Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

3329results about How to "The method steps are simple" patented technology

Black soybean cake processing method

The invention provides a black soybean cake processing method. The processing comprises the steps that 1, black soybean powder, glutinous rice flour, rice flour, red dates, lily, sweet-scented osmanthus, the fruits of Chinese wolfberry, mint leaves, granulated sugar, sesame powder and palm oil are weighed; 2, the red dates, the lily, the sweet-scented osmanthus, the fruits of Chinese wolfberry and the mint leaves are heated and decocted; 3, the granulated sugar is heated to be dissolved; 4, the black soybean powder, the glutinous rice flour and the rice flour are mixed, and then mixed liquid and the palm oil are added in the mixture for high-temperature steaming; 5, the steamed cake is coated with the sesame powder in a rolling mode. The black soybean cake processing method has simple steps, the black soybean cake is crisp and delicious and makes people enjoy aftertaste, and black soybeans have rich nutrients and have the effects of promoting cholesterol metabolism, lowering blood lipid, preventing cardiovascular disease and the like. Meanwhile, due to the fact that the red dates, the lily, the sweet-scented osmanthus, the fruits of Chinese wolfberry, the mint leaves and the like are added in the formula, the black soybean cake has the effects of enriching yin, nourishing kidney, protecting the liver, nourishing the stomach, discharging toxicant, keeping beauty and the like.
Owner:江新祥

Electric vehicle intelligent queuing method capable of improving charging efficiency

The invention provides an electric vehicle intelligent queuing method capable of improving charging efficiency. The method is characterized by comprising the following steps that firstly, an electric vehicle driver is in connection with an intelligent charging network and a vehicle-mounted computer of an electric vehicle through an intelligent terminal; secondly, the intelligent terminal receives electric vehicle information transmitted by the vehicle-mounted computer in real time, wherein the electric vehicle information comprises electric vehicle serial numbers, residual electricity quantity, driving mileage and charging early-warning signals; thirdly, after the intelligent terminal receives the charging early-warning signals, the intelligent terminal is in communication with the intelligent charging network server and issues a charging request to the intelligent charging network server, ..., and eleventh, the turned electric vehicle is connected with an intelligent charging pile to be charged. According to the method, through a smart phone, the charging pile can be looked for, and through the residual electricity quantity of the electric vehicle, waiting time and predicated charging time required by charging several closest charging piles can be accurately predicated, the queuing efficiency is improved, and the queuing time is shortened.
Owner:BEIJING FLASH CHARGE NETWORK TECH CO LTD

Image type fire flame identification method

The invention discloses an image type fire flame identification method. The method comprises the following steps of 1, image capturing; 2, image processing. The image processing comprises the steps of 201, image preprocessing; 202, fire identifying. The fire identifying comprises the steps that indentifying is conducted by the adoption of a prebuilt binary classification model, the binary classification model is a support vector machine model for classifying the flame situation and the non-flame situation, wherein the building process of the binary classification model comprises the steps of I, image information capturing;II, feature extracting; III, training sample acquiring; IV, binary classification model building; IV-1, kernel function selecting; IV-2, classification function determining, optimizing parameter C and parameter D by the adoption of the conjugate gradient method, converting the optimized parameter C and parameter D into gamma and sigma 2; V, binary classification model training. By means of the image type fire flame identification method, steps are simple, operation is simple and convenient, reliability is high, using effect is good, and the problems that reliability is lower, false or missing alarm rate is higher, using effect is poor and the like in an existing video fire detecting system under a complex environment are solved effectively.
Owner:东开数科(山东)产业园有限公司

