Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

501results about "Dry-docks" patented technology

Ship lock floating bollard embedded part supporting device and construction method thereof

The invention provides a ship lock floating bollard embedded part supporting device and a construction method thereof.The ship lock floating bollard embedded part supporting device comprises symmetrically-arranged pre-embedded formworks, guide grooves are formed in the inward opposite sides of the pre-embedded formworks, arc parts are arranged on one sides of the guide grooves, formwork outer edges are arranged on the outer sides of the arc parts, and a detachable supporting tool is arranged between the guide grooves; the supporting tool comprises a tool support, the tool support comprises a main body part, a tightening part is arranged on one side of the main body part, an inner blocking assembly is arranged on the other side of the main body part, a plurality of telescopic tensioning assemblies are arranged on one side of the tightening part, and a plurality of telescopic supporting block frames are symmetrically arranged on the two sides of the main body part. According to the supporting device for the ship lock floating bollard embedded part, safety and controllability of the construction process are achieved through automatic supporting force adjustment and a remote monitoring system, potential safety hazards caused by frequent manual intervention are avoided, the working efficiency is improved, and the problem that a traditional supporting device for the ship lock floating bollard embedded part needs manual adjustment and demolding is solved.
Owner:CCCC SHEC FOURTH ENG +3

Ship lock structure safety dynamic monitoring model and intelligent early warning method and system

The invention discloses a ship lock structure safety dynamic monitoring model and an intelligent early warning method and system.The method is used for monitoring safety dynamic study and judgment in the service process of a ship lock structure, and firstly, effective deformation statistical parameters capable of reasonably reflecting the real working properties of the ship lock structure are obtained based on an original deformation monitoring data interpretation algorithm; performing inversion calculation on the effective deformation statistical parameters by adopting a ship lock structural mechanical parameter dynamic inverse analysis numerical algorithm to obtain important mechanical parameters influencing the safety of the ship lock structure, and finally further calculating the stability safety coefficient of the structure as a quantitative index for evaluating the safety of the structure. Dynamic evaluation on the safety of the ship lock structure is a key problem to be solved in the project research.
Owner:盐城市港航事业发展中心 +1

Prefabricated UHPC (Ultra High Performance Concrete) surface protection structure for water delivery gallery of ship lock and construction method

The invention provides a ship lock water delivery gallery prefabricated UHPC surface protection structure and a construction method, and the structure comprises a gallery bottom wall surface protection structure which is located at the bottom wall of a water delivery gallery and is a cast-in-place UHPC concrete structure; the two gallery side wall surface protecting structures are arranged on the two side wall surfaces of the water conveying gallery correspondingly, and each gallery side wall surface protecting structure is composed of a plurality of prefabricated UHPC side plates; the gallery top wall surface protecting structure is located on the top wall of the water conveying gallery and composed of a plurality of prefabricated UHPC top plates, and the prefabricated UHPC top plates are erected above the two gallery side wall surface protecting structures. The UHPC prefabricated plate is used as the inner surface of the water delivery gallery by utilizing the characteristics of high durability, high mechanical property and good impact and wear resistance of the UHPC material, so that the structural durability of the water delivery gallery of the ship lock is greatly improved, the UHPC is used for protecting the water delivery gallery instead of impact and wear resistant concrete, the volume of the UHPC is about one twentieth of that of the impact and wear resistant concrete, and the service life of the water delivery gallery is prolonged. And the cost is about one fifth of that of anti-impact and wear-resistant concrete.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD +1

Cascade ship lock combined scheduling method and system based on multi-basin input factors

The invention relates to the technical field of ship lock combined scheduling, and discloses a cascade ship lock combined scheduling method and system based on multi-basin input factors, and the method comprises the steps: obtaining a plurality of sub-basins with independent hydrological responses based on the hydrological flow information of basin units, and calculating the flow information of the sub-basins; performing calculation to obtain uplink and downlink flow imbalance of the sub-basins, collecting ship operation data and ship lock information of the step ship locks, and constructing a multi-basin input factor; and constructing a combined scheduling strategy based on the multi-basin input factors, performing combined scheduling on the cascade ship locks in different sub-basins, and generating scheduling actions of the cascade ship locks. According to the method, the ship operation data, the ship lock state information and the uplink and downlink flow imbalance of the cascade ship locks are combined, organic fusion of hydrological information and the shipping state is achieved, the cascade ship locks in different sub-basins can cooperatively decide scheduling actions, and the response ability and the regulation and control efficiency of the cascade ship locks to multi-basin complex changes are improved.
Owner:CHANGSHA JIAOTONG LOGISTICS CO LTD +1

