Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for overbreak-underbreak control of tunnel based on building information modeling (BIM)

A technology of over-under-digging and tunneling, applied in tunnels, earth-moving drilling, instruments, etc., can solve the problems of single function, unable to realize intelligent and automatic management of construction site, etc., and achieve the effect of control

Active Publication Date: 2018-12-04
CHINA RAILWAY 18TH BUREAU GRP CO LTD
View PDF8 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This technology is only for the self-positioning and measurement of the rock drilling rig, and its function is relatively single, so it cannot realize the intelligent and automatic management of the construction site;

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for overbreak-underbreak control of tunnel based on building information modeling (BIM)
  • Method for overbreak-underbreak control of tunnel based on building information modeling (BIM)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] figure 1 It is a schematic diagram of the principle of a BIM-based tunnel overbreak and underbreak control method according to an embodiment of the present invention.

[0018] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. The present invention provides a method for controlling over- and under-excavation of tunnels based on BIM. The device for realizing the method includes a fully intelligent rock drilling rig control device and a central processing system, etc.;

[0019] The application method of the present invention is as follows: according to the geological design of the tunnel, the tunnel BIM model is made in the central processing system.

[0020] The secondary development of the central processing system of the central processor is carried out. The BIM model in the central processing system includes a geological analysis module, a drilling and blasting scheme selection modul...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for overbreak-underbreak control of a tunnel based on building information modeling (BIM). According to the method, a full intelligent drill jumbo is connected with acentral processing unit of a user terminal, the precise positioning and multi-arm synchronous attitude adjustment of the drill jumbo are realized in the tunnel, multiple-drilling-arm automatic operation is achieved, and the peripheral contour of the tunnel and the positions of positioning boreholes are measured automatically. Geological analysis is carried out by combining advanced level drillinggeological exploration data with BIM technology analysis, according to drilling and blasting design matched with the implanted drilling and blasting design scheme, in cooperation with the constructionexperience of blasting personnel, the drilling and blasting design scheme is dynamically adjusted, and an LS-DYNA program is combined to perform drilling and blasting simulation, so that the best drilling and blasting program is formulated. The drill jumbo performs drilling according to the scheme, overbreak-underbreak is controlled strictly, and the intelligent and automatic management of personnel and machineries at a tunnel excavation construction site is realized, so that the control of overbreak and underbreak of the tunnel is achieved.

Description

technical field [0001] The invention relates to the related technical field of tunnel construction site technical management, in particular to a method for controlling over- and under-excavation of tunnels based on BIM. Background technique [0002] Excavation is a key process in tunnel construction. Too much over-excavation will not only increase the project cost due to the increase of slag discharge and lining volume, but also cause stress concentration due to local over-excavation, which will affect the stability of surrounding rock. Under-excavation directly affects the thickness of the lining, and it takes time and effort to deal with it. Although overbreak and underbreak are inevitable in drilling and blasting construction, certain measures can be taken to control the value of overbreak and underbreak to a small level, reducing the impact on construction cost, construction progress and tunnel safety. The influencing factors of overbreak and underbreak are divided int...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/10G06F17/50F42D1/00F42D3/04
CPCE21D9/006E21D9/108F42D1/00F42D3/04G06F30/13G06F30/23
Inventor 黄欣袁帅刘松涛张京京
Owner CHINA RAILWAY 18TH BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products