Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

6633results about How to "Reduce construction difficulty" patented technology

Construction method of large-span subway station main body by using arched cover method and station main body structure

The invention discloses a construction method of a large-span subway station main body by using an arched cover method and a station main body structure. The construction method comprises the following steps: 1. making first-phase preparations; 2. excavating main body pilot tunnels at the left side and the right side, and carrying out primary support and top beam construction; 3. excavating a middle-part main body pilot tunnel, carrying out primary support and arch buckling construction, and refilling the earthwork; 4. carrying out earthwork excavation on a main body structure in the station, and prestressing force anchor cable construction; 5. carrying out secondary lining construction on the main body structure in the station; and 6. carrying out secondary lining and arch buckling construction on the station main body. The station main body structure comprises the main body structure in the station, a central post, a central plate and a main body arch part, wherein, the main body arch part comprises a middle arch fragment and two side arch fragments respectively arranged in the two side main body pilot tunnels formed by excavation in advance; and the main body arch part comprises a primary support system and a station main body arch buckling secondary lining structure from the outside to the inside. The station main body structure provided by the invention has reasonable design, simple construction steps, convenience in realization, small construction difficulty and rapid construction speed; the subway station formed by the construction method has a stable structure and a good use effect.
Owner:CHINA RAILWAY FIRST GRP CO LTD +1

Movable type fire protection extinguishment method used for electrical power tunnel

The invention discloses a movable type fire protection extinguishment method used for an electrical power tunnel. By means of the method, fire vehicles can be dispatched to corresponding positions when fire protection dangers happen, and fire extinguishers are remotely controlled by a platform or locally started for extinguishment. In order to shorten the time spent on reaching an accident site, vehicle parking points are arranged on the tunnel at certain intervals, and the fire vehicles are placed at the fire vehicle parking points. The method is high in intelligent degree, light in weight, small in size, moderate in manufacturing cost, flexible in configuration, simple in path, low in maintenance cost and capable of completely achieving tasks and purposes of video surveillance, fire protection touring and linked extinguishment in the electric power tunnel. The movable type fire protection extinguishment method solves the problems that existing monitoring devices used for fire protection and extinguishment in the electrical power tunnel are generally monitoring type cameras which can hardly meet the application in the closed and semi-closed environment of the electrical power tunnel and have the insurmountable defects and disadvantages of being short in service life, narrow in monitoring range and high in maintenance cost.
Owner:康威通信技术股份有限公司

Single and double-wall combined steel cofferdam construction method and its single and double-wall combined steel cofferdam

The invention discloses a single-wall and double-wall combined steel cofferdam construction method and a single-wall and double-wall combined steel cofferdam. The single-wall and double-wall combined steel cofferdam construction method includes the following steps: firstly, assembling the bottom segment side plate of the cofferdam at an assembly field; then floating to the position of a pier; after that, injecting concrete into the foot blade and assembling the top segment of cofferdam and the top segment inclined strut; then positioning, cleaning up the pedestal, building a boring platform, installing a steel casing and stacking the sandbags sequentially; after that, injecting bottom seal concrete, and boring the pier for injection; finally, after the pier pedestal is constructed, pumping the water, cutting off the steel casing, chiseling off the laitance at the head of the pier and beginning the construction of a bearing board. The bottom segment side plate of the cofferdam is composed of circular external and internal wall panels, and the top segment side plate of the cofferdam is fixed on the circular external wall panel. The invention has the advantages of fast engineering speed, small construction difficulty and small cost investment, and the top segment side plate can be used repeatedly and is high in recovery rate; the invention overcomes the difficulties at the time of no bottoming concrete thickness; the circular sealing concrete between the bearing board and the cofferdam also has the effect of resisting water.
Owner:THE 5TH ENG MBEC

Method for constructing tunnel by finishing full section curtain grouting from upper-half section

