Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

138 results about "Time stress" patented technology

Time Stress can in part, be defined as time rushing in on us at a pace that is too fast to handle. There are three dimensions of time in most cultures, the past, the present and the future. Stress is suffered in the present and concerns the future. Our program is design to travel to the past to change the future.

Dynamic soft reduction method for detecting tail end of solidified liquid core of casting blank based on pressure feedback

The invention relates to a dynamic soft reduction method for detecting the tail end of a solidified liquid core of a casting blank based on pressure feedback, belonging to the technical field of metallurgy continuous casting control. The method comprises the following steps of: firstly, establishing a control platform for remotely and automatically adjusting roll gaps of all sector sections on a continuous casting machine, and calculating the stress of the casting blank in different sector sections by utilizing the detection result of pressure sensors installed on all the sector sections; detecting the stress difference of the casting blank in each sector section during roll gap variation by changing the roll gap contraction size of each sector section; judging the position of the tail end of the solidified liquid core of the casting blank according to the stress difference between the casting blank with the liquid core and the casting blank without the liquid core; and finally, dynamically adopting different reduction quantities in all sector sections of a casting machine by using a soft reduction control system according to the position of the tail end of the liquid core judged by the method. The method for judging the tail end of the solidified liquid core of the casting blank is directly obtained by calculating the real-time stress of the casting blank. Because the calculation of casting blank surface temperature and blank shell thickness does not need a large quantity of mathematical models, the calculation method is simple and effective and ensures the stability and the execution efficiency of a casting machine control system.
Owner:HBIS COMPANY LIMITED HANDAN BRANCH COMPANY

Dangerous and old building monitoring system based on Beidou positioning technology and dangerous and old building monitoring method based on Beidou positioning technology

The invention discloses a dangerous and old building monitoring system based on the Beidou positioning technology. The dangerous and old building monitoring system comprises a, an inclination and settlement monitoring module which is used for extracting the inclination characteristic quantity of the monitored house building in real time; b, a crack monitoring module which is used for monitoring the crack width of the monitored house building in real time; c, a stress-strain monitoring module which is used for performing real-time stress-strain characteristic quantity monitoring on the monitored house building; d, a dynamic characteristic monitoring module which is used for monitoring the change of the dynamic characteristic after internal damage of the monitored house building; e, an information processing module which is used for receiving the monitoring data outputted by the inclination and settlement monitoring module, the crack monitoring module, the stress-strain monitoring moduleand the dynamic characteristic monitoring module; f, a BDS positioning system; g, an auxiliary monitoring module; h, a central processing module; i, an intelligent analysis cloud platform; and j, a client side module. The advantages are that safety warning of the dangerous and old building can be realized.
Owner:张天骏

Micro-expression identification device and method

InactiveCN105913046AReduce complexityImprove the efficiency of micro-expression detectionAcquiring/recognising facial featuresIdentification devicePhases of clinical research
The present invention provides a micro-expression identification device and method. The device comprises an expression collector, a micro-expression identification device and a questioning validity analyzer. The expression collector is configured in the test title questioning stage of a tested person by a tester and collects the real-time stress expression information when the tested person is answering the questions; the micro-expression identification device is connected with the expression collector and is configured to identify whether the tested person's real-time stress expression is the micro expression or not according to the real-time stress expression information and the tested person's base line expression information; and the questioning validity analyzer is connected with the micro-expression identification device and is configured to determine the questioning validity of the questioning test according to the identification result of the micro-expression identification device. The present invention further provides a micro-expression identification method corresponding to the micro-expression identification device. According to the invention, the complexity of the micro-expression identification may be greatly reduced, and the efficiency of micro-expression detection is improved.
Owner:姜振宇

Method for detecting disease of metro shield tunnel based on deep learning

A method for detecting disease of a metro shield tunnel based on deep learning comprises the following specific implementation steps of A, camera set-up and shooting; B, over-fitting processing of data in a surveying area; C, evaluation and revision of a model; D, identification and location of tunnel damages; and E, automatic online monitoring and real-time storage of tunnel damages in the surveying area. The method provided by the invention has the advantages of 1, solving the shortcomings of low efficiency, low degree of digitization, and informatization and automation unfavorable to detection of the traditional manual inspection; 2, solving the problem that the image transmission distance is limited in the traditional tunnel damage monitoring method, and improving the measurement precision; 3, greatly alleviating recognition errors caused by environmental factors by adding a deep learning algorithm; and 4, transmitting the image information collected by the camera to the computer by using the high-speed Gigabit Ethernet to realize fast real-time transmission and immediate processing of the data online, so that the monitoring video can be viewed combined with the real-time stress state of the cable, and the event full information playback can be realized.
Owner:ZHEJIANG UNIV

