Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

3193results about "Paving gutters/kerbs" patented technology

Modular porous swale

A modular porous swale. The modular porous swale may comprise a porous concrete block and filtration joint. The porous concrete block may snugly fit within a trench having a lower portion filled with an absorption media. The absorption media may include gravel, activated alumina, bone char, biochar, bone char and activated alumina mixture, and biochar and activated alumina mixture. The porous concrete block may have a top surface inwardly-sloped to a nadir. The filtration joint may be disposed within the porous concrete block and along the nadir. The liner may cover one or more sides of the porous concrete block. The perforated pipe may be located within the absorption media. The filtration joint may substantially align above a portion of the perforated pipe when the modular porous swale is installed within the trench.
Owner:THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE NAVY

Protective barrier

A protective barrier includes an angle bracket having a length extending from a first end to a second end of the protective barrier. The angle bracket includes a first elongate leg member having a first edge extending along the length of the angle bracket, the first elongate member having a first side configured to be mounted to a surface, a second elongate leg member extending along the length of the angle bracket and substantially perpendicular from the first elongate leg member, and an impact absorber extending from the first end to the second end of the protective barrier, the impact absorber being compressible and configured to be disposed on the angle bracket.
Owner:MCCUE CORP

System and method for coupling urban rain and flood resources to recharge underground water

The invention provides a system and method for recharging underground water by coupling urban rain and flood resources, and belongs to the technical field of underground water recharging. The system comprises a roof rainwater recycling mechanism, a road surface rainwater recycling mechanism, a regulating reservoir, a rainwater purifying mechanism, a rainwater recharging mechanism and the like. Coupling collection of road surface rainwater and roof rainwater is achieved, the roof rainwater recycling mechanism and the road surface rainwater recycling mechanism both have the flow discarding function, so that the collected rainwater is relatively clean, the quality of recharged rainwater can be improved through further treatment of the rainwater purification mechanism, and the groundwater supply quality is effectively guaranteed. According to the system, the combination effect of all units is good, comprehensive rainwater collection and more scientific utilization of collected rainwater can be achieved, and a new thought is provided for rainwater and flood resource reutilization.
Owner:WATER RESOURCES RES INST OF SHANDONG PROVINCE

Sponge city road drainage structure

The sponge city road drainage structure comprises a road body, the road body is provided with a drainage cavity, the drainage cavity is provided with a confluence pipeline, the confluence pipeline is provided with a confluence channel, the confluence channel is provided with a liquid inlet side and a liquid drainage side, and the inner wall of the confluence channel is provided with a filter plate. The filtering plate slides on the inner wall of the confluence channel, the filtering plate is provided with filtering holes, the filtering holes penetrate through the filtering plate, the filtering pipeline is provided with a filtering channel, the filtering channel is communicated with the confluence channel, the filtering plate is connected with a driving part, and the driving part drives the filtering plate to move in the direction close to the liquid discharging side. A control piece is arranged on the inner wall of the confluence channel and connected with a scraper blade, and the control piece drives the scraper blade to move in the vertical direction. The scraping plate is driven by the control part to move so as to remove the impurities attached to the filter plate, so that the impurities are convenient to clean, and the influence of the impurities on the filtration of the filter plate is reduced.
Owner:TAIZHOU XINYANG MUNICIPAL CONSTR

High strength porous cement-based materials

The present disclosure is related to a method of forming a cement-based material pad comprising a plurality of drainage holes and forms for use in such a method.
Owner:IMPERIAL COLLEGE INNVOATIONS LTD

Temporary traffic shortcut for road construction

The utility model relates to the technical field of road construction, in particular to a temporary traffic road for road construction. The multiple supporting rods are connected with the passing panel, the multiple supporting rods are all located on the same side of the passing panel, and a receding cavity is formed between every two adjacent supporting rods; the supporting bottom plate is located on the side, away from the passing panel, of the supporting rod, and the supporting bottom plate is connected with the supporting rod; a temporary supporting surface can be provided for vehicle passing through the passing panel, and the passing panel can be separated from the ground through the supporting rods, so that the passing panel is kept horizontal with the original road surface, and the structural strength of the passing panel is improved; the supporting bottom plate can be matched with the passing panel and the multiple supporting rods to form a stable hollow structure, noise generated when a vehicle passes through is reduced, and the receding cavity can be formed so that a forklift arm of a forklift can stretch into the receding cavity to achieve the effect of carrying and transferring.
Owner:SHAANXI ROAD & BRIDGE GRP ROAD SURFACE CONSTR