Material placing system and construction method for concrete pouring on high surface of ship lock

The present invention relates to the technical field of ship lock concrete construction, and in particular to a material placing system and construction method for concrete pouring on a high surface of a ship lock. According to the present invention, a feeding belt conveyor is arranged in a line direction of the ship lock and used for conveying concrete materials from a bottom end to a high end, and then by means of a bidirectional telescopic material placing machine which is transversely arranged, the concrete materials are transversely conveyed to the side wall of the ship lock for concrete pouring; the pouring height is adjustable; the transverse extension and retraction length is adjustable, and the bidirectional telescopic material placing machine can extend and retract along the left side and the right side in the transverse direction; and the pouring range is large, and the construction efficiency is high.
Owner:THE THIRD ENG CO LTD OF CCCC FOURTH HARBOR ENG +1

Ship lock multi-stage protection structure

The utility model relates to the technical field of ship lock protection, in particular to a ship lock multistage protection structure which comprises a ship lock chamber inner wall, a first sliding groove is formed in the ship lock chamber inner wall, a sliding block is connected in the first sliding groove in a sliding mode, a plurality of idler wheels are arranged on the two sides of the sliding block, and the outer walls of the idler wheels make contact with the inner wall of the first sliding groove. The side wall of the sliding block extends out of the first sliding groove to be fixedly connected with a fixing plate, the side wall of the fixing plate is provided with a protection mechanism used for protecting the inner wall of the lock chamber of the ship lock, and the protection mechanism comprises anti-collision air bags fixedly connected to the top and the bottom of one side of the fixing plate. Compared with the prior art, multi-stage protection is achieved, strong protection capacity is provided for the inner wall of the lock chamber of the ship lock together, the structures can effectively absorb and disperse impact force when a ship collides with or rubs the inner wall of the lock chamber of the ship lock, and therefore damage to the inner wall of the lock chamber of the ship lock is remarkably reduced, and use is convenient.
Owner:泰兴市水务局过船闸管理所

Lifting type lock head water retaining system suitable for rapid change of water level

A lifting type lock head water retaining system suitable for rapid water level change mainly comprises a working door, an access door, a working door groove, an access door groove and the like. The working door comprises a working gate which is arranged in the working door groove, and the upper end of the working gate ascends and descends through a lifting device; locking devices are arranged on the left side and the right side of the working gate, a plurality of sets of water retaining locking grooves are formed in the corresponding working gate grooves at intervals in the height direction, and the locking devices and the corresponding water retaining locking grooves are locked or unlocked. The access door comprises a plurality of sections of access stop log doors arranged in the access door groove, and the access stop log doors ascend and descend through an access door hoist; the working gate groove extends downwards by a certain depth along the bottom of the channel, and when the working gate is adjusted to the highest position from the lowest position, the bottom of the working gate is always lower than the bottom of the channel. According to the lifting type lock head water retaining system suitable for rapid change of the water level, the water retaining height is convenient and rapid to adjust, overhaul and maintenance are convenient, and the automation degree is high.
Owner:THREE GORNAVIGATION AUTHORITY +1

A method for calculating the opening and closing torque of a triangular gate with a small opening for forward water delivery

The invention discloses a method for calculating the opening and closing moment of a triangular gate for forward water delivery and a small-opening gate gap, including confirming that the incoming flow direction is forward water delivery; determining the flooding depth of the triangular gate; determining the water level difference on both sides of the triangular gate; determining the opening of the triangular gate, etc. The invention proposes a new calculation method for the opening and closing moment of a triangular gate for forward water delivery and a small-opening gate gap, and uses the three parameters of the flooding depth of the triangular gate, the water level difference on both sides of the triangular gate, and the opening of the triangular gate to accurately obtain the opening and closing moment of the triangular gate for forward water delivery and small-opening gate gap water delivery. The calculation method is accurate and simple, and can truly and accurately reflect the force characteristics of the triangular gate body opening and closing under the condition of hydrodynamic load. The invention can be applied to triangular gates with different gate widths, and is convenient for engineering designers to quickly judge the opening and closing moment of the triangular gate.
Owner:NANJING HYDRAULIC RES INST +1

