steps of collecting multi-source monitoring data of a subway operation environment in real time, wherein the multi-source monitoring data comprises passenger flow data, train arrival data and emergency event report data; dividing the current operation cycle into a plurality of continuous time slices based on a preset time period division rule, and generating a corresponding time period identification code for each time slice; matching a target broadcast control template from a broadcast control strategy library according to the time period identification code, and performing parameter dynamic filling on the target broadcast control template in combination with the multi-source monitoring data; and performing logic verification on the target broadcast control template after parameter filling, triggering a broadcast control decision reconstruction process when verification is abnormal, and generating an executable broadcast control instruction set when verification is normal. According to the method, operation requirements of different time periods are dynamically adapted, so that the accuracy and timeliness of subway information broadcast control are improved, and the passenger travel experience and the operation efficiency are optimized.
Owner:HEFEI LANSHENG INTELLIGENT TECH CO LTD

Circuit breaker mechanical fault identification method and device

The invention discloses a circuit breaker mechanical fault identification method and device. The method comprises the following steps: acquiring SOE data and sound signal data of a circuit breaker in a preset time period; time features and action features are extracted from the SOE data, and a plurality of stages of the circuit breaker in the preset time period are identified according to the action features; extracting domain features corresponding to the stages from the sound signal data according to the time features; and inputting the domain feature corresponding to each stage into a pre-trained corresponding prediction model to obtain a fault identification result. According to the application, the original structural characteristics of the circuit breaker can be prevented from being changed in the fault identification process, and the accuracy of fault identification is improved at the same time.
Owner:GUANGDONG POWER GRID CO LTD +1

Method and system for correcting and additionally recording incomplete data of intelligent electric meter

The invention discloses a method and a system for correcting and additionally recording incomplete data of an intelligent electric meter. The method comprises the following steps: acquiring a time period corresponding to a data missing segment of a data missing day; screening out complete data in the same time period from the historical data, and forming a plurality of similar day data sets according to the relevance with the data missing day; a similar day data set with the highest data similarity is screened out, and data features in the similar day data set are calculated; and filling the data missing segment based on the data range corresponding to the data missing segment and the data feature. According to the method, the similar day data set most similar to the power consumption trend of the data missing segment of the data missing day is searched for to simulate the data feature and trend of the data missing segment for data filling, and compared with trend analysis and data filling of adjacent data, the method can be more accurate and close to the power consumption feature of an actual missing time period; therefore, a more accurate data completion result is obtained.
Owner:ZHEJIANG SUPCON INFORMATION TECH CO LTD

Traffic prediction method and device, equipment and storage medium

The invention discloses a traffic prediction method and device, equipment and a storage medium, and is applied to the field of traffic prediction. The traffic prediction method comprises the following steps: acquiring traffic data used by a plurality of Internet of Things cards of a user in a first time period; the traffic data is analyzed, traffic characteristic indexes of the multiple Internet of Things cards are determined, and the traffic characteristic indexes comprise service scenes and life cycle states of the Internet of Things cards and traffic values correspondingly used by the Internet of Things cards in the life cycle states; inputting the service scenes and the life cycle states of the plurality of Internet of Things cards and the traffic values correspondingly used by the Internet of Things cards in the life cycle states into a pre-trained traffic prediction model, and determining the number of the Internet of Things cards of the user in a second time period and the traffic value predicted to be used by each Internet of Things card, the second time period is a time period after the first time period. The flow prediction accuracy can be improved.
Owner:CHINA MOBILE M2M +1

Event time mark deviation correction method and system based on correlation signal time sequence matching

The invention discloses an event time mark deviation correction method and system based on correlation signal time sequence matching, and the method comprises the steps: building a correlation relation between secondary equipment correlation signals SOE, and the SOE refers to event sequence records; obtaining all SOEs with association relationship in a set time period of the association signal, and calculating the signal width and interval width of each SOE; time sequence matching based on the SOE signal width and the interval width is carried out on the associated signals, and related SOEs with successful time sequence matching are determined; and according to the absolute time difference between the related SOEs, carrying out SOE time scale deviation correction on a clock abnormal signal of a current event in the related signals. The method can achieve the precise correction of the SOE time scale of the abnormal time synchronization equipment, improves the operation reliability of a transformer substation protection operation and maintenance system, and facilitates the improvement of the operation and maintenance level of a relay protection system.
Owner:NR ELECTRIC CO LTD +1