Solid waste-based cementing material and preparation method thereof

The invention provides a solid waste-based cementing material and a preparation method thereof, and relates to the technical field of solid waste resource utilization and cementing material preparation. The cementing material is prepared by mixing and grinding 60-80 parts by weight of modified phosphogypsum and 20-40 parts by weight of an auxiliary material, and the auxiliary material comprises at least one of steel slag powder, fly ash, lithium slag and mineral slag; a preparation method of the modified ardealite comprises the following steps: carrying out microwave treatment on ardealite for 0.5-1 hour, mixing the treated ardealite with aluminum oxide, attapulgite and sodium lignosulphonate, adding a tetramethylammonium hydroxide solution, and drying to obtain the modified ardealite. According to the solid waste-based cementing material disclosed by the invention, the phosphogypsum is modified, so that the solid waste-based cementing material has the characteristics of high strength, stable cementing, strong erosion resistance and the like while the mixing amount of the phosphogypsum is increased.
Owner:HUBEI COMM PLANNING & DESIGN INST CO LTD

Drainage and blockage combined novel composite liner separation layer for salinized soil roadbed and roadbed structure

The invention provides a dredging and blocking combined salinized soil roadbed novel composite liner separation layer and a roadbed structure. The composite liner separation layer comprises a first layer of non-woven geotextile, an upper layer of three-dimensional geotextile drainage network, a second layer of non-woven geotextile, a polymer modified bentonite particle layer, a third layer of non-woven geotextile, a lower layer of three-dimensional geotextile drainage network and a fourth layer of non-woven geotextile which are sequentially arranged from top to bottom; the roadbed structure comprises a pavement structure layer, a roadbed, a composite liner partition layer and an embankment which are sequentially laid from top to bottom, and slope protection ways and drainage ditches are arranged on the two sides of the roadbed structure. Through the bentonite particle impermeable layer in the composite liner separation layer, infiltration of surface water can be prevented, and rising of capillary water and migration of water and salt under the action of temperature gradient can also be blocked; slope protection and drainage ditches are designed on the two sides of the roadbed, smooth salt and water drainage of the roadbed is guaranteed, and the risk of roadbed settlement caused by migration and uneven distribution of water and salt in the salinized soil roadbed is reduced.
Owner:SHANGHAI UNIV

Shock insulation roadbed structure of road and shock insulation road

The invention provides a road shock insulation roadbed structure and a shock insulation road, the road shock insulation roadbed structure comprises an embankment, and is characterized by comprising a high-damping concrete layer, a shock insulation cushion layer, a concrete bearing layer and a flexible buffer layer which are sequentially arranged below the embankment from top to bottom, and shock insulation pile holes arranged in a soil body below the flexible buffer layer in an array, the rubber hole protection sleeves are attached to the inner walls of the shock insulation pile holes and inserted into the shock insulation pile holes, and the shock insulation grooves are excavated in the direction of the road close to the two sides of the embankment. According to the invention, the transmission of earthquake energy to the embankment and the road surface can be reduced, so that the road can be protected.
Owner:CCFEB CIVIL ENG

Cement concrete curb based on multi-stage activated waste asphalt milling material and preparation method of cement concrete curb

