The invention discloses a casing multi-
branch well construction process which comprises the following steps: drilling a No.1
branch well hole, putting a conventional sand control
pipe column into the No.1
branch well hole, and carrying out gravel filling operation; a hollow whipstock casing windowing
system is downwards arranged on the upper portion of the first branch well hole, after the hollow whipstock casing windowing
system is downwards arranged in place for orientation, pressure is applied and stabilized in the
pipe, anchoring is completed, and
pilot hole drilling operation is conducted; 2, a branch well hole is drilled according to a conventional
well drilling mode, a branch well gravel packing sand control
pipe column is put down, a foam
metal sand control screen pipe is arranged on the upper portion of a
window opening, and gravel packing operation is carried out; a hollow whipstock casing windowing
system is put down on the upper portion of the second branch well hole, anchoring and third well hole drilling are completed, a branch well gravel packing sand prevention pipe column is put down, and gravel packing operation is carried out; and finally, the main borehole operation is completed according to the branch borehole operation steps. Sand prevention and production operation of the main and branch boreholes are achieved at the same time, mechanical supporting is achieved at windows of the main and branch boreholes, the production life of the boreholes is prolonged, and the single-well
recovery efficiency is improved.