Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

914 results about "Ponding" patented technology

Ponding is the (typically) unwanted pooling of water, typically on a flat roof or roadway. Ponding water accelerates the deterioration of many materials, including seam adhesives in single-ply roof systems, steel equipment supports, and particularly roofing asphalt. On low-slope asphalt roofs, ponding water allows the oil solvent components of the asphalt to leach out and evaporate, leaving the roof membrane brittle and susceptible to cracking and leaking in the ponding location.

Tunnel lining self waterproof drainage system

The invention relates to a tunnel lining self waterproof drainage system, which comprises a surrounding rock bearing arch, a cast-in-place cement main waterproof layer, a pre-cast cement arch sheet layer and longitudinal drainage channels. Arch sheet layer construction gaps and cast-in-place cement main waterproof layer construction gaps are interlaced. The tunnel lining self waterproof drainage system is characterized in that movable drainage grooves are fixedly arranged below the pre-cast cement arch sheet layer of centralized bursting water seepage points of loose surrounding rocks, and form arch sheet drainage spaces with an inwards concave surface of the pre-cast cement arch sheet layer, the parallel drainage spaces distributed along the section of a tunnel form a movable drainage channel, the longitudinal drainage channels are communicated and are arranged on two sides of the movable drainage channel and the pavement of the tunnel, pre-embedded water guiding pipes are arranged at the centralized bursting water seepage points, a water outlet end of each pre-embedded water guiding pipe is arranged on the inwards concave surface of the pre-cast cement arch sheet layer, and pre-embedded grouting pipes are arranged outside the pre-embedded water guiding pipes. The invention completely solves stubborn problems of the tunnel on cracking, seeping, frost heaving, ponding or freezing and the like on the premise of not arranging an interlayer waterproof layer and a hidden seepage water blind pipe drainage system, and the tunnel lining self waterproof drainage system disclosed by the invention has a simple structure and is convenient to construct.
Owner:中国市政工程西北设计研究院有限公司

Cement concrete permeable brick, permeable road and production methods thereof

The invention relates to a cement concrete permeable brick, a cement concrete permeable road and production methods thereof. At present, most of urban construction adopting the rigid hardened ground has the problems of dust blowing at a fine day, water accumulation and impermeable ground at a rainy day, no groundwater level supplement, no relief of urban heat island effect, and the like. The invention aims to develop a cement concrete permeable brick, a cement concrete permeable road and production methods thereof. The cement concrete permeable brick is formed by pressing and molding a base material layer and a surface material layer, and both the base material layer and the surface material layer contain cement, sand, stone, water adsorbing resin, asphalt powder, diffusant and a water reducing agent. The production method of the permeable brick is realized by molding the permeable brick by a computer full-automatic building block forming machine; and the production method of the cement concrete permeable road is realized by directly pressing the cement concrete permeable road through a road roller. The invention can achieve the aims of water adsorption, water retention, permeability and practicability, can be widely used for a highway, an airport runway, a roadway, a footway, a square, garden construction, and the like and solve the problem of road icing.
Owner:SHAANXI SUNSHINE RAIN ECOLOGICAL TECH

Sponge city hydrologic calculation method

ActiveCN108022047AEasy to set upGrasp the effect of regulationClimate change adaptationArtificial lifeHydrometryPonding
The invention relates to the field of hydrologic calculations, and more specifically, to a sponge city hydrologic calculation method. The method includes the steps of S1, collecting rainfall-related basic data within a set time limit of a study region; S2, combined with the collected data, constructing a SWMM model suitable for the study region; S3, constructing different rainfall scenarios, combined with the SWMM drainage model, analyzing response characteristics of a drainage system in the region before and after the regulation and control via LID measures under the different rainfall scenarios, and comparing regulation and control effects of the LID measures; and S4, establishing a regional rainfall flood characteristic assessment system to explore spatial and temporal characteristics of a rainfall flood before and after the regulation and control via the LID measures under the different rainfall scenarios. The invention provides the sponge city hydrologic calculation method, whichconstructs the regional drainage model, simulates the peak runoff, drainage pipe network drainage pressure, water accumulation time and water accumulation amount in a sub catchment region before and after the regulation and control via the LID measures in the region under various extreme rainfall scenarios, is conducive to grasping the regulation and control effects of the LID measures on the regional rainfall flood and facilitates the setting of the LID measures in the construction of sponge cities.
Owner:SUN YAT SEN UNIV

Integrated rainwater system for sponge city and construction method of rainwater system

