Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

148 results about "Layout planning" patented technology

Electromobile charging and exchanging power station stationing and planning system and method

The invention discloses an electromobile charging and exchanging power station stationing and planning system and method. The system and method comprises an electromobile charging and exchanging power station stationing, planning and decision-making management centre, a vehicle-mounted collection terminal and a method for stationing and planning by using the system. The electromobile charging and exchanging power station stationing, planning and decision-making management centre is connected with the vehicle-mounted collection terminal through an electric power private network, the electromobile charging and exchanging power station stationing, planning and decision-making management centre comprises a preposition service device, a data storage device and a layout planning service device, the data storage device comprises a relation data base server and a real-time data base server, and the layout planning service device comprises servers such as a global information system (GIS) server and an area calculation server. The electromobile charging and exchanging power station stationing and planning system and method can effectively prevent newly-built electromobile charging and exchanging power stations from building in the service scope of the existing electromobile charging and exchanging power station, improves feasibility and rationality of an electromobile charging and exchanging power station stationing and planning scheme, improves use ratio, charging ratio and work efficiency of the electromobile charging and exchanging power station.
Owner:SHANDONG LUNENG SOFTWARE TECH

Processor performance optimization method based on clock planning deviation algorithm

The invention discloses a processor performance optimization method based on the clock planning deviation algorithm, which comprises the following steps: the layout planning phase, the layout phase and the follow-up phase, wherein in the layout planning phase, grouping SRAM (static random access memory) according to the path relation between an SRM (shared resource module) preceding-stage or backward-stage register and multiple SRM; clock deviation planning is performed in the layout phase, and the layout phase is divided into two phases, namely before clock tree synthesis and after clock tree synthesis; before clock tree synthesis, SRAM clock delay is adjusted according to the average surplus capacity between SRAM and multiple paths of the preceding-stage or backward-stage register, and planning the clock jitter of the register by adopting the partial surplus capacity borrowing algorithm; after clock tree synthesis, handling a large number and few time sequence violations respectively by adopting the clock tree algorithm correction and the engineering change; in the follow-up phase, to handle the storage time violation after wiring, the restoring scheme based on distributed multi-scenario time sequence analysis, and combining an ECO (engineering change order) and a script is adopted.
Owner:SOUTHEAST UNIV

System and method for generating dynamic form page through visual dragging

The invention provides a system for generating a dynamic form page through visual dragging, and the system comprises a design interface which comprises a component region, a design region and a parameter configuration region: the component region comprises a basic component and a sharing component, and the basic component comprises a layout component, a form component, an interaction component anda display component, wherein the layout component can realize one-row multi-column and multi-layer nested layout, and a plurality of div layers are arranged in one row of a page to display an area; when the multi-layer assembly is nested, the outer-layer assembly is dragged to other areas, and the inner assembly is included together with the outer-layer assembly. A status bar is arranged at the bottom of the design area, each component dragged into the design area is provided with a unique ID attribute, the nesting relation of the components is obtained, the nesting relation is displayed on the status bar, and the component with the ID is directly positioned by clicking a certain component name of the status bar. According to the method, complete free layout is achieved, the method can adapt to any webpage design, and the display effect can be achieved through reasonable layout planning no matter how complex the pages are.
Owner:紫光云技术有限公司

Virtual product switching method for electronic product production line

The invention discloses a virtual product switching method for an electronic product production line. The method comprises the following steps of performing modeling in a simulation platform accordingto layout planning of a main assembly line and a special production platform required for electronic product switching, and building a three-dimensional model library in an upper computer; performingmodularization on the built three-dimensional model library and performing packaging; in combination with the three-dimensional model library, performing unit modularization algorithm solving, wholeline execution and scheduling algorithm, and determining an initial scheme of product switching; quickly rebuilding the three-dimensional model library realized in the upper computer through flexiblescheduling by the special production platform; performing whole line assembly by the three-dimensional model library, performing logic script compilation on the rebuilt three-dimensional model library, and finally performing re-packaging; performing whole line product switching virtual testing of the main assembly line on a test module of the upper computer for the rebuilt three-dimensional modellibrary; and generating a product switching test result, and according to the product switching test result, generating a production line optimization design scheme.
Owner:GUANGDONG UNIV OF TECH