Red high-brightness elastic stress luminescent material and preparation method thereof

The invention relates to a red high-brightness elastic stress luminescent material and a preparation method thereof. The preparation method is characterized in that a red high-brightness elastic stress luminescent material (Ba, Ca) TiO3:Pr<3+>, Re<3+> (Re<3+> is one or more of Y<3+>, La<3+>, Nd<3+>, Gd<3+>, Yb<3+> and Lu<3+>) is prepared by taking a complex-phase (Ba, Ca) TiO3:Pr<3+> material as a matrix and using a method for co-doping one or more of trivalent rare earth ions Y<3+>, La<3+>, Nd<3+>, Gd<3+>, Yb<3+> and Lu<3+> and a trivalent rare earth ion activating agent Pr<3+>. The red high-brightness elastic stress luminescent material and the preparation method thereof have the advantages: (1) the preparation method of the material is simple, easy to operate and low in equipment requirement; (2) the prepared material (Ba, Ca) TiO3:Pr<3+>, Re<3+> is relatively strong in elastic stress luminescence, clear and macroscopic in elastic stress luminescence brightness at dark places, rapid in stress luminescence afterglow attenuation, free of macroscopic stress luminescence glows and stress tracks and capable of being widely applied to the fields such as real-time stress distribution detection, stress sensors, displays, entertainment devices and the like for living bodies, mechanical parts, buildings and the like; (3) the raw materials Ba, Ca and Ti of a material system are all rich elements on the earth and belong to environment-friendly materials.
Owner:QINGDAO UNIV

High electron mobility transistor device and manufacturing method thereof

The invention provides a high electron mobility transistor device, relating to the technical field of semiconductors. The first dielectric layer of the device is on a semiconductor layer between a gate and source and drain electrodes. A first source field plate is on the first dielectric layer between the gate and the drain electrode. A second dielectric layer is on the gate, the first source field plate and the first dielectric layer. A second source field plate is on the gate and the first source field plate. The first source field plate and the second source field plate weaken the strong electric field close to a gate area between the gate and the drain electrode. The probability of the failure of the first dielectric layer and the second dielectric layer under long-time stress and high voltage stress is little. According to the device, the strong electric field close to the gate area between the gate and the drain electrode can be weakened, and the probability of the failure of the dielectric layers between the gate and the source field plates can be reduced. The invention also provides a manufacturing method of the high electron mobility transistor device, the process is simple, and the reliability of the manufactured device is high.
Owner:昆山工研院第三代半导体研究院有限公司

Pipeline real-time stress obtaining method

The invention discloses a pipeline real-time stress obtaining method. The method comprises the following steps: a series of measurement sensors are installed along the axial direction of a detected pipeline, wherein the measurement sensors are non-contact type acceleration transducers or displacement sensors, the measurement sensors are arranged at equal intervals, each measurement sensor is taken as on measurement point, and amplitude obtained by each measurement sensor is input to a processor; displacement of each point at current time is obtained in real time, wherein the relation between the stress sigma of the pipeline and displacement y is indicated in the descriptions; and a vibration-stress model indicated in the descriptions is constructed by taking measurement values of every three adjacent measurement points as a group, wherein if is assumed that there are n+1 measurement points, a stress curve of the whole pipeline is fitted by use of equivalent vibration stress of (2-n)-th measurement points. According to the invention, the pipeline real-time stress obtaining method has the following advantages: adhesion of foil gauges at the surface of the pipeline is unnecessary, an inherent structure of the pipeline does not have to be changed, and pipeline stress parameters can be accurately obtained in real time.
Owner:ZHEJIANG UNIV

Structural member residual strength assessment method based on multi-factor fusion correction