The invention discloses an integrated rainwater system for a sponge city and a construction method of the rainwater system. The rainwater system comprises a middle green belt and water storage tanks, wherein the middle green belt comprises a vegetation planting area and a rainwater infiltration area; a concrete course is arranged at the lower end of the rainwater infiltration area; a rainwater pipe is arranged at the lower end of the concrete course, and the rainwater pipe is connected to the water storage tanks; water pumping pipes are connected from the interiors of the water storage tanks; bidirectional nozzles are arranged at the other ends of the water pumping pipes; and water pumps are connected to the water pumping pipes. In accordance with the shortcomings of the prior art and the characteristics of the sponge city, the rainwater system, which integrates water seepage, water storage, water purification and utilization, is designed, and the construction method of the rainwater system is correspondingly designed; by promoting the water seepage with the adoption of vegetation, the problem of road water-logging is solved through slow discharge and controlled release; and in addition, some impurities in the rainwater are separated on the basis of the purification capacity of the vegetation, and the rainwater is stored in the water storage tanks and is used for spraying roads and watering the vegetation in dry season, so that adverse effect caused by drought and flood seasons can be effectively relieved.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment

ActiveCN103283335AGuarantee the source of covering soilDrain fastSoil lifting machinesSoil-working methodsPondingSoil depth
The invention relates to a filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment and belongs to the technical field of mine environment protection. The filling reclamation method includes: confirming trends and sizes of Yellow River sediment filling strips according to the sizes and the shapes of a subsided basin to be filled; draining accumulated water in the subsidence land via existing drainage ditches around the subsidence land, and building a field path and drainage ditches along the vertical filling trend in the central area of the subsidence land; confirming the soil stripping depth of every strip according to the sediment depth, the available soil depth and reclamation elevation of every strip to be filled, stripping surface soil from subsoil in a strip-separated and layered stripping manner, and piling the surface soil and the subsoil on two sides of every strip; filling along a direction from two ends of the strips perpendicular to the central drainage ditches to the drainage ditches, covering the strips by the subsoil and the surface coil sequentially in a reasonable thickness after drainage consolidation of the filled sediment, and finally leveling the land to form a reconstructed soil profile. The filling reclamation method provides technical supports for filling reclamation of the coal mining subsidence lands by the Yellow River sediment.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Vehicle navigation device and method

The invention discloses a vehicle navigation device and method. The device comprises a data acquisition module, a route generation module, a route matching module, and a navigation module, wherein the data acquisition module is used for acquiring current driving path data of a vehicle to be navigated within a preset duration away from the current moment when detecting a usual route navigation instruction; the route generation module is used for generating a current driving route of the vehicle to be navigated according to the current driving path data; the route matching module is used for judging whether the current driving route is matched with a prestored usual driving route or not; if the current driving route is matched with the usual driving route, traffic information on the usual driving route is acquired; the navigation module is used for outputting a corresponding navigation suggestion according to the traffic information on the usual driving route. The vehicle navigation device and the method provided by the invention timely inform a user through the navigation suggestion when special circumstances such as jam, ponding or road maintenance occurred on the usual route, so that a vehicle of the user is prevented from being blocked on the usual route, meaningless time waste is avoided, and the transportation efficiency of the user on the usual route is further improved.
Owner:湖南索菱汽车电子科技有限公司

Method for establishing simplified hydraulic model of urban downward-concave overpass area under different rainstorm situations

ActiveCN103886151ASimplify workThe method of building the model is simpleSpecial data processing applicationsPondingEnvironmental resource management
The invention belongs to the technical field of municipal engineering, and discloses a method for establishing a simplified hydraulic model of an urban downward-concave overpass area under different rainstorm situations. The method comprises the steps that the catchment range of a high-catchment area and a low-catchment area of the urban downward-concave overpass area and a high-precision DEM are determined to serve as earth surface elevation input conditions of the model; the input of a model pipe network is simplified through the rainfall loss form; the waterlogging disaster situation in the urban downward-concave overpass area under the different rainstorm situations is simulated through the computer hydraulic model; an improvement implement scheme is determined according to a model calculation result. The method for establishing the simplified hydraulic model of the urban downward-concave overpass area under the different rainstorm situations is stated, the waterlogging disaster situation in the urban downward-concave overpass area under the different rainstorm situations can be simulated, and a current overpass area designing scheme can be assessed. According to the method, it makes possible that the reason for ponding of a downward-concave overpass is analyzed through the hydraulic model, and a theoretical basis is provided for improving and planning the downward-concave overpass.
Owner:长沙柳腾科技有限公司

