The present invention relates to the field of floating dock gates, and specifically discloses a method for in-situ dismantling of obsolete and invalid floating dock gates, including: model measurement and scheme formulation, water retaining
system establishment, construction platform preparation, construction environment optimization, horizontal plate dismantling, side plate dismantling, plate transfer and other construction processes. This process is combined with the construction of a water-stopping
system in the dock area to achieve
water pumping in the dock area to form a dry construction environment. The dock gate is pre-
cut in sections according to actual working conditions, and the
cutting design is carried out in the order of horizontal plates, side plates, longitudinal beams and transverse beams. For larger longitudinal beams, the entire floating dock gate is pre-
cut in sections, and the crane is used to lift the
steel plates layer by layer and piece by piece. For smaller longitudinal beams, the crane is used to lift the
steel plates vertically and horizontally, retaining key connection parts to ensure stability, achieving smooth
cutting, transfer and disassembly, avoiding the difficulty and
risk factor of
underwater cutting, and at the same time, the difficulty of lifting the
steel plates layer by layer and piece by piece is relatively low.