The preparation method of the cement concrete curb based on the multi-stage activated waste asphalt milling material comprises the following steps: gradient crushing and screening: coarsely crushing RAP by a jaw crusher until the particle size is less than or equal to 20mm, finely crushing the RAP by a vertical shaft impact crusher until the particle size is less than or equal to 10mm, and then carrying out vibration screening and airflow separation to obtain an RAP powder; and separating to obtain coarse aggregate of 5-10 mm, fine aggregate of 2-5 mm and active powder of less than 0.075 mm. Through the synergistic effect of the nano SiO # imgabs0 # and the silane coupling agent, a siloxane net structure is formed on the surface of RAP, and chemical bonding of a cement hydration product and old asphalt is promoted; low-carbon economy is achieved, the RAP mixing amount reaches 85%, the cement consumption is reduced by 50% compared with that of traditional concrete, and the emission of CO # imgabs 1 # is reduced by 58%.
Owner:安徽交控工程集团有限公司

Road drainage system after municipal transformation of road

The invention relates to the technical field of road drainage engineering, in particular to a road drainage system after municipal transformation of a road. The rainwater distribution condition after municipal transformation of the expressway is considered as a whole, the drainage structure is reasonably arranged to be effectively connected with a municipal drainage system, graded drainage is achieved, drainage pressure is reduced, and the rapid drainage requirement of municipal transformation of the expressway is met; the road drainage system is beneficial to reducing the pressure of a downstream drainage pipeline, reducing the specification of the drainage pipeline and reducing the engineering investment.
Owner:CCCC FIRST HIGHWAY CONSULTANTS CO LTD

Fabricated paving stone capable of guiding flow and draining water and processing technology of fabricated paving stone

The invention discloses a processing technology of flow guide and drainage assembly type paving stone, and belongs to the technical field of paving stone, the flow guide and drainage assembly type paving stone comprises a paving stone body, a flow guide and drainage groove is formed in the paving stone body, and water collecting holes are formed in the corners of the flow guide and drainage groove; the water collecting hole communicates with a water storage cavity in the paving stone body through a water inlet channel, a drainage channel communicating with the outside is formed in the middle of the water storage cavity, two flow dividing grooves are formed in the side edge of the water collecting hole, and a butt joint inserting block is fixed to an opening of one flow dividing groove; the butt joint inserting blocks are inserted into the flow dividing grooves in the other paving stone body and used for connecting the drainage systems in the multiple paving stone bodies in parallel. According to the flow guide and drainage assembly type paving stone and the processing technology thereof, in the paving process of the paving stones, the adjacent paving stones can be conveniently assembled, the connection strength between the paving stones is improved, and meanwhile after the paving stones are connected, drainage systems of the multiple paving stones communicate with one another.
Owner:FUJIAN JUNMA CERAMICS CO LTD

Expansive soil roadbed drainage anti-seepage structure and construction method

The invention discloses an expansive soil roadbed drainage anti-seepage structure and a construction method, and relates to the technical field of expansive soil roadbed construction.The expansive soil roadbed drainage anti-seepage structure comprises a roadbed body and geotechnical cloth and further comprises a laying mechanism arranged on a moving vehicle and used for laying the geotechnical cloth, and the laying mechanism comprises an L-shaped plate slidably connected to the moving vehicle; the end, away from the moving trolley, of the L-shaped plate is connected with a U-shaped frame, the U-shaped frame is rotationally connected with a rotating shaft, the geotechnical cloth is wound around the rotating shaft, and a first motor used for driving the rotating shaft to rotate is arranged on one side of the U-shaped frame. According to the expansive soil roadbed drainage anti-seepage structure and the construction method, through the arrangement of the laying mechanism, an operator does not need to conduct manual laying operation on the inclined side wall of the side ditch, then the safety of geotechnical cloth laying is improved, and meanwhile under the cooperation effect of the pressing assembly and the driving assembly, the anti-seepage performance of the side ditch is improved.
Owner:CHINA MCC17 GRP CO LTD