High Performance Time-Based Queue

Devices, networks, systems, methods, and processes for utilizing a time-based queue are described herein. A device may receive an object stream comprising multiple objects. The device may assign a Time-To-Live (TTL) value for each object in the object stream and a maximum TTL value for the object stream. The device may create and store the time-based queue in a memory based on the maximum TTL value. The device may insert the objects in the time-based queue at corresponding object insertion times. The device can pop the objects out of the time-based queue in First-In-First-Out (FIFO) order. The objects may expire when time periods indicated by corresponding TTL values elapse after the corresponding object insertion times. The device can further remove the expired objects from the time-based queue. The time-based queue stored in the memory can include references to the objects stored in a time-based storage in form of an array.
Owner:CISCO TECHNOLOGY INC

Airport flight quantity and throughput prediction method and system

The invention discloses an airport flight quantity and throughput prediction method and system, and relates to the technical field of intelligent airport management. The method comprises the following steps: firstly, determining a future target time period to be predicted, and obtaining related multi-source data according to the future target time period; preprocessing the data and extracting time sequence and non-time sequence features; processing time sequence features by using the trained long-short-term memory neural network model, processing non-time sequence features by using the extreme gradient boosting tree model, and respectively obtaining prediction results; and integrating the outputs of the two types of models through a weighted fusion strategy to obtain an accurate prediction value of the flight sortie and the single-machine passenger capacity, and further calculating to obtain a passenger throughput prediction result. According to the method and the system provided by the invention, through the architecture of multi-source data fusion and hybrid intelligent model cooperation, the prediction precision and reliability are effectively improved, and scientific decision support is provided for airport operation management.
Owner:FEIYOU TECH CO LTD

Resource scheduling method and apparatus

Provided in the embodiments of the present disclosure are a resource scheduling method and apparatus. The resource scheduling method comprises: determining historical operating log data and historical resource usage data of a data processing node set which are generated within a preset historical time period; on the basis of the historical operating log data, and by means of using a log prediction model, predicting predicted operating log data of the data processing node set that is generated within a preset future time period; on the basis of the predicted operating log data, and by means of using a resource prediction model, predicting predicted resource usage data of the data processing node set that is required within the preset future time period; on the basis of the historical resource usage data, determining target resource usage data of the data processing node set within the preset future time period; and on the basis of the predicted resource usage data and the target resource usage data, performing resource scheduling on the data processing node set. The resource scheduling method is more reasonable and more intelligent, and does not require human participation, thus resulting in more stable application systems.
Owner:CLOUD INTELLIGENCE ASSETS HOLDING (SINGAPORE) PTE LTD

Real data generation method and system, storage medium and program product

The invention discloses a real data generation method and system, a storage medium and a program product, and the method comprises the steps: carrying out the trend analysis of target data, and obtaining a trend coefficient of the change trend of the target data; constructing a global trend function according to the trend coefficient; obtaining a primary period value and a secondary period value of the target data; constructing a period superposition function according to the primary period value and the secondary period value; performing function synthesis on the global trend function and the periodic superposition function to obtain a time sequence characteristic function; acting the time sequence characteristic function on each time sampling point of the target time period to obtain a reference data sequence; performing random disturbance processing on the reference data sequence according to preset fluctuation parameters to obtain a target data sequence containing random fluctuation characteristics; and adjusting the target data sequence according to a preset data constraint condition, and generating real data meeting the data constraint condition. According to the method and the device, the accuracy of reflecting the time sequence evolution rule by real data is improved, and the capability of discovering defects in time sequence related function tests is further improved.
Owner:DOMINANT INTELLIGENT TECH (SUZHOU) CO LTD

Path planning method and apparatus, device, system, and storage medium

PCT designated stageWO2025201180A1TransmissionPathPingTraffic prediction
The present application relates to the technical field of communications, and discloses a path planning method and apparatus, a device, a system, and a storage medium. The method comprises: acquiring traffic prediction information respectively corresponding to at least one time period; and on the basis of the traffic prediction information respectively corresponding to the at least one time period and at least one selectable path respectively corresponding to each service, determining a target forwarding path of each service meeting path planning objectives. The path planning objectives comprise: the service traffic borne by any link in a hierarchical network in any time period is less than or equal to the bandwidth capacity upper limit of any link, load balancing is realized between multiple links connected to a same network node in the hierarchical network, and the transmission quality of the target forwarding path of any service meets a quality requirement of any service. Path planning of a global service is realized, network link congestion can be reduced, and better effects that load balancing between all network links is realized and a service forwarding path meets a service quality requirement are achieved.
Owner:HUAWEI TECH CO LTD