Method for preparing fluorescent nano material converted on NaYF4

The invention relates to a method for preparing fluorescent nano material converted on NaYF4, comprising the steps: yttrium nitrate, ytterbium nitrate and erbium nitrate or yttrium chloride, ytterbium chloride, erbium chloride and thulium chloride are dissolved in de-ionized water according to the mixture radio that the mol ratio of rare earth ions which are yttrium ion, ytterbium ion and erbium ion is equal to (70-95): (1-25): (0.5-10), so that the mixed solution is prepared; water soluble polymer having the ligand radical with the rare earth ions is added into the mixed solution for stirring reaction to form complex compound; the pH value of the mixed solution is adjusted to be 2-6; sodium fluoride, ammonium fluoride or hydrofluoric acid can be added into the mixed solution and stirred until colloid solution that is approximately transparent is obtained; then, the colloid solution is put into a high pressure closed reactor and heated at the temperature of 140-200 DEG C; after that the obtained product is cooled to be the room temperature, centrifugated, separated, washed and dried, finally, the fluorescent nano material converted on NaYF4 is obtained. The method can be used for preparing the converted material at lower temperature, the particle size and the appearance can be controlled, and the water-solubility is good.
Owner:CHANGCHUN INST OF OPTICS FINE MECHANICS & PHYSICS CHINESE ACAD OF SCI

Wavelet transform and variable-step-size LMS (least mean square) adaptive filtering based signal denoising method

The invention discloses a wavelet transform and variable-step-size LMS (least mean square) adaptive filtering based signal denoising method which comprises the following steps that: 1, signal receiving and synchronous storage: a data processor synchronously stores received signals into a data memory so as to obtain a sampling sequence X (k) which is a one-dimensional signal; 2, high-frequency signal extraction: the data processor carries out wavelet transform on the currently received one-dimensional signal X (k) and extracts high-frequency signals; and 3, LMS adaptive filtering: the data processor invokes the high-frequency signals extracted by an LMS adaptive filter to carry out LMS error calculation so as to obtain output signals subjected to filtering, and carries out adjustment on the parameters of the filter according to error signals, so that the output signals tend to interference signals. The method disclosed by the invention is simple in steps, reasonable in design, convenient to realize, and good in denoising effect; and the denoising process is performed through the combination of wavelet transform and variable-step-size LMS adaptive filtering, so that the filtering effect and the tracking speed are effectively increased.
Owner:XIAN UNIV OF SCI & TECH

Water conservation coal cutting method for small and medium-sized coal mines in waterhead area

The invention discloses a water conservation coal cutting method for small and medium-sized coal mines in a waterhead area. The method comprises the following steps: 1, defining the position of a coal bed, that is, defining the thickness and the buried depth of the coal bed in an exploited coal mine according to a boring log; 2, defining exploitation parameters, that is, defining a roof rock beambearing load, the higher limit value Lmax of the width of an exploitation strip, and the lower limit value Dmin of the width of a coal pillar; 3, defining an exploitation scheme, that is, defining the mining and the reservation widths during strip exploitation according to the Lmax and the Dmin, wherein the width L0 of a strip exploited during strip exploitation is smaller than or equal to Lmax, and the width D0 of a reserved coal pillar is larger than or equal to Dmin; and 4, exploiting, that is, exploiting the coal bed according to the conventional strip exploitation method, and reserving acoal pillar of which the width is D0 every time when a strip of which the width is L0 is exploited. The water conservation coal cutting method has the advantages that the design is reasonable; the implementation is convenient; the maneuverability is high; the using effect is good; and the problems of easily caused great loss of the phreatic water resource, and poor water conservation coal cuttingeffect during the conventional exploitation of the small and medium-sized coal mines in the waterhead area are solved.
Owner:XIAN UNIV OF SCI & TECH

Method for preventing and controlling bottom heaving disaster of mine stoping tunnel

The invention discloses a method for preventing and controlling a bottom heaving disaster of a mine stoping tunnel. The method comprises the following steps: 1) digging a stoping tunnel; 2) confirming a mechanical parameter of a surrounding rock substrate; 3) confirming a supporting scheme for the stoping tunnel: respectively confirming supporting structures adopted by a top plate supporting system, a tunnel side part supporting system and a base plate supporting system, wherein the supporting structure is confirmed by adopting the top plate supporting system according to a conventional confirming method for a tunnel top plate supporting scheme, the supporting structure is confirmed by adopting the tunnel side part supporting system according to the width of a coal side breaking area, andthe supporting structure is confirmed by adopting the base plate supporting system according to the maximum breaking depth of the tunnel base plate and the horizontal distance from the maximum breaking depth of the tunnel base plate to a side wall of an adjacent tunnel; and 4) constructing the supporters of surrounding rocks of the stoping tunnel. The method provided by the invention is simple insteps, is conveniently realized, is low in invested cost and is good in use effect. The bottom heaving problem of the mine stoping tunnel under a complex condition is solved. The repairing operation of the stoping tunnel is avoided and the construction cost is low.
Owner:XIAN UNIV OF SCI & TECH

