The invention relates to a construction method of a
walling and filling combined gob-side entry
retaining wall body. The construction method comprises the following steps of: closely following forward propulsion of a stope face, erecting dense single supports at a gob retaining side at the rear part of a fully mechanized mining bracket, so that a space of a tunnel at the rear part of the stope face is retained;
walling a square template wall with concrete
pier blocks under the
mask of the dense single props; meanwhile, installing counter-pulled anchor rods which penetrate through the template wall bodies, and carrying out lateral reinforcing on the template wall bodies; carrying out grouting filling on a hollow part defined by the template walls through injected holes reserved on the template walls till the internal spaces of the template walls are filled with
grout; carrying out uniform whitewashing treatment on the wall at one side of a gob retaining tunnel to form a concrete spray layer; and sequentially circulating the steps along with propulsion of the stope face till construction of the whole gob-side entry
retaining wall body is finished. According to the construction method disclosed by the invention, a
brickwork wall and a filling support are combined together, so that the construction method is simple and convenient and simple to operate and ensures that the wall body has high strength and can
yield pressure suitably; and length of each
walling of the wall body is consistent with the everyday propulsion degree of the stope face, and the construction method is flexibly suitable for actual mining.