The invention relates to the field of tunnel construction, in particular to a method for constructing a tunnel by finishing full section curtain grouting from an upper-half section, which solves the problems of long construction period, difficult construction, high construction safety risk and the like during full section curtain grouting construction of a complex geological section. The method comprises the following steps of: firstly, excavating the upper-half section, and strengthening the support of a tunnel face; secondly, constructing a temporary inverted arch and a grout-stopping wall of the upper-half section; thirdly, excavating the lower-half section in place, and strengthening the support of the tunnel face; fourthly, constructing a grout-stopping wall of the lower-half section; fifthly, forming grouting holes on the upper-half section, wherein the maximum elevation angle alpha is between 25 and 45 degrees, the maximum depression angle beta is between 30 and 70 degrees, andthe longitudinal strengthening length is between 15 and 30 m; sixth, performing grouting operation; seventh, constructing a large-scale lead pipe roof; eighth, excavating a grout-stopping wall; ninth, excavating a tunnel trunk; and finally, continuously cycling by taking an area of 15 to 30 m as a grouting strengthening cycling section to realize the construction of the tunnel by curtain groutingfrom the upper-half section. The method can greatly reduce the construction difficulty, shorten the construction period, and ensure the construction quality, and the construction is safe, quick and economic, so the method can be widely used in the field of tunnel construction.
Owner:2ND ENG CO LTD OF CHINA RAILWAY 12TH BUREAU GRP

Assembly channel steel punching beam column joint connecting device capable of achieving function recovery

InactiveCN106869325AAvoid complex stress fieldsReduce construction difficultyFloorsFloor slabPunching
The invention relates to an assembly channel steel punching beam column joint connecting device capable of achieving function recovery and belongs to the field of structural engineering. The assembly channel steel punching beam column joint connecting device capable of achieving function recovery is composed of a square steel pipe column with a cantilever beam section, a channel steel punching beam section and a connecting device of the cantilever beam section and the channel punch beam section. All welding parts of the joint connection device are all finished in a factory, so that precision and quality of welds are easier to control. Construction speed is greatly increased and construction quality is greatly improved, and a spatial structure of the channel punch beam section of the channel is conducive to pipeline penetration; the channel steel punching beam and a floor can be assembled and molded in the factory to form modular assembly units. Then all the modular assembly unit and the square steel pipe column with the cantilever beam section achieve assembly connection through the channel steel punching beam. Joints of the connection device can be used for both of beam end reinforcing and cover plate connection weakening. A multi-energy dissipation mechanism can be realized, a plastic hinge is transferred to a cover plate and a connecting plate. The function of structures can be recovered only by replacing the connecting plate after an earthquake.
Owner:BEIJING UNIV OF TECH

Corrugated steel webplate combined box girder floor system for cable-stayed bridge and construction method thereof

The invention relates to a corrugated steel webplate combined box girder floor system for a cable-stayed bridge and a construction method thereof, and belongs to the technical field of bridge structures. The corrugated steel webplate combined box girder floor system comprises a precast concrete plank and a cast-in-place concrete seam, wherein the precast concrete plank is positioned on a steel box girder and is integrated with the steel box girder into a whole; the steel box girder is formed by welding a top flange steel plate, a corrugated steel webplate and a steel plate at the bottom of the box girder; a box girder baseplate stiffening rib and a diaphragm plate are welded in the steel box girder; the diaphragm plate comprises a top flange steel plate of the diaphragm plate and a steel webplate of the diaphragm plate; a toggle pin connecting piece is welded on the top flange steel plate and the top flange steel plate of the diaphragm plate; and a steel anchor pulling plate and a steel sleeve are welded on the top flange steel plate. The corrugated steel webplate combined box girder floor system simplifies the manufacturing process for the precast concrete plank, gives full play to the superior mechanical property of the corrugated steel webplate and the release action of the corrugated steel webplate on the creep effect of concrete shrinkage, improves the bearing capacity, stiffness and crack resistance of the structure, and improves the durability of the structure.
Owner:TSINGHUA UNIV

Intelligent entrance guard control system with wireless ad hoc network function and control method thereof

The invention discloses an intelligent entrance guard control system with a wireless ad hoc network function and a control method thereof, which achieve the wireless ad hoc network function and remove difficulty in project wire arrangement. A safety identification module is added in a card reader to improve system safety. An entrance guard system management terminal applies an embedded gateway to manage every entrance guard controller on one hand and exchange information with an entrance guard management server on the other hand. The system adopts the mode of combination of the B / S structure and the C / S structure and is formed by a center server, branch center servers and an intelligent entrance guard controller. A center server database is interlinked with each branch center server database, and the branch center servers start ZigBee protocol stack and conduct data communication with the intelligent entrance guard controller through a ZigBee and / or transmission control protocol (TCP) / Internet protocol (IP) interface. The entrance guard controller is connected with a card reader connected with an encryption module. The swiping card record is uploaded by the intelligent entrance guard controller to corresponding branch center servers and then to the center server.
Owner:SHANDONG UNIV

