Construction method for subway contact passage

A communication channel and construction method technology, which is applied in the field of subway construction, can solve problems such as the sealing of water gushing sand and freezing holes, small thermal conductivity, thermal insulation, and frost heaving hazards of tunnel freezing holes, etc., so as to avoid frost heaving Harm, reduce construction difficulty, reduce the effect of construction risk

Inactive Publication Date: 2012-08-01
TIANJIN URBAN CONSTR TUNNEL
View PDF4 Cites 31 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although the construction of the subway has a history of more than 100 years, due to the objective conditions such as the large buried depth of the connecting channel, the complicated geological and hydrological conditions, and the constraints of the tunnel construction site and the surrounding environment, the construction technology content is high and the difficulty is great. Therefore, its construction plan is always difficult to be very satisfactory.
At present, the construction schemes of communication channels at home and abroad are mainly limited to pipe jacking method, mine method, pipe shed method, and mine-like method. During the construction in the thick Cenozoic stratum area, there are problems in the frost heave hazard of the tunnel frozen hole, water and sand gushing, and the sealing of the frozen hole, which affects the overall safety of the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0010] The strata in Tianjin are extremely thick Cenozoic strata with low thermal conductivity and strong thermal insulation effect. The tunnel project between Tucheng and Nanlou shield section of Tianjin Metro Line 1 is constructed using the present invention. The specific steps are as follows:

[0011] (1) Construction preparation

[0012] 1) It is required to supply power to the vicinity of the construction site of the communication channel in advance, and clean up the tunnel and construction site to ensure smooth construction.

[0013] 2) Lay two trips of 2″ water pipes in the tunnel to the construction face of the communication channel for water supply, sewage discharge and water supply and drainage during freezing hole construction. Install a sewage pump and a drainage pump on the construction work face of the communication channel. Install flow 40m in end well 3 / h 1 submersible pump, with a flow rate of 40m installed on the construction face 3 / h sewage pump 1.

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction method for a subway contact passage suitable for a very thick Cenozoic stratum region with low heat conductivity and strong heat insulation effect. The method comprises five stages, namely construction preparation, construction of freezing holes, freezing, digging and supporting of the passage and a water collecting well and slurry filling in the back of a wall. The method specifically comprises the following steps of: performing the construction preparation, then forming the freezing holes under the condition that the thickness of a frozen soil curtain is ensured, adding short-range freezing holes on the upper parts of the bell mouths of the freezing holes, and detaching reserved steel pipe sheets at the opening of the passage by adopting a secondary hole forming technology; performing positive freezing after a freezing system runs normally, and making the freezing system perform maintenance freezing after the frozen soil curtain meets the design requirement; after the procedures are finished, performing the digging and supporting stage of the passage and the water collecting well; and pre-burying slurry pipes and filling slurry. By the construction method, the construction difficulty is reduced, the safety and the reliability of engineering are improved, the construction period is shortened, the construction efficiency is improved, and the quality of the engineering is ensured.

Description

technical field [0001] The invention relates to a subway construction technology, in particular to a subway channel construction method aimed at special geological conditions. Background technique [0002] The communication channel and the pump room are generally located at the lowest part of the tunnel between the two stations. In order to quickly and conveniently evacuate passengers to another section or a safe area in the event of an unexpected safety accident during the operation of the subway train, and to facilitate the accumulation of water in the tunnel collection and discharge. Although the construction of the subway has a history of more than 100 years, due to the objective conditions such as the large buried depth of the connecting channel, the complicated geological and hydrological conditions, and the constraints of the tunnel construction site and the surrounding environment, the construction technology content is high and the difficulty is great. Therefore, i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00
Inventor 季岩涛
Owner TIANJIN URBAN CONSTR TUNNEL
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products