The invention provides a structural member residual strength assessment method based on multi-factor fusion correction. The method includes the following steps that finite element software is used for conducting finite element analysis on a to-be-tested structural member, and the most easily broken position, the maximum stress value and stress state distribution near the position with the maximum stress value of the to-be-tested structural member are obtained; a fatigue test is conducted on the to-be-tested structural member, and the fatigue life under the maximum stress value condition is obtained; the real-time stress value of the most easily broken position of the to-be-tested structural member under the actual working condition is measured; a stress concentration correction coefficient is obtained; the dimension correction parameter of the to-be-tested structural member is calculated; the surface quality correction parameter of the to-be-tested structural member is obtained; the residual strength of the to-be-tested structural member is calculated finally. The method takes all factors capable of affecting the damage state of the structural member into account, wherein the factors refer to the fatigue life of the structural member, stress concentration, stress distribution conditions, a manufacturing process, the surface strength and the like; the problem that in the prior art, factors taken into account are singular is effectively solved, and the accuracy of an assessment result is greatly improved.
Owner:南京市特种设备安全监督检验研究院 +1

Ice-coated electric transmission line weak link early warning method

InactiveCN104167076AOmit the middle linkHigh precisionAlarmsElectric power systemEngineering
The invention discloses an ice-coated electric transmission line weak link early warning method. The ice-coated electric transmission line weak link early warning method comprises the following steps that firstly, weather forecast information, ice-coating information and electric transmission line information are determined; secondly, the real-time stress values of grades in a tension support section are solved based on an accurate model stress calculation model of an electric transmission line wire, and the unbalanced force received by a pole tower is worked out; thirdly, the numerical relationship between the real-time stress values and the limiting stress value is analyzed, wire early warning is carried out according to grades, the unbalanced force of the pole tower and the limiting unbalanced force are compared, and pole tower early warning is carried out according to grades. By means of the ice-coated electric transmission line weak link early warning method, the broken electric transmission line wire can be intelligently judged when an electric system is in an ice-coating period. Information is comprehensively collected, stress values of all the grades of the line are measured through a ruling span calculation model and the accurate stress calculation model, and therefore whether the line faces the line broken risk or not can be accurately judged, and the defects that a traditional judging method is not direct and is low in precision and long in consumed time can be avoided.
Owner:NANJING UNIV OF SCI & TECH

Real-time strain measurement apparatus for stamping and forming and test method thereof

The invention, which belongs to the dynamic strain measurement technology field, relates to a real-time strain measurement apparatus for stamping and forming and a test method thereof. The real-time strain measurement apparatus comprises a static strain indicator, leads, foil gauges and a die. The foil gauges are fixed on test points and are connected with the static strain indicator through leads; besides, the die comprises a punch die and a female die; and a groove that is used for placing the foil gauges is arranged at positions of the female die, wherein the positions are corresponded to the test points. When real-time strain measurement on stamping and forming is carried out, different deformation portions of a workpiece and portions having different strain characteristics are utilized as test points of a sheet metal; the foil gauges are pasted; the foil gauges of the apparatus and the connecting leads are placed in the groove; the connecting leads are led out by the groove; and on the basis of utilization of a step-by-step stamping method, a real-time stress strain value is measured and obtained. According to the invention, the structure of the apparatus is simple and reasonable; it only needs to improve a die, so costs are low; and the apparatus has strong practicability; besides, the test method is simple and rapid; and during the part stamping stroke, it is convenient to measure a strain value.
Owner:YANGZHOU UNIV

Intelligent substation secondary system reliability evaluation method based on failure physics

The invention provides an intelligent substation secondary system reliability evaluation method based on failure physics, comprising the following steps: analyzing the failure modes and potential failure mechanisms of a relay, an optical coupler, an optical fiber and a CPU chip; building failure physics models of various failure mechanisms based on the relationship between time-stress and the inherent parameters of the devices, and getting failure life functions of the devices in various failure modes; building distribution models of failure time under various failure mechanisms, and constructing a probability density function describing failure time; calculating the instantaneous failure rate of a failure mechanism of the devices according to the probability density function and a cumulative failure distribution function of the failure mechanism of the devices; and building an intelligent substation secondary system reliability model according to failure rate functions of the devices to evaluate the reliability of a secondary system of an intelligent substation. The evaluation result provides reference for maintenance of the secondary equipment of the intelligent substation, which is conductive to safe and stable operation of the intelligent substation.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO ZHENJIANG POWER SUPPLY CO +2