Municipal road drainage mechanism

The invention provides a municipal road drainage mechanism, and relates to the field of municipal road drainage. A drainage cover is placed at the top of the drainage shell, waterproof electric cylinders are fixedly installed at the tops of the left side wall and the right side wall of the drainage shell, control connecting rods are telescopically hinged to the bottoms of the waterproof electric cylinders, anti-blocking scraping plates are symmetrically and slidably connected to the left side and the right side in the drainage shell, and the bottoms of the anti-blocking scraping plates are connected with the control connecting rods. Overflow baffles are slidably connected to the middles of the left inner wall and the right inner wall of the drainage shell, two blocking boxes are placed in the drainage shell, and two flow guide turbines are rotationally connected to the lower side in the drainage shell. The anti-blocking scraping plate is driven by the waterproof electric cylinder, sundries on the inner wall of the top of the drainage cover and the inner wall of the top of the drainage shell are cleaned through the transverse scraper, a drainage channel is prevented from being blocked, and the problems that traditional drainage is poor in rainwater gathering capacity during rainstorm, prone to being blocked by sundries, needing to be manually cleaned, not utilizing rainwater energy and causing resource waste are solved.
Owner:NINGXIA WEIHUA XINXING CONSTR CO LTD

Municipal road subgrade protection engineering construction process

The invention discloses a municipal road subgrade protection engineering construction technology, and relates to the technical field of municipal road construction, and the municipal road subgrade protection engineering construction technology comprises the following steps: S1, geological investigation and evaluation; s2, roadbed design and optimization; s3, drainage system design and water conservancy project; s4, roadbed reinforcement treatment; s5, roadbed material selection and quality control; s6, roadbed construction and compaction; s7, protecting and reinforcing the side slope; s8, roadbed monitoring and maintenance; and S9, implementing environmental protection and energy saving measures and performing construction safety management. By implementing detailed geological investigation and evaluation, scientific design and optimization, targeted reinforcement treatment, strict quality control and a comprehensive monitoring and maintenance system and integrating environmental protection and energy saving concepts, the stability and durability of the municipal road subgrade are improved, geological and environmental risks are effectively avoided, and the safety and reliability of the municipal road subgrade are improved. The rationality and safety of the road structure are ensured, meanwhile, resource saving and environment protection are promoted, and a solid foundation is laid for smoothness and safety of urban traffic.
Owner:BEIJING ROAD&BRIDGE FANGZHOU TRAFFIC SCI TECH DEVELO

Lightweight anti-corrosion cement-based prefabricated part as well as preparation method and application thereof

The invention relates to the technical field of building materials, in particular to a light anti-corrosion cement-based prefabricated part as well as a preparation method and application thereof. The cement-based prefabricated part is prefabricated and formed by bonding a base body located on the inner layer of the cement-based prefabricated part and a surface material located on the peripheral layer of the cement-based prefabricated part through an adhesive and performing microwave heating. Wherein the surface material is prepared from filler, modified stone powder, cement and the like through colloid mill shearing treatment and filter pressing treatment; the matrix is prepared by mixing a foaming agent, mineral powder, sodium hydroxide, metakaolin, aggregate, polypropylene fiber, calcium lignosulphonate and the like, putting into a mold, performing steam curing and demolding. The outer surface of the base body is coated with an adhesive, and the surface material and the base body are combined in a vibration extrusion forming mode and then subjected to microwave heating treatment to be manufactured into the cement-based prefabricated part. The cement-based prefabricated part is high in salt resistance, freezing resistance and acid resistance, light in weight and suitable for being used as a building material in a cold region, including curbs.
Owner:山东高速工程检测有限公司

Preparation process of Yellow River deposited sand high-strength cement-based curb material

The invention discloses a preparation process of a Yellow River deposited sand high-strength cement-based curb material, which comprises the following steps: (1) adding mixed powder formed by pseudo-wollastonite powder and glass powder into wet chopped basalt fibers to obtain pretreated basalt fibers; and (2) carrying out heat treatment on the pretreated basalt fiber and coal gangue powder to obtain pretreated coal gangue powder and modified fiber for later use. And (3) wetting the modified fiber by using a tannic acid saturated solution, and carbonizing in a carbonization box containing carbon dioxide and water vapor to obtain the carbonized modified fiber. And (4) taking cement powder, gravel coarse aggregate, Yellow River deposited sand, fly ash, carbonized modified fiber, a water reducing agent and the like as raw materials. The preparation method comprises the following steps: uniformly mixing the raw materials, adding mixing water and uniformly mixing. According to the invention, the mechanical strength of the curb is effectively improved by adopting the fibers which have good bonding capacity with the curb matrix, and the application of the yellow river deposited sand is promoted.
Owner:SHANDONG XINGLI CONSTR ENG CO LTD +1