Construction method for subway contact passage

The invention provides a construction method for a subway contact passage suitable for a very thick Cenozoic stratum region with low heat conductivity and strong heat insulation effect. The method comprises five stages, namely construction preparation, construction of freezing holes, freezing, digging and supporting of the passage and a water collecting well and slurry filling in the back of a wall. The method specifically comprises the following steps of: performing the construction preparation, then forming the freezing holes under the condition that the thickness of a frozen soil curtain is ensured, adding short-range freezing holes on the upper parts of the bell mouths of the freezing holes, and detaching reserved steel pipe sheets at the opening of the passage by adopting a secondary hole forming technology; performing positive freezing after a freezing system runs normally, and making the freezing system perform maintenance freezing after the frozen soil curtain meets the design requirement; after the procedures are finished, performing the digging and supporting stage of the passage and the water collecting well; and pre-burying slurry pipes and filling slurry. By the construction method, the construction difficulty is reduced, the safety and the reliability of engineering are improved, the construction period is shortened, the construction efficiency is improved, and the quality of the engineering is ensured.
Owner:TIANJIN URBAN CONSTR TUNNEL

Adjustable leveling guide rail and leveling method thereof

The invention provides an adjustable leveling guide rail. The adjustable leveling guide rail comprises a guide rail beam and a plurality of supporting pieces, wherein each supporting piece comprises a screw rod and a nut; the screw rod is connected with the guide rail beam through the nut; the end part of the screw rod is provided with a fixing block which is hexagonal, tetragonal or triangular; the fixing block is connected with the screw rod in an integral molding mode or the fixing block is detachably connected with the screw rod; and the supporting piece also comprises a positioning piece connected with the screw rod in a fitting mode. The invention also provides a leveling method for realizing the leveling guide rail, namely, the levelness of the leveling guide rail is adjusted by rotating a leveling nut and a positioning nut. In a construction process, instant leveling is realized by clamping the fixing block, fixing the screw rod and adjusting the levelness of the guide rail by screwing the positioning nut and the adjusting nut respectively. The adjustable leveling guide rail has high leveling accuracy, can realize instant leveling in the construction process and has the advantages of low cost, convenient detachment, easy construction, clean environment, green construction and the like.
Owner:HAOHE ENG & CONSTR

Intelligent tourism integrated service management platform

InactiveCN105608643ARemove barriers to diversityAchieving comprehensive management integrationData processing applicationsResource informationComputer terminal
The invention relates to an intelligent tourism integrated service management platform. A portal layer is used for ensuring that access terminals can perform one-stop access on a management platform; a business resource layer puts local tourist sightseeing conditions into statistics to form integrated intelligent early warning services and provides comprehensive intelligent tourism information services for tourists; a resource information layer adopts cloud platform technologies, processes all data and realizes management and sharing of the data; an application support layer includes a data exchange platform, a GIS service platform and an application service platform; a data analysis layer filters and analyzes obtained data, sends filtered and analyzed data to the terminals in a targeted manner; a standard specification system and an information security system play their roles in the whole intelligent tourism integrated service management platform. With the intelligent tourism integrated service management platform of the invention adopted, comprehensive management fusion of large data volume and diversified data can be realized; a high-performance data processing center system can be provided for intelligent tourism projects; and construction schemes, data filtering methods and technical implementation means can be provided for a data processing module at a bottom layer.
Owner:GUANGXI KINGON SOFTWARE

Support change construction building method implemented by using main structure of building