Regional comprehensive energy system layout planning method considering topological characteristic of energy network

ActiveCN110717226AWith topological propertiesSolve the problem that the optimal planning solution cannot be obtainedGeometric CADForecastingLayout planningIntegrated energy system
The invention discloses a regional comprehensive energy system layout planning method considering topological characteristics of an energy network, and belongs to the field of integrated energy systemplanning. The method comprises: providing topological characteristics of the energy network; establishing a topology description model of the regional comprehensive energy system based on the energyflow balance constraint; establishing a regional comprehensive energy system layout planning model by taking minimization of the sum of initial investment construction cost and later operation cost ofenergy stations and energy supply pipelines of the regional comprehensive energy system as a target; using an orthogonal polynomial approximation and piecewise function linearization method to reasonably simplify the planning model, and converting an original problem into a mixed integer quadratic programming problem which is easy to solve; and finally, solving the simplified target function based on a branch and bound method and an interior point method to obtain a comprehensive energy system layout planning scheme. According to the planning method, problems are considered more comprehensively and reasonably, the problem that the physical meaning of a planning target is not clear in an existing planning method is solved, and the solving efficiency is higher.
Owner:STATE GRID ZHEJIANG HANGZHOU XIAOSHAN POWER SUPPLY CO +2

Electric vehicle charging station planning and layout method and system based on analytic hierarchy process

The invention provides an electric vehicle charging station planning and layout method and system based on analytic hierarchy process. The method comprises: employing analytic hierarchy process to screen charging station addresses in a planning area, obtaining candidate station addresses, and enabling a candidate station address set to comprise a plurality of charging station addresses; and constructing an electric vehicle planning model, calculating a capacity constraint and a power grid constraint of the charging station address based on the electric vehicle planning model, and obtaining anautomobile charging station layout plan according to the capacity constraint and the power grid constraint. An analytic hierarchy process is adopted to screen charging station sites; the requirement on data is relatively low; Good feasibility is achieved, Various influence factors such as road traffic, land planning and power distribution network acceptance capacity are comprehensively considered,the purposes of reducing the construction cost and increasing the charging service coverage in electric vehicle charging station planning are achieved, guidance can be provided for urban electric vehicle charging station layout planning, and planning personnel can conveniently make a most reasonable scheme by integrating various factors.
Owner:ZHEJIANG HUAYUN ELECTRIC POWER ENG DESIGN CONSULTATION CO LTD +1

Crop plantation space layout optimization method based on improved Cuckoo algorithm

The invention relates to a crop plantation space layout optimization method based on an intelligent optimization algorithm, in particular to a crop plantation space layout optimization method based onan improved Cuckoo algorithm, and belongs to the field of geographic space layout planning. The method aims at a crop plantation layout optimization problem to redefine an individual coding way, an initial layout scheme generation method and a multi-objective function and constraint condition processing method in the Cuckoo algorithm on the basis of a Cuckoo algorithm framework, a one-to-one mapping relationship of the problem and the Cuckoo algorithm is established, and a cross replacement strategy and a local update strategy, which aim at the space layout, are put forward so as to establishthe information exchange and update mechanism of a Cuckoo individual again to meet crop space layout optimization requirements. Meanwhile, the method is combined with a Pareto multi-objective processing technology, and various candidate schemes can be generated to provide decision support for decision makers. By use of the cross replacement and local update strategy put forward by the invention,the convergence efficiency and the solving accuracy of the algorithm are improved.
Owner:INST OF REMOTE SENSING & DIGITAL EARTH CHINESE ACADEMY OF SCI