Cofferdam for ship lock transformation and construction method

The invention relates to the technical field of water conservancy projects, in particular to a cofferdam for ship lock transformation and a construction method. A cofferdam for ship lock transformation comprises concrete cofferdam bodies and hollow concrete supporting structures, the concrete cofferdam bodies are tightly attached to the wall faces on the two sides of a ship lock and extend in the water flow direction, and the hollow concrete supporting structures are arranged between every two adjacent concrete cofferdam bodies. The hollow concrete supporting structure is fixedly connected with the concrete cofferdam body through a connecting device, the hollow concrete supporting structure comprises a bottom layer, a hollow layer and a top layer, a plurality of rows of cavities arranged side by side are formed in the hollow layer, and blasting devices are pre-buried in the concrete wall between every two adjacent cavities at equal intervals. The concrete cofferdam body is tightly attached to the wall face of the ship lock, a stable water retaining barrier can be formed, the self weight can be reduced through the design of the hollow layer, and compared with traditional mechanical or manual dismantling, efficient and controllable dismantling can be achieved through the blasting device embedded in the supporting structure, and the construction period can be greatly shortened.
Owner:HUNAN AVIATION ENG CO LTD

Hoist opening degree stroke data processing method and system

The invention relates to the technical field of hydraulic engineering control, and discloses a hoist opening degree stroke data processing method and system.The hoist opening degree stroke data processing method comprises the steps that in the valve closing process, two sets of real-time data of motor loads and valve displacement are continuously obtained; when continuous lifting exceeding background noise appears in the motor load data for the first time, marking the moment as an initial contact point; starting from the initial contact point, recording two groups of real-time data of motor load and valve displacement at a preset sampling frequency, and calculating a resistance change rate = delta load / delta displacement; the resistance change rate and a preset collision threshold value are compared to control opening and closing, motor load and valve displacement data are monitored in real time, and the resistance change rate is calculated, so that in the valve closing process, the contact point of the valve and a water seal or a foreign matter is accurately recognized, flexible compression and rigid collision are effectively distinguished according to the change trend of the resistance change rate, and the safety of the valve is improved. Misjudgment is avoided, and the safety and reliability of operation of the hoist are improved.
Owner:NANJING SURUN TECH DEV CO LTD

Construction method of water-saving ship lock

The invention relates to the technical field of hydraulic engineering, in particular to a construction method of a water-saving ship lock, comprising the following steps: S1, excavating a foundation pit at the position of the water-saving ship lock, and building a cofferdam at the upstream of the foundation pit to form a dry construction area in the foundation pit; s2, the bottom face of the foundation pit is excavated to form a lock chamber, mountain bodies on the two sides of the foundation pit are excavated, and excavated sections are leveled to form mountain body side slopes; s3, gate walls are poured on the two sides of the gate chamber, a side slope lining is formed on the mountain side slope in a pouring mode, a bottom face lining is formed on the bottom face of the foundation pit between the mountain side slope and the adjacent gate walls in a pouring mode, and a water retaining dam and a retaining wall are poured on the upstream and the downstream of the gate walls correspondingly; and the lock wall, the side slope lining, the water retaining dam and the retaining wall form side walls of the water-saving pool. According to the water-saving pool and the lock chamber, the original space between canyon mountains is utilized as much as possible, the ship lock construction range can be formed only through slight excavation, the construction amount and the construction cost are reduced, the construction period is shortened, and the construction efficiency is improved.
Owner:THE THIRD ENG CO LTD OF CCCC FOURTH HARBOR ENG +1

Dynamic loading friction braking energy dissipation ship lock anti-collision device and method

The invention provides a dynamic loading friction braking energy dissipation ship lock anti-collision device and method. The device comprises a lifting mechanism, a braking mechanism, an arresting mechanism and a steering mechanism. The lifting mechanism comprises a motor, a transmission mechanism, a winding drum and a steel wire rope wound on the winding drum, and the blocking mechanism is moved to a preset height through the steel wire rope for blocking; the blocking mechanism comprises a lower end steel wire rope and an upper end steel wire rope which are arranged on the steering mechanism in parallel in the vertical direction. The steering mechanism is used for guiding the steel wire rope of the lifting mechanism in the vertical direction into the lower end steel wire rope and the upper end steel wire rope of the parallel blocking mechanism; the brake mechanism comprises a brake disc arranged on the winding drum and brake disc brakes installed on the two sides of the brake disc. The technical problems that in the prior art, an anti-collision device is complex in structure, redundant in arrangement, insufficient in blocking performance and the like can be solved.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD

Cofferdam for ship lock reconstruction and construction method

The present invention relates to the technical field of water conservancy engineering, and specifically to a cofferdam for ship lock reconstruction and a construction method. A cofferdam for ship lock reconstruction comprises a concrete cofferdam body and a hollow concrete support structure. The concrete cofferdam body is closely attached to the walls on both sides of the ship lock and extends along the direction of water flow. The hollow concrete support structure is arranged between two adjacent concrete cofferdam bodies. The hollow concrete support structure is fixedly connected to the concrete cofferdam body by a connecting device. The hollow concrete support structure comprises a bottom layer, a hollow layer, and a top layer. Multiple rows of cavities arranged in parallel are formed inside the hollow layer. Blasting devices are equidistantly embedded in the concrete wall between two adjacent cavities. This application forms a stable water retaining barrier by placing the concrete cofferdam body close to the ship lock wall. The hollow layer design can reduce its own weight. In addition, the blasting device embedded in the support structure can achieve efficient and controllable demolition compared to traditional mechanical or manual demolition, which can greatly shorten the construction period.
Owner:HUNAN AVIATION ENG CO LTD

Steel formwork for water outlet of water delivery gallery of ship lock

The utility model relates to the technical field of water conservancy projects, in particular to a steel formwork for a water outlet of a water delivery gallery of a ship lock. The steel formwork comprises a first steel formwork body, a second steel formwork body and a supporting plate, and the supporting plate is detachably arranged between the first steel formwork body and the second steel formwork body. When the water outlet of the ship lock water delivery gallery is poured, the supporting plate is fixed between the first steel formwork and the second steel formwork. And when the water outlet of the ship lock water delivery gallery is poured, the supporting plate is separated from the position between the first steel formwork and the second steel formwork, so that the first steel formwork and the second steel formwork are detached. According to the technical scheme, the problem that demolding is difficult in the prior art can be solved.
Owner:CANGZHOU SHENGSHIWEIYE MECHANICAL EQUIP MFG CO LTD

A ship lock gate anti-collision device and anti-collision method

The present invention relates to a ship lock gate anti-collision device and an anti-collision method. The anti-collision device includes an energy dissipation counterweight assembly, a floating drum frame, a double-drum winch, and a blocking cable; the energy dissipation counterweight assembly includes a first-stage energy dissipation counterweight, a connecting chain, a second-stage energy dissipation counterweight, and a lifting chain; the double-drum winches are symmetrically distributed on the top of the lock walls on both sides of the ship lock, and include a motor, a block brake, a blocking cable open pinion and shaft, a blocking cable open gear, a blocking cable drum and shaft, a jaw clutch, a counterweight open pinion and shaft, a counterweight open gear, a counterweight drum and shaft, and a drum ratchet lock assembly for unidirectionally locking the counterweight drum and shaft; the blocking cable includes a blocking cable that spans the ship lock chamber and connects the double-drum winches on both sides of the chamber; the floating drum frame includes a floating drum, a frame, and a steering shaft. Compared with the prior art, the structure of the present invention is simpler, and the installation and transformation of the whole set of devices on one side can be realized in a ship lock chamber well groove, saving space.
Owner:GUANGXI XIJIANG DEV & INVESTMENT GRP CO LTD CHANGZHOU THIRD-LINE FOURTH-LINE SHIP LOCK MANAGEMENT OFFICE