Intuitive computer security report visuals

The techniques disclosed herein enable systems to generate intuitive security reports that illustrate security events that occur during a predefined time period (e.g., thirty days). The security report visual can include a pair of parallel axes where the first axis includes a plurality of time-series segments respectively representing security event types (e.g., obfuscation, phishing) and the second axis includes two time-series segments representing security events that are not remediated and security events that are remediated. A plurality of first lines originating at respective points along the first axis and terminating within a GUI element can represent security events of various types that occur at a particular time unit (e.g., a day) within the predefined time period. A plurality of second lines originating within the GUI element and terminating at respective points along the second axis can represent security events that are either remediated or not remediated.
Owner:MICROSOFT TECHNOLOGY LICENSING LLC

Fault positioning method and device, storage medium and program product

The embodiment of the invention provides a fault positioning method and device, a storage medium and a program product, relates to the technical field of communication, and can realize quick fault positioning and improve the fault positioning efficiency. The method comprises the steps that alarm information sent by first equipment is received, the first equipment comprises a plurality of ports, a first flow rate time sequence and a second flow rate time sequence of the flow rate of each port in a first time period are determined, and the first flow rate time sequence and the second flow rate time sequence are sent to the first equipment; and finally, based on the first flow rate time sequence and the second flow rate time sequence of each port in the plurality of ports, determining a port in a fault state in the first equipment. Wherein the first flow rate time sequence is used for representing the change condition of the actual flow rate of the port in the first time period, and the second flow rate time sequence is used for representing the change condition of the predicted flow rate of the port in the first time period.
Owner:CHINA UNITED NETWORK COMM GRP CO LTD

Power transmission line icing galloping prediction method and system based on improved time sequence large model, equipment and storage medium

The invention discloses a power transmission line icing galloping prediction method and system based on an improved time sequence large model, equipment and a storage medium, and relates to the technical field of power system safety monitoring, and the method comprises the steps: obtaining line parameters, and meteorological data and power transmission line icing galloping data in an abnormal accumulation time period; constructing a data feature project by using the line parameters, the meteorological data in the abnormal accumulation time period and the icing galloping data of the power transmission line; performing data synthesis on the meteorological data and the icing galloping data of the power transmission line in the abnormal accumulation time period through time alignment to obtain a comprehensive time sequence; and taking the comprehensive time sequence as input, and obtaining the icing galloping probability and the galloping amplitude of the power transmission line based on the output of the improved time sequence large model. According to the invention, the icing galloping risk early warning of the power transmission line can be rapidly and accurately output, and reliable guarantee is provided for safe operation of a power grid.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD RESEARCH INSTITUTE +2

Method and system for monitoring operation state of audio transformer

The invention relates to the technical field of electrical variable measurement, in particular to an audio transformer operation state monitoring method and system, and the method comprises the steps: drawing a voltage signal curve; dividing the voltage signal curve into a plurality of time periods; the time period closest to the ideal operation state is selected as a reference section, and the reference difference degree of each time period is obtained according to the similarity between each time period and the reference section; according to the difference between each time period and the adjacent time period and the stability of the audio data of each time period, acquiring a voltage anomaly factor of each time period; and obtaining the degree of the influence of the external factors on the voltage in each time period, and obtaining fault evaluation in combination with the reference difference degree and the voltage abnormal factors, thereby realizing the monitoring of the operation state of the audio transformer. According to the invention, the accurate probability of abnormal operation of the audio transformer is obtained, and the accuracy of monitoring the operation state of the audio transformer is improved.
Owner:DONGGUAN DESHENG ELECTRONIC TECH CO LTD

Action synchronization for target object

A method for synchronizing an action of a target object with source audio is provided. Facial parameter conversion is performed on an audio parameter of the source audio at different time periods to obtain source parameter information of the source audio at the respective time periods. Parameter extraction is performed on a target video that includes the target object to obtain target parameter information of the target video. Image reconstruction is performed on the target object in the target video based on the source parameter information of the source audio and the target parameter information of the target video, to obtain a reconstructed image. Further, a synthetic video is generated based on the reconstructed image, the synthetic video including the target object, and the action of the target object being synchronized with the source audio.
Owner:TENCENT TECHNOLOGY (SHENZHEN) CO LTD