Asphalt pavement milling material cold recycling prefabricated part and preparation method

The invention relates to the technical field of recycling of renewable resources, in particular to an asphalt pavement milling material cold-recycled prefabricated part and a preparation method, and the asphalt pavement milling material cold-recycled prefabricated part is prepared from the following raw materials in parts by weight: 45 to 53 parts of waste pavement milling material with the particle size of less than 4.75 mm, 19 to 27 parts of waste pavement milling material with the particle size of 4.75 to 9.5 mm, 20 to 28 parts of stone chips, 1 to 1.4 parts of mineral powder, 1.6 to 2.0 parts of silica fume, 4.6 parts of water, 2.3 to 2.7 parts of cement and 2.3 to 2.7 parts of foamed asphalt. According to the invention, the waste asphalt pavement milling material is used as the raw material of the concrete prefabricated component, so that the resource is saved, the utilization rate of the asphalt milling material is increased, and the green development concept is met; the prefabricated parts are manufactured through a cold regeneration process, compared with a traditional hot mix plant regeneration process, energy is saved, environment friendliness is achieved, emission of greenhouse gas is reduced, and therefore the problems that the hot mix plant regeneration mode is high in cost and carbon emission are solved.
Owner:JILIN HIGHROAD RECONNAISSANCE DESIGN INST

Novel self-locking straight-through hole water permeable brick

The utility model discloses a novel self-locking straight-through hole water permeable brick which comprises a water permeable brick body, and the cross section of the water permeable brick body is of a rectangular structure. The number of the first splicing grooves is two, and the two first splicing grooves are symmetrically formed in the two opposite side faces of the top face of the water permeable brick body; two groups of second splicing grooves are symmetrically formed in the bottom surfaces of the water permeable brick main bodies, and the first splicing grooves and the second splicing grooves of the adjacent water permeable brick main bodies are correspondingly arranged; a plurality of groups of water permeable holes are arrayed on the water permeable brick main body, and the axes of the water permeable holes are parallel to the height direction of the water permeable brick main body; the flow guide grooves are respectively formed in the top surface and the bottom surface of the water permeable brick main body, and the adjacent water permeable holes are communicated through the flow guide grooves; the lengths of the first diversion trench and the second diversion trench are equal and are half of the length of the water permeable brick main body. According to the utility model, the plurality of water permeable brick main bodies form an occlusion effect, so that the splicing stability is ensured, meanwhile, the splicing is simple, and the construction difficulty is low.
Owner:武夷学院

Fabricated water delivery road traffic stone

The utility model discloses an assembly type water delivery curbstone, and relates to the technical field of curbstones, in particular to an assembly type water delivery curbstone which comprises a water delivery curbstone, an asphalt pavement and a sidewalk, the front end of the water delivery curbstone is in contact with the asphalt pavement, and the rear end of the water delivery curbstone is in contact with the sidewalk. The water delivery road traffic stone is arranged between an asphalt pavement and a sidewalk and is used for distinguishing roads and draining the roads, the water delivery road traffic stone comprises a road traffic stone assembly, the road traffic stone assembly comprises a kerb laid between the asphalt pavement and the sidewalk, and the problem that a kerb body and a base are assembled through a bayonet is solved; in the prior art, the curb body and the base are not firmly fixed, the curb body still needs to be fixed by means of the buried depth, and the curb bodies of multiple models in the scheme are integrally low, so that the buried distance is small, and the curb bodies are not firmly installed after being laid.
Owner:ANHUI YAQUAN PLASTIC IND CO LTD