Subway station deep foundation pit excavation construction method

The invention discloses a subway station deep foundation pit excavation construction method, wherein the upper portion of an excavated foundation pit is a sandy gravel stratum, and the lower portion of the excavated foundation pit is a mud rock stratum. The method includes the steps of 1, precipitation construction, wherein precipitation construction is conducted on the sandy gravel stratum through a precipitation well and 2, foundation pit excavation, wherein the foundation pit excavation includes the following steps of foundation pit partition and foundation pit earthwork excavation; the excavated foundation pit is divided into a plurality of small foundation pit bodies to conduct excavation respectively; the small foundation pits comprise first foundation pit bodies and second foundation pit bodies; excavation is conducted on the divided small foundation pit bodies; an open-cut method is adopted for the first foundation pit bodies and the second foundation pit bodies; the first foundation pit bodies are supported by fender posts, reinforced concrete supports and steel pipe inner supports; the second foundation pit bodies are supported by the fender posts, pre-stressed anchor cables and the steel pipe inner supports. The subway station deep foundation pit excavation construction method is simple in step, reasonable in design, convenient to construct, faster in construction process, good in construction effect and capable of easily conveniently and fast to finish deep foundation pit excavation construction process, and the influences on the surrounding environment by the excavation construction process are smaller.
Owner:中铁二十局集团第三工程有限公司

Building outer boundary line extraction method based on onboard LiDAR (Light Detection and Ranging) data

The invention discloses a building outer boundary line extraction method based on onboard LiDAR (Light Detection and Ranging) data. The method comprises the following steps: I, acquiring LiDAR point cloud data; II, processing the LiDAR point cloud data: processing point cloud data of a building, and extracting an outer boundary line of the building, wherein the point cloud data of the building is processed through the following steps: 201, extracting the outer boundary points of the building; 202, extracting feature points; 203, performing linear fitting through a least square method, and acquiring an initial boundary line; 204, determining the main direction and the secondary direction of the building; 205, regularizing the initial boundary line: performing regularization processing on a plurality of linear segments in the initial boundary line respectively according to the determined main direction and secondary direction; 206, acquiring the regularized boundary line. The method is simple in steps, is reasonable in design, is convenient to implement and has a good use effect; the extraction process of the outer boundary line of the building can be finished easily, conveniently and rapidly, and the regularization degree of an obtained outer boundary vector is high.
Owner:AERIAL PHOTOGRAMMETRY & REMOTE SENSING CO LTD

High ground stress weak surrounding rock tunnel excavation and support construction method

The invention discloses a high ground stress weak surrounding rock tunnel excavation and support construction method. Excavation and support construction are conducted on a weak surrounding rock tunnel to be constructed in multiple sections from rear to front in the longitudinal extension direction of the tunnel. The method comprises the steps that 1, rock body strength and the maximum ground stress inside surrounding rock are tested; 2, the extrusion-type large-deformation level of the surrounding rock is determined; 3, a primary support scheme is determined, wherein the primary support scheme is determined according to the determined extrusion-type large-deformation level, and the primary support scheme is a profile steel frame support scheme or a grid steel frame and cover arch combined support scheme; 4, tunnel excavation and support construction are conducted; 5, excavation and support construction of the next section are conducted; 6, the fifth step is repeated for many times till the whole excavation and support construction process of the weak surrounding rock tunnel to be constructed is completed. According to the high ground stress weak surrounding rock tunnel excavation and support construction method, the steps are simple, the design is reasonable, construction is convenient, the use effect is good, the tunnel excavation and support construction process of the high ground stress weak rock tunnel can be completed easily, conveniently and rapidly, and the construction process is safe and reliable.
Owner:CHINA RAILWAY 20 BUREAU GRP

Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting

The invention discloses a construction method for supporting a deep foundation pit through grouting after pile arrangement and anchor cable mounting. The construction method comprises the steps that firstly, pile arrangement supporting structure construction is performed, wherein a pile arrangement supporting structure comprises multiple slope protection piles which are arranged along the peripheral edge line of the constructed foundation pit from front to rear and a crown beam connected to the upper portions of the slope protection piles; secondly, foundation pit excavation is performed, wherein the constructed foundation pit is excavated from top to bottom; and thirdly, anchor cable supporting structure and waist beam construction is performed, wherein during excavation of the constructed foundation pit, the constructed foundation pit is excavated to the anchoring position of an anchor cable supporting structure, and the anchor cable supporting structure is constructed; and the anchor cable supporting structure comprises multiple prestress anchor cables, each prestress anchor cable comprises an anchor cable body, a primary grouting pipe and a secondary grouting pipe, and each anchor cable body comprises multiple steel strands. The method has the beneficial effects that the steps are simple, the design is reasonable, construction is easy and convenient, the use effect is good, the deep foundation pit supporting construction process can be completely easily, conveniently and quickly, the cost of the adopted prestress anchor cables is low, the anchoring force is high, and the deep foundation pit can be supported effectively.
Owner:SCEGC NO 6 CONSTR ENG GRP CO LTD

Establishment method for small fragmental DNA (Deoxyribose Nucleic Acid) library based on Ion ProtonTM sequencing platform and application of establishment method

The invention belongs to the field of gene sequencing, and discloses an establishment method for a small fragmental DNA (Deoxyribose Nucleic Acid) library based on an Ion ProtonTM sequencing platform, and a relevant solvent composition solution. The establishment method disclosed by the invention comprises the steps of DNA sample extraction, tail end repairing, fragment selection, joint connection, PCR (Polymerase Chain Reaction) amplification, library detection, high-throughput sequencing and the like, wherein a reagent I, a reagent II and a reagent III are respectively adopted in the steps of tail end repairing, joint connection and PCR amplification. The establishment method disclosed by the invention is precise and simple in step, simple to operate, small in reagent variety and low in cost, the loss and waste of the library are reduced, and the working efficiency is improved; in addition, the establishment method can be applied to noninvasive antenatal diagnosis on pregnant woman peripheral blood fetus chromosome aneuploid based on the Ion ProtonTM sequencing platform, the diagnosis result is high in accuracy rate and is safe and economic, and the birth rate of chromosome aneuploid fetuses can be effectively controlled.
Owner:BOAO BIOLOGICAL CO LTD

Advanced pre-splitting method for lump coal mining

The invention discloses an advanced pre-splitting method for lump coal mining. The method with carbon dioxide pre-splitting and hydraulic fracturing combined is adopted, advanced pre-splitting of a working face is carried out on a coal layer needing mining in a multi-segmental mode from near to far in the advancing direction of the coal layer working face. The advanced pre-splitting method for every segment comprises the first step of hole drilling, wherein pre-splitting drill holes are drilled in the current pre-split segment; the second step of carbon dioxide pre-splitting, wherein a carbon dioxide pre-splitting device is installed in each drilled pre-splitting drill hole, the drill holes are sealed, and then pre-splitting is initiated; the third step of installation water injection pipes, wherein each pre-splitting drill hole is internally provided with one high pressure water injection pipe, and the holes are sealed; the fourth step of hydraulic fracturing, wherein water is injected into the pre-splitting drill holes through the high pressure water injection pipes to carry out hydraulic fracturing. According to the method, steps are simple, design is reasonable, the method is easy to implement and good in use effect, the problems that an existing deep hole blasting pre-splitting method is not safe, serious in pollution, high in investment cost, poor in use effect and the like are effectively solved, and the lump coal rate of a fully mechanized coal mining face is improved effectively.
Owner:XIAN UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products