Cable trench and tunnel inspection unmanned aerial vehicle system

The invention discloses a cable trench and tunnel inspection unmanned aerial vehicle system. The system comprises an unmanned aerial vehicle and a control device; a modeling data acquisition device, acollision pre-warning device, an infrared data acquisition device, an infrared composite gas detection device and a temperature and humidity detection device are fixedly connected with the unmanned aerial vehicle; the unmanned aerial vehicle is electrically connected with the modeling data acquisition device, the collision pre-warning device, the infrared data acquisition device, the infrared composite gas detection device and the temperature and humidity detection device; and the control device and the unmanned aerial vehicle are wirelessly connected with the modeling data acquisition device, an upper computer, a BDS control intranet, the infrared data acquisition device, the infrared composite gas detection device and the temperature and humidity detection device. The system is capableof recognizing parameters and features such as temperature, humidity, harmful gas concentration, water seepage and ponding, cable damage, discharging, heating, snake and mouse in cable trenches and tunnels in real time, and carrying out demarcation and recording in environment data models, and has the characteristics of remote operation, high inspection efficiency, no leak inspection, safety, reliability and all-weather operation.
Owner:XIJING UNIV

Sponge city drainage structure and sponge city water circulation system

The invention provides a sponge city drainage structure and a sponge city water circulation system, and relates to the technical field of sponge cities. The sponge city water circulation system comprises a sponge city drainage structure, a filtering structure and a water utilization structure which are communicated in sequence, wherein the water permeating surface of the sponge city drainage structure is provided with a plurality of overflow pipes in a penetrating mode. A holey blind tube is placed in the drainage penetrated layer in an embedded mode. Each overflow pipe placed at one end of the drainage penetrated layer is connected with the holey blind tube. The other end of the holey blind tube is connected to the filtering structure. When the rainfall is low, the rainwater enters into the reservoir to be stored and then penetrates through the soil layer. When the rainfall is high, the water level of the reservoir rises above the holey permeable blind tube and the rainwater is output to the filtering structure through the holey blind tube to be ecologically purified, and then the rainwater is extracted by the water utilization structure. The water penetration effect of the sponge city drainage structure is good. The rainwater infiltrates to underground or is drained to the external part which avoids causing the ponding. The sponge city water circulation system is capable of evenly achieving comprehensive and effective rain flood managing for different rainfall.
Owner:武汉艺源环境艺术工程有限公司

Sponge city drainage structure and sponge city water circulating method

The invention relates to a sponge city drainage structure and a sponge city water circulating method. A road structure comprises a permeable concrete layer, a mortar leveling layer, a graded broken stone layer and a plain soil layer from top to bottom in sequence; support grids are arranged in the mortar leveling layer; a guide pipe for drainage is arranged in the graded broken stone layer; drainage ditches and road traffic stones are arranged on the two sides of the road layer structure; the drainage ditches are positioned between the road layer structure and the road traffic stones; drain pipes are arranged at the bottoms of the drainage ditches; water storage cavities are formed in the road traffic stones, and communicate with the drainage ditches through drainage holes; the other sides, relative to the drainage holes, of the water storage cavities communicate with green belts through permeable holes; the green belts comprise pebble beds, planting soil layers and green broken stonelayers in sequence from top to bottom; drainage pipes for drainage are arranged in the green broken stone layers; a water collecting pool is connected with a main pipe; and the guide pipe, the drain pipes and the drainage pipes communicate with the main pipe. The structure achieves the effects of reducing the city road ponding conditions and improving the rainwater utilization rate.
Owner:广东洋艺建设有限公司

Construction method of large-diameter crushed stone pile

ActiveCN102888834AReduce penetration resistanceReduce equipment performance requirementsSoil preservationThin walledEngineering
The invention provides a construction method of a large-diameter crushed stone pile. The construction method comprises the following construction steps of: cleaning miscellaneous fill on the surface layer of a soft foundation; when mountain stones are filled on the surface layer, firstly carrying out punching and hole guiding work and penetrating through a stone filling layer; sinking a large-diameter thin-wall steel sleeve with the outer diameter of 800-1600mm into the soft foundation until the depth reaches to a designed depth; constructing and finishing dry soil taking and hole forming work in the large-diameter thin-wall steel sleeve; matching a water pumping and discharging measure and completely draining water in a drainage hole; filling crushed stones in the hole by layers, and tamping and filling by layers, wherein the thickness for tamping by layers is more than 3m; tamping and filling by layers until the height is 50cm higher than a designed pile top mark height; pulling out the large-diameter thin-wall steel sleeve from the soft foundation; and forming the large-diameter crushed stone pile with the outer diameter of 800-1600mm in the soft foundation. The construction method has the advantages of low requirements on construction equipment, low construction difficulty, controllable quality of the prepared crushed stone pile, high bearing capability of the pile foundation, good water discharging capability and the like; and the prepared crushed stone pile is mainly applied to compound foundation or water discharging solidification treatment of buildings including a stacking field, a road, a large-size steel storage port foundation and the like on a large-area deep and thick soft foundation.
Owner:SHANGHAI SHEN YUAN GEOTECHN +2