Flying area layout planning method for atmospheric environment impact

The invention discloses a flying area layout planning method for the atmospheric environment impact. The method comprises the steps that the number of runways and the orientation value range of each runway are determined by predicting airport future flights and meteorological information data, and corresponding different airport flying area layout schemes are made according to the runway number and orientation combination scheme; the discharge amount of pollutants of NOx, SOx, CO, HC and PM in the four stages of approaching, taxiing, takeoff and climbing of a plane is calculated; an AERMOD atmospheric diffusion model is built to simulate discharged pollutant diffusion, caused by the different flying area layout schemes, in the four stages of approaching, taxiing, takeoff and climbing of the plane separately, and the concentrations of the pollutants in an evaluation area are obtained; corresponding pollutant diffusion areas are calculated according to the pollutant concentrations, and the flying area layout planning scheme corresponding to the smallest area is the flying area layout planning scheme having the minimal impact on the atmospheric environment. Accordingly, the impact of an airport on the surrounding atmospheric environment can be reduced.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Logistics park functional zone phased layout method

InactiveCN108717614AAccurately solve the relative positional relationshipReduce the difficulty of solvingLogisticsGenetic algorithmsLayout planningLogistics management
The invention relates to a logistics park functional zone layout method in the logistics system planning field, in particular to a logistics park functional zone phased layout method. According to themethod, the layer-by-layer recurrence thought is utilized to decompose a logistics park functional zone layout problem into the three phases of functional zone interrelation determination, functionalzone layout structure determination and functional zone position and shape determination, and an optimal logistics park functional zone layout scheme is solved in a united mode through layer-by-layeroptimization. Through the method, the logistics relation and the non-logistics relation among logistics park functional zones are quantified to obtain a functional zone comprehensive function, a functional zone layout structure is obtained in combination with a to-be-allocated functional zone selection process, an arrangement judgment process and placement rules, a multi-target planning model anda genetic algorithm are utilized to clearly quantify the relation among the functional zones and the relevant position relation among operation units, the positions and shapes of all the functional zones are precisely solved, the solving difficulty of a traditional layout planning model is lowered, and the design requirement of a logistics park functional zone integrated layout scheme under a stated objective is met.
Owner:JILIN UNIV

Peaking power source layout method based on comprehensive evaluation indexes

InactiveCN105701609ACareful and precise inspectionFlexible choiceResourcesLayout planningElectric power system
The invention discloses a peak-shaving power supply layout method based on a comprehensive evaluation index and belongs to the technical field of power system management. This method is to establish a reasonable economic and technical comprehensive evaluation index of the peak-shaving power supply under the consideration of the comprehensive factors of the peak-shaving power supply unit construction, unit operating costs, and peak-shaving performance, and evaluate and compare the planned peak-shaving power supply; The goal is to minimize the sum of the comprehensive evaluation indicators of the layout planning scheme, and take the construction of a single unit as the decision variable. Under the premise of satisfying various constraints, the optimal peak-shaving power supply layout scheme is obtained by solving the optimization problem; The invention can comprehensively consider the economic indicators and technical indicators of the peak-shaving power supply, and the given layout planning scheme has reached the comprehensive optimization in terms of economy and technology; at the same time, it can examine the advantages and disadvantages of the layout planning scheme more carefully and accurately; it can be based on The actual needs of different regions can be flexibly selected, which greatly improves the practicability of the method.
Owner:NORTH CHINA ELECTRIC POWER UNIV (BAODING) +2

New energy enrichment power grid power supply planning method and system

The invention relates to an energy enrichment power grid power supply planning method and system. The method comprises first-stage planning processing and second-stage planning processing. The first-stage planning processing is characterized by based on a planning grid structure, taking the maximum line or section power flow as an optimization target, satisfying the voltage and frequency operationconstraint conditions, carrying out N1 and N2 stability check on network elements, and forming a power supply planning scheme meeting the safety and stability requirements of a power system; and thesecond-stage planning processing is characterized by on the basis that the first-stage power supply planning is feasible, establishing equivalent substitution relationships of various power supplies to optimize the configuration positions and the configuration number of different types of power supplies in the power supply layout planning, and then taking the minimum operation cost as an objectivefunction for the selected power supply layout planning scheme, and taking the resource constraints, the load requirements, the unit output characteristics and the operation cost characteristics as boundary constraints to analyze the new energy consumption level of an electric power and electric quantity balancing machine to thereby form an optimal layout scheme.
Owner:STATE GRID ECONOMIC TECH RES INST CO +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products