The invention relates to a
shunting route automatic handling method and equipment suitable for a passenger and freight mixed running
station. The method comprises the steps that S101, a CTC
system signs for a
shunting operation
list; s102, automatic handling of
shunting operation is started; s103, the shunting terminal requests shunting
route handling; s104, the CTC
system checks whether space-time conflicts exist between the applied shunting
route and passenger car and freight car
train routes planned to be handled in the stage plan,
station yard trains and shunting routes handled in the
station yard, and interval occupation; s105, the CTC
system automatically transacts the shunting route passing the inspection; and S106, the shunting
machine runs to a station track or a turning point along the shunting route with the open
signal, and the shunting terminal completes the relevant operation of the shunting
machine. Compared with the prior art, the system has the advantages of being high in
automation degree, improving shunting efficiency and the like.