Device for clearing blocking of drainage well cover of sponge city pavement

The invention discloses a device for cleaning blocking of a drainage well cover of a sponge city pavement. The device comprises the pavement and a curbstone, a drainage channel is formed in the side,close to the curbstone, of the pavement, a mounting opening is formed in the channel opening of the drainage channel, the drainage well cover is arranged in the mounting opening, a water inlet cavityis formed in the curbstone, a water inlet communicating with the water inlet cavity is formed in the side wall of the upper end of the curbstone, a big piston is arranged in the water inlet cavity, anelastic airbag is connected between the lower end of the big piston and the inner bottom of the water inlet cavity, a drainage pipe communicating with the drainage channel is arranged on the inner wall of the water inlet cavity, strip-shaped cavities are formed in both sides of the drainage channel, the inner bottoms of the strip-shaped cavities are bonded to a vertically arranged folding airbag,and the folding airbag communicates with the elastic airbag through an air pipe. The device for cleaning blocking of the drainage well cover of the sponge city pavement is reasonable in structure, and when water on the pavement where the drainage well cover is blocked is accumulated to a certain degree, debris clogged on the drainage well cover can be jacked up in time to clear the blockage in time.
Owner:山东格式医疗器械有限公司

Design method and design system for roof rainwater drainage systems and drainage system

The invention provides a design method for roof rainwater drainage systems, which comprises the following steps of: calculating the volumetric flow rate of water flowing through a rainwater hopper; calculating the mass flow rate of an aerified water flow; calculating the pressure loss of each pipeline section based on the mass flow rate of the aerified water flow; calculating the values of negative pressures on a hanged pipe and a stand pipe at the junction point of the tail end of the hanged pipe and the top end of the stand pipe; judging whether the values of negative pressures on the hanged pipe and the stand pipe at the junction point satisfy the design requirements of a pipe system or not, if so, completing the design process; and otherwise, designing the value of each pipe diameter again, and then calculating again. Therefore, in the drainage system designed according to the design method for roof rainwater drainage systems provided by the invention, the pipes of the drainage system are thin and short in length, so that the application quantity and construction quantity of the pipes can be reduced, thereby reducing the cost of the whole drainage system. Meanwhile, the drainage system is additionally provided with an exhaust device, therefore, the hidden troubles such as roof rainwater ponding and leakage as well as manhole sweating can be avoided.
Owner:CHINA IPPR INT ENG

Roof rainwater collecting system

The invention discloses a roof rainwater collecting system, which comprises a roof, a rainwater collecting groove, a primary filtering device, a split-flow device, a reverse flushing filtering device and a rainwater collecting barrel, wherein the rainwater collecting groove is formed at the lower edge of the roof; the primary filtering device is arranged at the lower part of a water outlet opening of the rainwater collecting groove in a non-contact way, and can be used for intercepting sundries with large sizes to prevent a water passing pipeline from being blocked; an intercepting regulating rod of the split-flow device can intercept the rainwater from entering a regulating cavity so as to raise a floating ball valve; the early stage rainwater split-flow and the later stage pure water collection can be realized; the reverse flushing device is provided with a first filtering screen, a second filtering screen and a flushing device; the filtration on the collected rainwater can be realized; when pipeline accumulated water increase is caused by the blockage of the first filtering screen and the second filtering screen by filtering sundries, under the rainwater static pressure effect in the water passing pipeline, a piston is driven to move, a flushing outlet is opened; and the automatic flushing on the reverse flushing device can be realized. The roof rainwater collecting system has the dual filtering and early stage rainwater split-flow function; and the rainwater collection and utilization efficiency can be improved.
Owner:JIANGSU UNIV

An urban rainstorm water accumulation assessment modeling method based on full space-time

The invention discloses an urban rainstorm water accumulation assessment modeling method based on full space-time, and the method comprises the following steps: 1, obtaining DSM data containing surface information, employing a D8 algorithm to divide a water catchment area, and modifying the boundary of the water catchment area according to the connection and distribution conditions of a real pipenetwork, so as to obtain the divided water catchment area; 2, establishing a surface runoff production model, and calculating runoff production of each catchment area; Step 3, establishing a surface confluence model, and calculating confluence of each catchment area; And step 4, establishing a drainage experience model to carry out drainage calculation, and calculating the drainage capacity of each catchment area through the drainage experience model so as to obtain an urban inland inundation assessment result. The DSM is adopted to divide the urban catchment area, the influence of urban planning and construction on urban topography reconstruction can be well reflected, and the method is more practical; The problem that drainage calculation cannot be carried out due to lack of structural data of a drainage pipeline is solved, and the operation time of the model is remarkably shortened.
Owner:WUHAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products