A drainage device for road and bridge engineering construction

The present invention relates to the field of drainage devices, and discloses a drainage device for road and bridge engineering construction, including a drainage device body installed in a beam body, a mounting groove pit for mounting the drainage device body is provided on the surface of the beam body, and a drainage channel is provided on both sides of the lower end of the mounting groove pit, respectively, and the drainage device body is installed in the mounting groove pit. This design makes it easier for garbage and dust entering the drainage device to be guided into the recessed part under the action of gravity and water flow, rather than directly entering the drainage channel. At the same time, the design of the inclined surface also helps the garbage and dust to slide and accumulate, further improving the filtering effect. Therefore, when this mechanism processes and filters light garbage such as leaves, paper scraps, plastic bags, etc., it can significantly reduce the number of them entering the drainage channel, thereby effectively preventing the blockage of the drainage channel.
Owner:ZHONGMEI ENGINEERING GROUP LTD

Integrated device and method for in-situ mineralization of rainwater through bioretention facility

The invention relates to an integrated device and method for in-situ mineralization of rainwater through a bioretention facility. The integrated device comprises a bioretention device body, and the bioretention device body is composed of a super high-rise building, a water storage layer, a covering layer, a filler layer and a drainage layer from top to bottom. The invention further provides a method for in-situ mineralization of rainwater through the integrated device, and the method comprises the steps that the rainwater flows into the super high-rise building through the road surface confluence and flows into the water storage layer from the super high-rise building, and the rainwater passing through the water storage layer infiltrates into the covering layer; the rainwater infiltrated through the covering layer enters the filler layer; rainwater mineralized by the filler layer infiltrates into the drainage layer, the water volume in the drainage layer is gradually increased and the water storage liquid level is gradually increased along with the convergence of the rainwater, and when the water storage liquid level of the drainage layer exceeds the height of the upper edge of the perforated drainage pipe, the rainwater flows into the perforated drainage pipe through the nylon net, so that in-situ mineralization and collection of the rainwater are realized. According to the invention, the problems of scattered layout, large occupied space, complex operation and the like of the existing sectional mineralization treatment technology are solved.
Owner:CHONGQING UNIV

Frozen soil roadbed side ditch structure

A permafrost roadbed side ditch structure comprises a permafrost base layer, a roadbed base layer and a roadbed surface layer are sequentially arranged on the permafrost base layer, the permafrost roadbed side ditch structure further comprises a foundation trench, a rigid partition plate set and a side ditch body, the foundation trench is supported on the permafrost base layer, the foundation trench is filled with an inverted filter layer, a drainage pipe is arranged in the inverted filter layer, and the rigid partition plate set comprises an outer side partition plate and an inner side partition plate. The outer side partition plate is arranged on the inverted filter layer, the inner side partition plate is fixedly arranged on the frozen soil base layer and attached to the side walls of the roadbed base layer and the roadbed surface layer, a plurality of water seepage holes are formed in the inner side partition plate, a plurality of capillary tubes extending in the height direction are arranged between the inner side partition plate and the outer side partition plate, and the lower ends of the capillary tubes extend to the inverted filter layer. A sand and gravel piling layer is arranged on the inverted filter layer, and the side ditch body is supported on the sand and gravel piling layer and connected with the top of the outer side partition plate. The structure is simple, the construction is convenient, and the long-time normal use of the frozen soil roadbed can be ensured.
Owner:SOUTHWEST JIAOTONG UNIV +1

Water permeable brick as well as brick surface treatment process and polishing equipment thereof

The invention belongs to the technical field of grinding, particularly relates to a water permeable brick and a brick surface treatment process and grinding equipment thereof, and provides the following scheme aiming at the problems that in the prior art, only one surface can be ground at a time, the efficiency is low, and a positioning clamping groove cannot be ground in the grinding process: the water permeable brick comprises a worktable, and a water tank is arranged at the bottom of the worktable; a grinding disc is rotatably arranged at the top of the workbench in a penetrating mode, a motor is arranged at the bottom of the workbench, and one output end of the motor is in transmission connection with the grinding disc through a gear and used for driving the grinding disc to rotate; a motor drives a grinding disc to rotate to grind the bottom of a water permeable brick, meanwhile, a first electric push rod drives a clamping plate to move to clamp a brick body, a second electric push rod drives a chassis to move in a lifting mode, and a transmission assembly is matched to achieve movement of a grinding frame, a first grinding block and a second grinding block; and the outer wall and the bottom rectangular opening of the water permeable brick are polished, manual overturning for sequential polishing is not needed, and the polishing efficiency is improved.
Owner:JIAXING GUOXIU ENVIRONMENTAL PROTECTION BUILDING MATERIALS CO LTD