Ship berthing device

The utility model belongs to the technical field of ship docking, and discloses a ship docking device. The ship berthing device is used for berthing a ship on a wharf, and a bollard is arranged on the wharf. The ship berthing device comprises an extension piece, a swing piece and a mooring rope. An opening piece is arranged at the end, close to a bollard, of the extension piece. The swing part is arranged at the opening position of the opening part, the swing part and the opening part can define a containing space, and the containing space can contain a bollard; one end of the swinging piece is connected with a cable, and the other end of the cable is connected with a ship; when the bollard is located in the containing space, the extending piece is pulled in the direction close to the ship, and the bollard can drive the end, connected with the mooring rope, of the swing piece to swing in the direction close to the wharf and break away from the opening piece so that the mooring rope can pull the ship to the berthing position. Even if no worker is arranged on a wharf, sailors can take cables by using the ship docking device, so that the ship docking work is completed, and the operation is simple and convenient.
Owner:GUANGZHOU SALVAGE BUREAU

Water delivery door positioning structure for water conservancy ship lock

The utility model relates to the technical field of water conservancy ship locks, and discloses a water delivery door positioning structure for a water conservancy ship lock, which comprises a water delivery door body and a remote controller, and a drainage mechanism is arranged in the water delivery door body. According to the water delivery door positioning structure for the water conservancy ship lock, by arranging the drainage mechanism, when water needs to be drained to raise the ship water level, information is sent to the controller through a remote controller, the controller enables an electric hydraulic telescopic rod to contract, a water blocking plate ascends along a sliding groove, water flow on the side with the high water level enters a filter screen, and impurities are filtered by the filter screen; the anti-collision rod prevents heavy objects from smashing the filter screen, water flow enters the straight pipe from the bent pipe and passes through the two hydroelectric generators, the two hydroelectric generators generate electric power and then transmit the electric power to the outside through wires to store the electric power, and after the water level rises, the water blocking plate moves downwards to be clamped in the clamping groove through the electric hydraulic telescopic rod. And environment-friendly power generation is achieved by facilitating water resource power generation.
Owner:SHAOGUAN CITY ZHONGGANG MASCH & EQUIP CO LTD

Dry dock entrance structure with dock gate leakage test function and construction method

The invention relates to a dry dock entrance structure with a dock gate leakage test function and a construction method, and belongs to the technical field of large component prefabricated dry docks. According to the scheme, a cofferdam area is arranged, after a dock gate and a dock entrance are connected and matched with each other, water is injected into the cofferdam area through a water pump, and after the water surface height is flush with the top surface height of the dock entrance, the cofferdam area is closed; a leakage test experiment is carried out on the connection cooperation relation between the dock gate and the dock entrance, and the problem that a traditional construction mode cannot carry out the leakage test experiment on the cooperation relation between the dock gate and the dock entrance in advance is solved.
Owner:GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD

Air energy storage type water-saving ship lock and control method thereof

The invention provides an air energy storage type water-saving ship lock and a water supply control method thereof.The air energy storage type water-saving ship lock comprises a ship lock body structure and a water-saving pool structure arranged on the side edge of the ship lock body structure, and the water-saving pool structure comprises a pool body, a compression cover, an air energy supply assembly, a transmission assembly and a water conveying assembly; when the compression cover is in an ascending state, the air energy supply assembly drives the transmission assembly to drive the compression cover to move downwards along the inner wall of the tank body, and therefore water in the tank body is driven to enter the lock chamber through the water conveying assembly and the first transverse water conveying gallery for water replenishing; water in the lock chamber enters the pool body through the first transverse water conveying gallery and the water conveying assembly. Compared with an existing water-saving ship lock, the water consumption can be greatly reduced, water diversion from an external new reservoir is not needed, new water source reservoir and water diversion system projects are greatly reduced, and the project cost is greatly saved.
Owner:HUNAN PROVINCIAL WATER TRANSPORTATION CONSTR & INVESTMENT GRP CO LTD +2

Ship lifting method considering rainfall and equipment-saving small ship lifting device thereof

The invention discloses a rainfall-considered ship lifting method and equipment-saving small ship lifting device thereof, which comprises the following steps: acquiring current water level difference data in real time by monitoring the water level difference before and after a lower gate; when the water level difference before and after the lower gate is zero, the lower gate is taken out of the lower gate reservoir and moved to the gate reservoir; taking out the lower gate of the gate chamber and moving the lower gate to the lower gate chamber until the ship enters the front of the upper gate; the current water level difference data is obtained in real time by monitoring the water level difference before and after the upper gate. According to the ship lifting method considering rainfall and the equipment-saving small ship lifting device of the ship lifting method considering rainfall, an effective way for intercepting the contradiction between the riverway and the navigation of the riverway in riverway treatment and landscape engineering is achieved, and meanwhile an important means for achieving economic benefits and environmental protection in hydraulic engineering construction is achieved; resources are saved to the maximum extent, the cost is reduced, the operation process is simplified, and therefore the actual requirements of modern water conservancy project construction are met, and the method has far-reaching influences on sustainable development of water conservancy projects in China.
Owner:GUIZHOU SURVEY & DESIGN RES INST FOR WATER RESOURCES & HYDROPOWER