The invention relates to a support change construction building method implemented by using a main structure of a building, which is characterized in that a foundation pit support is respectively supported on a foundation pit support pile and a beam slab of the main structure of the building by using the two ends of a steel supporting member, one end of the steel supporting member is connected with the structure beam slab through a steel waling and a steel soldier pile, and parts of a post-cast strip, a tunnel opening and a ramp are respectively provided with a steel-structure load-transfer member, thereby achieving a supporting effect on foundation pits; and under the action of supporting, the main structure between the foundation pit support pile and a finished structure is constructed. According to the method disclosed by the invention, the appropriate parts of the post-cast strip, the tunnel opening and the ramp of the structure are respectively provided with a reliable load-transfer member, so that a situation that in the process of support change construction, the main structure of the building is not damaged is ensured, wherein, the post-cast strip is provided with a rebar as the load-transfer member, and the tunnel opening and the ramp are respectively provided with a temporary floor; by using the building method, the safety of the foundation pit support can be effectively ensured, the deformation of the ground and the supporting pile can be effectively controlled, and the difficulty of engineering construction can be reduced; and the building method is rapid in construction progress, low in construction cost and high in engineering quality.
Owner:THE SECOND CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU +3

Extra-huge-volume concrete one-time continuous pouring multi-cycle real-time temperature control construction technology

The invention discloses extra-huge-volume concrete once continuous pouring multi-cycle real-time temperature control construction technology. Flow and flow rate of circulating water is automatically regulated by a concrete internal and external temperature real-time monitoring system. Hydration heat inside concrete is gradually reduced to balance the inside and outside temperature difference of the concrete, effectively prevent temperature difference stress inside and outside the concrete from generating a crack, and ensure that construction quality of "extra-huge-volume concrete" meets design and specification requirements. The extra-huge-volume concrete one-time continuous pouring multi-cycle real-time temperature control construction technology has the advantages of saving a lot of water resources, achieving green construction, and conforming to national energy saving and environmental protection policy orientation due to the fact that three communicated circulating water systems including water in a circulating pipe network, water in an entire storage thermal insulation maintenance pool of a base plate and recharge water come from a foundation pit rainfall and site rainwater collection system.
Owner:中如建工集团有限公司 +1

Construction device and construction method for stirring and spraying expanded reinforcement pile

ActiveCN106087999AIncrease resistance to horizontal thrustIncrease end resistanceBulkheads/pilesDrilling machines and methodsSpray nozzleHigh pressure
The invention provides a construction device and construction method for a stirring and spraying expanded reinforcement pile. The construction device is characterized in that a drill pipe is formed by coaxially overlapping an outer pipe body and an inner pipe body in a sleeving mode and provided with a rotary power mechanism, a lifting device and a variable-diameter telescopic stirring arm; the inner pipe body is provided with a spiral drill bit and a spraying nozzle, and high-pressure ejection, forced stirring, improvement on the drilling speed and adjustment of the specifications of a pile body and an expanded body are realized through the operations of arm folding, arm unfolding, rotating, high-pressure grouting and the like. The construction method is characterized in that the setting parameters and design scheme of the pile body and the expanded body of the reinforcement pile are designed in advance. The method includes the particular construction steps that (1) pile positions are aligned; (2) the expanded body and the pile body of the reinforcement pile are constructed in a mode A (from top to bottom) or mode B (from bottom to top) according to the advanced design; (3) the stirring and spraying expanded reinforcement pile which accords with the advanced design and is provided with the expanded body is formed; and (4) subsequent construction is carried out through multiple methods and includes manufacturing of a reinforcement body pile body and pile end carriers and laying of a cushion layer.
Owner:北京波森特岩土工程有限公司

Supporting method for soft broken nonuniform stratum tunnel construction

The invention discloses a supporting method for soft broken nonuniform stratum tunnel construction. The supporting method includes the steps that firstly, an arch support is erected in a bottom layer tunnel through steel pipes, and the portion, on the top of the arch support, of the bottom layer tunnel is drilled; secondly, a small pipe roof is constructed on the drilled portion of the arch crown of the arch support; thirdly, during construction of the small pipe roof for supporting, advanced reinforcement treatment is conducted on a top arch of the tunnel through advanced small pipes in a floor staggered mode; fourthly, the tunnel is excavated; fifthly, after the tunnel is excavated, preliminary supporting construction is conducted in time each cycle; sixthly, after excavation and supporting of a tunnel trunk of the tunnel, an inverted arch is constructed and sealed into a loop; and then secondary lining following operation is conducted. The method has the advantages that deformation of tunnel surrounding rocks can be effectively reduced, self-stabilization and seepage prevention capacity of the tunnel is permanently improved, a multifunctional surrounding rock reinforcement region is formed, and safety of tunnel constructors and equipment is guaranteed.
Owner:SHANDONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products