Shield tunneling machine split starting construction method

A technology of split origination and construction method, which is applied in earthwork drilling, mining equipment, tunnels, etc., can solve problems such as inoperability, save construction costs, improve construction efficiency, and reduce construction difficulty.

Inactive Publication Date: 2014-04-09
CHINA RAILWAY 13TH BUREAU GRP 6TH ENG COMPANY
View PDF2 Cites 49 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a split-starting construction method of the shield machine, which adopts the method of split-body operation of the shield machine, and solves the problem that the length of the starting operation well of the shield machine is less than the total length of the shield machine and cannot be operated The problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shield tunneling machine split starting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] The present invention will be further described below in conjunction with accompanying drawing:

[0032] As shown in the figure, 1 is the cutter head, 2 is the front shield, 3 is the middle shield, 4 is the back shield, 5 is the connecting bridge, 6 is 1 # Trolley, 7 is 2 # trolley, 8 is gas pipeline, 9 is water pipeline, 10 is wire harness, 11 is 5 # Cable host on the trolley, 12 is 3 # Trolley, 13 is 4 # Trolley, 14 is 5 # Trolley, 15 are hoisting wellheads, and 16 are unearthed mouths.

[0033] Detailed construction method of the present invention is:

[0034] ① Underground cleaning site

[0035] ②The starting base is assembled in the well and the track is laid

[0036] Install the starting bracket before laying the track. After installing the bracket, place the waste segment on it, and then lay two left and right rails of 2080mm and 900mm gauge on the segment according to the center line of the tunnel to the bottom of the portal.

[0037] A winch is installe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a shield tunneling machine split starting construction method and belongs to the technical field of building construction. The method comprises the following steps: (1) cleaning an underground site, (2) starting base seat underground assembling and laying rails, (3) moving a first trolley and a second trolley underground and moving the first trolley and the second trolley backward, (4) moving a duct piece cart underground, (5) moving a connecting bridge and a spiral conveyor underground in a hoisting mode, and moving the connecting bridge and the spiral conveyor backward, (6) moving a starting table underground, smear ing lubricating grease, moving a cutter disk and a shield body underground and locating and assembling the cutter disk and the shield body, (7) assembling, (8) starting trying tunneling, (9) restoring to normal shield tunneling. The method has the advantages of effectively solving the problem that a shield tunneling machine cannot be operated and run normally for being restricted by the actual environment of a shield tunneling staring operation shaft on a construction site, greatly improving construction efficiency, saving construction cost, and reducing construction difficulty.

Description

technical field [0001] The invention belongs to the technical field of building construction. Background technique [0002] At present, shield construction technology has been widely used in transportation, hydropower and other engineering fields. The shield construction section is generally divided into three parts: the starting operation well of the shield machine, the shield section and the shield receiving operation well. According to the total length of the shield machine (80m) and the needs of excavation (well), the origination of the shield machine generally requires an origination shaft length of about 120m. In order to save costs and facilitate construction, one end of a structure such as a station is usually used as the starting working shaft of the shield machine. However, when the length of the building to be used as the starting working shaft of the shield machine is less than the total length of the shield machine, and the construction must be carried out as ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/06
Inventor 李大伟李增良贲林刘晓媛
Owner CHINA RAILWAY 13TH BUREAU GRP 6TH ENG COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products