Anti-silting device for ship lock in river channel and using method of anti-silting device

The invention relates to the technical field of self-flow dredging at the bottom of a ship lock, and particularly discloses a river channel ship lock anti-silting device and a using method thereof.The river channel ship lock anti-silting device is characterized in that a lock chamber is formed between an upstream gate and a downstream gate, communicating vessels are arranged at the bottoms of the upstream gate and the downstream gate, and a plurality of communicating vessel turbulent flow mechanisms are arranged between channels of the communicating vessels and an upstream channel; the communicating vessel turbulent flow mechanism is provided with a pipeline for connecting the channel and the upstream channel; a plurality of lock chamber turbulent flow mechanisms are mounted at the bottom of the lock chamber at the outlet of the channel of the communicating vessel, each lock chamber turbulent flow mechanism is provided with a turbulent flow cylinder and an inclined base, the inclined bases are fixedly mounted at the bottom of the lock chamber, the turbulent flow cylinders are fixedly mounted on the inclined bases, and the turbulent flow cylinders discharge water entering from the channel of the communicating vessel into the lock chamber; the turbulent flow structure of the lock chamber and the turbulent flow structure of the communicating vessel are adopted, sediment deposition at the bottom of the lock chamber and the bottom of the communicating vessel is avoided, the service life of the communicating vessel is prolonged, the maintenance cost of the communicating vessel and the lock chamber is reduced, and the navigation efficiency of a channel ship is improved.
Owner:济宁市港航事业发展中心

Synchronous rapid construction method for concurrent construction of navigation lock and water gate in curved channel

PCT designated stage expiredWO2024250808A1Barrages/weirsDry-docksDry seasonRiver routing
Provided in the present invention is a synchronous rapid construction method for concurrent construction of a navigation lock and a water gate in a curved channel. The synchronous rapid construction method comprises the following steps: S1, at the end of the wet season, excavating an open diversion ditch, synchronously excavating a foundation pit for a navigation lock which is not on a natural channel, and constructing the navigation lock; S2, constructing a steel trestle bridge for transportation; S3, in the early stage of the dry season, closing the natural channel by using an earth-rockfill cofferdam upstream of the water gate and an earth-rockfill cofferdam downstream of the water gate, and using the open diversion ditch for the travelling of water; S4, rapidly constructing the water gate on the closed natural channel, wherein the water gate is built close to two side portions of the natural channel; S5, before the next year's flood season, breaching the earth-rockfill cofferdam upstream of the water gate and the earth-rockfill cofferdam downstream of the water gate in the natural channel, and using the natural channel for passing through the flood season; and S6, after the flood season, restoring the earth-rockfill cofferdam upstream of the water gate on the natural channel, reusing the open diversion ditch for the travelling of water, and continuing to construct the water gate at the same time. The method of the present invention is ingenious and can reduce, from multiple aspects, the influence on construction caused by a water flow experiencing a sudden weather change and the flood season, thereby improving the overall construction efficiency.
Owner:THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD +2

Crack control system and method for ship lock formed by pouring gold-clad silver concrete

PendingCN119531368AReal-time monitoring of concentration changesImprove timelinessArtificial islandsGeometric CADMarine engineeringControl system
The invention provides a crack control system and method for a ship lock formed by pouring gold-clad silver concrete, and is suitable for the technical field of ship lock construction. The crack control system comprises a monitoring module, a data processing module, a display module and an alarm module, precise monitoring and crack control early warning of chloride ion diffusion of the ship lock component are achieved, the timeliness and pertinence of structure maintenance are effectively improved, a crack control method is further provided based on the crack control system, and the crack control system is suitable for popularization and application. Comprising the steps of designing a ladder-shaped inner and outer layer concrete interface, arranging a steel wire mesh, arranging a chloride ion diffusion monitoring sensor, pouring inner layer concrete, spreading a magnetic self-healing capsule, pouring outer layer concrete and maintaining seawater erosion. And a high-strength and corrosion-resistant steel wire mesh is arranged on the interface to control the generation of cracks, and the cracks are actively repaired by actively controlling the fracture of the magnetic self-healing capsule.
Owner:CCCC FOURTH HARBOR ENG CO LTD

