Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

High speed magnetic suspension train travel control system

A technology for maglev train and operation control, applied in the direction of automatic systems, etc., can solve the problems of increased software and hardware relationship, no hot backup system, security loopholes, etc., to achieve reliability and availability improvement, overcome security loopholes, and improve security Effect

Inactive Publication Date: 2007-04-11
BEIJING JIAOTONG UNIV
View PDF0 Cites 42 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0023] 3) The setting and function definition of the partition control computer of the German high-speed maglev train operation control system and its relationship with the partition safety computer are unreasonable. The partition control computer processes data closely related to safety and performs functions closely related to safety. However, the partition security computer is required to implement security checks. From the structural relationship between the partition control computer and the partition security computer, it is not difficult to see that the unreasonable relationship between software and hardware increases the complexity of the software and reduces the security and availability of the system;
[0024] 4) The divisional operation control system of Germany's high-speed maglev train operation control system is the core of the operation control system and the key to the safety of the operation control system. Almost all the information processed by the divisions is closely related to safety. The Shanghai Maglev Demonstration Line The partition control computer is a hot standby non-safety computer. The partition control computer uses a non-safety computer to handle a large number of security-related events. Although the partition security computer has been protected to a certain extent, there are still security holes, which reduces the system security;
[0025] 5) In the on-board operation control system of the high-speed maglev train operation control system in Germany, the safety computer system structure and function of the head car and the tail car do not constitute a real hot backup system. There is only one set in the German system of the Shanghai Maglev Demonstration Line The on-board safety computer system is directly connected to the vehicle-ground wireless communication system. Due to structural limitations, only one on-board safety computer system has complete operation command and safety protection functions, and the other on-board safety computer system only has a small part of safe parking. function, without complete operation command and safety protection functions, and does not constitute a real hot backup system, which reduces the reliability and availability of the system;
[0026] 6) The central operation control system has a safety confirmation function to a certain extent. The central operation control system of the high-speed maglev train operation control system in Germany is composed of non-safety computers, which reduces the safety of the system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High speed magnetic suspension train travel control system
  • High speed magnetic suspension train travel control system
  • High speed magnetic suspension train travel control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0062] The operation control system of the high-speed maglev train realizes the function of "operation command and safety protection" of the high-speed maglev train, and a preferred implementation example of the present invention is provided below. Figure 4 is a diagram of the structure and integration scheme of the high-speed maglev train operation control system, in which the dot-dash line box is the high-speed maglev train operation control system, which is composed of a central system, a partition system, an on-board system, and a wireless communication network connecting the partition and on-board systems .

[0063] Integrating the high-speed maglev train operation control system shown in Figure 4, the present invention:

[0064] 1. The central system as shown in Figure 1 is adopted, which is mainly composed of a traffic command system, a traffic simulation system and a fault diagnosis system:

[0065] Driving simulation system: realize the operation simulation function ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The high speed magnetic suspension train operation control system includes central system in the control center, divisional systems in the stations and transformer stations beside rail, and vehicular systems on trains. The central system includes control system, fault diagnosing system and operation simulating system with safety computer system to raise the safety and the efficiency magnetic suspension train system. The divisional system consists of divisional safety control and managing system, drive control and speed limiting system, switch control system and powering and measuring system, and has modular safety computer. The vehicular system has two independent safety control and speed limiting systems for raised reliability. All the systems are connected via radio or wired communication network.

Description

technical field [0001] The invention relates to an operation control system of a high-speed maglev train, which belongs to the field of rail transit system control. Background technique [0002] The high-speed maglev train system consists of four parts: vehicle system, line system, train propulsion system and operation control system. The high-speed maglev train operation control system is the center of the high-speed maglev train system. The system connects the vehicle system, line system, and train propulsion system to complete the operation command control and safety protection functions of the high-speed maglev train system. [0003] Although Japan's high-speed maglev train system has entered the engineering test stage, and Germany's high-speed maglev train system has reached the level of commercial application, the research work on the high-speed maglev train operation control system and its integration methods is still lagging behind, and is still in the theoretical re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B61L27/04
Inventor 徐洪泽郑伟刘湘黔岳强杨光
Owner BEIJING JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products