Method and equipment for evaluating technological property of bolt installation

The invention relates to a method and equipment for evaluating the technological property of bolt installation, and the method comprises the steps: determining the fastening sequence of bolts; testing the total pulling force of bolts in an operation process under the condition of different loads; obtaining a real-time stress amplitude value; making a conclusion that an end face of a connected part is cracked when the real-time stress amplitude value is greater than a standard stress amplitude value; and determining the fastening sequence of new bolts till the fastening sequence of the current bolt is judged to be the optimal bolt fastening sequence. The equipment comprises a signal input end module, a signal collection and processing module, and a man-machine interaction module, wherein the signal input end module comprises a strain signal input end, a standard analog input end, and a power circuit. The signal collection and processing module comprises a processing chip. The man-machine interaction module comprises a processor, a communication interface, an operation module, and a display module. The method and equipment can test the bolts, propose a new installation technology, and facilitate the maintenance of the bolts.
Owner:BEIJING TIANYUAN SCI & TECH CREATION WINDPOWER TECH

Stress testing device for brake adjuster

The invention discloses a stress testing device for a brake adjuster, and belongs to the technical field of stress testing of the brake adjuster; the invention aims to provide a device for testing a real-time stress condition and a starting force on the brake adjuster. The device comprises a bracket, a bearing plate, an adjusting rod, a guiding rod, a belleville spring and a force sensor. The device is structurally characterized in that the bearing plate is arranged in front of the bracket, two guiding rod locating holes are arranged in the bearing plate, and adjusting rod locating holes are arranged in four corners on the bearing plate; the adjusting rod, the force sensor, the guiding rod and the belleville spring are arranged between the bearing plate and the bracket; the belleville spring is sleeved on the guiding rod, a front section of the guiding rod is sleeved in the guiding rod locating holes; the force sensor is fixed on the bracket, and is arranged right behind the guiding rod and is in close contact with the guiding rod; the adjusting rod comprises a front part, a middle part and a rear part, wherein the front part is sleeved in the adjusting rod locating holes in the bearing plate and the rear part is fixed with the bracket; the device is mainly applied to the stress testing of the brake adjuster.
Owner:中电科鹏跃电子科技有限公司

Real-time pre-stress monitoring type clip anchoring tool and anchoring tool tension method thereof

ActiveCN104895334APrecise control of prestressHigh anchor precisionBuilding material handlingElectrical resistance and conductancePre stress
The invention provides a real-time pre-stress monitoring type clip anchoring tool and an anchoring tool tension method thereof, relates to a clip anchoring tool and an anchor tool tension method, and aims at solving the problems of the exiting anchoring tool that the loss of the pre-stress anchoring tool is difficult to monitor on real time and the tension control stress of pre-stressed ribs cannot be accurately ensured. The device is that a regular octagonal groove is processed in the outer surface of an inner anchoring ring in the radial direction; a conductor hole channel is corresponding to the axial position of the regular octagonal groove; a monitoring instrument is connected with eight resistance straining sheets through connectors; eight resistance straining sheets are arranged on four side surfaces at intervals in the regular octagonal groove; two resistance straining sheets are arranged on each side surface provided with the resistance straining sheet. The method comprises the steps of 1, mounting the anchoring tool; 2, tensioning a jack; 3, repeating step 2 according to the display value of the real-time pressure monitoring instrument until reaching sigma con; 4, connecting the real-time stress monitoring instrument during using the structure, and operating according to the step 3. The device and the method are applied to the pre-stress monitoring and the tensioning of the pre-stressed ribs.
Owner:HARBIN INST OF TECH

Structure synchronous unloading device and construction method thereof

The invention discloses a structure synchronous unloading device and a construction method thereof. The structure synchronous unloading device comprises an upper structure column, a lower structure column, a structure beam, a gap, a bracket, a temporary fixing device and a synchronous unloading control system, wherein the gap is formed between the upper structure column and the lower structure column; the bracket is welded on the upper structure column; the upper structure column and the lower structure column are fixed through the temporary fixing device; a cushion block, an inclined cushion block, an adjusting cushion block, a hydraulic jack and a U-shaped cushion block are respectively placed on the structure beam from bottom to top; and the synchronous unloading control system comprises a hydraulic power unit, a synchronous control system and a hydraulic line. The construction method comprises the following steps: determining the size of the gap; temporarily fixing through the temporary fixing device; placing the cushion block and the like; unloading; installing the hydraulic power unit; dismantling the U-shaped cushion block; unloading in a graded way; and welding the upper structure column and the lower structure column. The structure synchronous unloading device is high in safety, low in low, little in pollution and convenient and fast in operation, a support jig frame is not used as a force transfer structure, and the long-time stress of a jack piston is avoided.
Owner:CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products