Double-line ship lock mutual charging and mutual discharging method for improving water saving rate and double-line ship lock

The invention belongs to the field of water transportation engineering, and particularly provides a double-line ship lock mutual charging and mutual discharging method for improving the water saving rate, which comprises the following steps that two adjacent line ship locks are respectively a downlink ship lock and an uplink ship lock, and double-line synchronous gate entering is carried out; water in the lock chamber of the downstream ship lock is discharged to the lock chamber of the upstream ship lock until the water level of the lock chamber of the downstream ship lock is flush with the downstream approach channel, and at the moment, the water level of the lock chamber of the upstream ship lock is flush with the water level of the upstream approach channel; double-wire synchronous gate-out is carried out; after the lockage is completed, the double-wire function is automatically switched; and the new round of ship enters according to the switched route, and the operation is repeated. According to the method, the water-saving rate of the ship lock is further improved on the premise that the structural complexity, the maintenance difficulty and the economic cost are not increased.
Owner:CHINA THREE GORGES PROJECTS DEV CO LTD

Unmanned ship berthing and unberthing device and unberthing wharf

The utility model relates to the technical field of ships, in particular to an unmanned ship berthing and unberthing device and an unberthing wharf. According to the unmanned ship berthing and unberthing device provided by the embodiment of the utility model, the trumpet-shaped opening is formed between the two tail baffle plates when the tail baffle plates are in the opening state, so that the tail baffle plates provide guidance for the unmanned ship when the unmanned ship is driven in, and the tail baffle plates are automatically closed after the unmanned ship enters an area enclosed by the floating body structure; in this way, the unmanned ship is limited in the area defined by the floating body structure, the position of the unmanned ship can be fixed, the unmanned ship is prevented from drifting out of the area defined by the floating body structure, and compared with the prior art, the unmanned ship berthing and unberthing device can relieve limiting of the unmanned ship when the unmanned ship leaves the berthing and limit the unmanned ship when the unmanned ship berths, so that the unmanned ship berthing and unberthing device has the advantages that the unmanned ship berthing and unberthing effects are improved, and the unmanned ship berthing and unberthing effects are improved. And the unmanned ship does not need to be manually fixed at a berth.
Owner:SHANGHAI MERCHANT SHIP DESIGN & RES INST

One-time forming method for work overhaul valve well door groove of ship lock water conveying system

The invention discloses a ship lock water delivery system work overhaul valve well gate groove one-time forming method, and relates to the technical field of inland river ship lock construction. Comprising the following steps: step 1, mounting a working overhaul valve well bottom sill water stop mechanism; step 2, installing a built-in truss embedded part in the work overhaul valve well; 3, well bottom high-slump second-grade low-heat concrete pouring of the work overhaul valve is carried out; 4, a lintel water stop mechanism in the work overhaul valve well is installed; 5, a truss mechanism is installed in the work overhaul valve well; 6, a door groove embedded part of the work overhaul valve well is installed; 7, high-slump second-level low-heat concrete pouring is conducted on the work overhaul valve well and the lock head body; and 8, the step 5 to the step 7 are cycled until the concrete is poured to the designed crest elevation of the lock head. According to the invention, one-step forming of the work overhaul valve well gate groove of the water delivery system is realized, and the problems of narrow internal space of the overhaul valve well, high secondary concrete construction difficulty and low construction efficiency are solved.
Owner:CCCC FIRST HARBOR ENGINEERING CO LTD +1

Multistage ship lock drainage and navigation multiplexing system and operation method thereof

The invention discloses a multi-stage ship lock drainage and navigation multiplexing system and an operation method thereof. The system comprises a first-stage ship lock chamber section located on the upstream, a last-stage ship lock chamber section located on the downstream and a plurality of middle-stage ship lock chamber sections located between the first-stage ship lock chamber section and the last-stage ship lock chamber section. Each stage of ship lock chamber section is composed of a lock chamber bottom plate and ship lock walls arranged on the two sides of the lock chamber bottom plate. A water conveying gallery is arranged in the lock wall of the ship lock, and the middle of the water conveying gallery communicates with a branch gallery arranged in a lock chamber bottom plate through a T-shaped pipe. A plurality of water outlet holes are formed in the tops of the branch galleries; an energy dissipation pier group formed by a plurality of energy dissipation piers is arranged at the water outlet hole in the lock chamber bottom plate; and a flip bucket is arranged at the downstream end of each stage of lock chamber section of the ship lock. According to the multi-stage ship lock collaborative continuous energy dissipation scheme, the effects of improving the space utilization rate, saving the land area and reducing the construction cost are achieved.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD +1

Ship lock U-shaped side wall pouring cooling system and construction method

The invention discloses a ship lock U-shaped side wall pouring cooling system and an arrangement method.The cooling system comprises a lock chamber and two layers of cooling water pipes arranged on a lock head bottom plate, the two layers of cooling water pipes are oppositely and perpendicularly arranged, a layer of cooling water pipe is arranged at the chamfer position of a lock chamber wall and arranged to be a single loop, and the lock chamber wall is provided with two layers of vertical cooling water pipes; the cooling water pipe on the soil facing side does not need to be disconnected at the position of the floating bollard and is arranged to be a single loop, the cooling water pipe on the water facing side is disconnected at the position of the floating bollard and is arranged to be a double loop, and both inlets and outlets of the cooling water pipes adopt two-way water stop valves. The construction method comprises the steps of concrete pouring, concrete vibrating and cooling water pipe arrangement. By optimizing the mix proportion design of the mass concrete and adding the efficient anti-crack composite material, a scientific basis is provided for adjusting internal temperature control measures of the concrete, the internal temperature of the mass concrete can be dynamically monitored in real time, a cooling water circulation system is adjusted, and concrete cracks can be effectively reduced.
Owner:CCCC SHEC FOURTH ENG +1

A detachable ship lock chamber structure and method

PendingCN122215336AArtificial islandsDry-docks
The application discloses a detachable ship lock chamber structure in the field of ship locks, which comprises a bearing assembly arranged on a foundation to bear vertical water pressure in a lock chamber and prevent water in the lock chamber from penetrating into the foundation, a side bearing assembly arranged on both sides of the bearing assembly to bear horizontal water pressure in the lock chamber and prevent water in the lock chamber from flowing out from the side, and a side wall supporting assembly detachably arranged on the side bearing assembly through a pin shaft structure, and a method for expansion; the application has the beneficial effects that the side wall supporting assembly is connected with the side wall supporting assembly through the mortise and tenon structure, the side wall supporting assembly is more modular, the side wall supporting assembly is more conducive to expansion of an existing lock chamber, the expansion efficiency is higher, and the influence on navigation is smaller.
Owner:GUANGXI UNIV

A ship lock prefabricated UHPC facing structure and a construction method thereof

The application provides a ship lock prefabricated UHPC facing structure and a construction method. The ship lock prefabricated UHPC facing structure is assembled by a plurality of UHPC plate standard parts. The upper and lower ends of the UHPC plate standard parts are respectively provided with corresponding grooves and protrusions, which are used for vertical butt joint of the UHPC plate standard parts. The back surface of the UHPC plate standard part is symmetrically provided with two groups of connecting pieces distributed at the upper and lower edges, which are used for fixing the vertical butt joint of the UHPC plate standard parts. The back surface of the UHPC plate standard part is further provided with a plurality of anchor bars used for combination with cast-in-place concrete. By using the characteristics of high strength and corrosion resistance of UHPC concrete, the UHPC prefabricated plate is used for ship lock vertical concrete protection, which can greatly improve the resistance to ship impact and rubbing capacity and structural durability. In addition, the cost of the UHPC prefabricated plate is at least half of that of the steel plate facing, and the protection area of the UHPC prefabricated plate is larger than that of the steel guardwood protection, and the protection effect is ideal. Meanwhile, during the construction of the ship lock, the UHPC prefabricated plate can be used as a formwork at the same time, thereby reducing the amount of formwork, and the formwork does not need to be removed subsequently, and the construction process is simplified.
Owner:CCCC SECOND HARBOR ENGINEERING CO LTD