Multi-layer concrete block for a paving, as well as paving and method for producing a concrete block

The invention relates to a concrete block in the form of a planar element that can be laid in combination in order to create a paving. The concrete block has at least one multi-layer concrete block body having at least one concrete-block lower face suitable for being laid on a foundation layer of an underlying surface, and a concrete-block upper face opposite thereto. The multi-layer concrete block body has at least one first concrete-block layer disposed on the concrete-block upper face and in the form of a face concrete layer, at least one second concrete-block layer in the form of a core concrete layer, as well as a third concrete-block layer. The second concrete-block layers is disposed between the first and the third concrete-block layer. The third concrete-block layer has an increased tensile strength.
Owner:GODELMANN GMBH & CO KG

Road gutter inlet grate structure convenient for municipal management

The invention discloses a road gutter inlet grate structure convenient for municipal administration, the road gutter inlet grate structure comprises an upper grate, a lower grate structure and an adjusting mechanism, the lower grate structure comprises louver boards, and two adjacent louver boards are engaged with each other; a plurality of transmission gears are arranged at each end of the louver boards side by side, and wheel shafts of the transmission gears are rotationally connected with the side wall of the gutter inlet; the adjusting mechanism comprises a power source and a driving shaft, a pair of driving gears are arranged at the two ends of the driving shaft, racks meshed with the driving gears are arranged in a pair of side walls of the gutter inlet, and a rack meshed with the driving gears is arranged above each row of transmission gears. The grate structure is of a double-layer structure, and the upper grate is fixed to the gutter inlet and can intercept sundries and bear loads. In non-rainy days, the louver boards are connected together and can seal the gutter inlet, so that the behavior of pouring garbage into the gutter inlet disorderly by merchants is fundamentally eradicated, and a certain safety protection effect is achieved; in rainy days, the adjusting mechanism drives the louver boards to rotate in the same direction at the same time, so that the lower grate is in an open state, and drainage is facilitated.
Owner:SIPPR ENG GROUP

Road slope earth shoulder drainage system

The utility model discloses a road slope earth shoulder drainage system which comprises a water outlet piece, an earth shoulder vertical curb water blocking belt, a transverse drainage pipe assembly, a longitudinal drainage pipe and a base. The water outlet piece and the earth shoulder vertical curb water blocking belt are arranged on the edge of a highway pavement and used for collecting water in a centralized mode. The base is embedded in a side slope; the longitudinal drainage pipe is arranged on the base, and the longitudinal drainage pipe is longitudinally arranged in the advancing direction of a road; one end of the transverse drainage pipe assembly is connected with the water outlet piece and the earth shoulder vertical curb water blocking belt, and the other end of the transverse drainage pipe assembly is connected with the longitudinal drainage pipe. The longitudinal drainage pipe is provided with a plurality of sections, and the plurality of sections of the longitudinal drainage pipe are communicated with one another and finally communicated to a rain sewage outlet point. The drainage ditch is suitable for the conditions that drainage of a highway embankment drainage ditch arranged by utilizing gravity flow is unsmooth, natural water systems on the ground surface are deficient or land use is limited and the like; according to the utility model, fewer water outlet points of a natural water system can be reasonably utilized to form a complete drainage system.
Owner:HARBOUR ENG DESIGNING INST CO LTD CCCC FOURTH HARBOR ENG G

Shallow permeable regulation and storage device and method thereof

The invention discloses a shallow layer water-permeable regulation and storage device which comprises a water-permeable paving unit which comprises a plurality of uniformly arranged water-permeable paving bricks and a water-permeable supporting grating fixedly paved on the lower sides of the water-permeable paving bricks; the shallow-layer regulation and storage unit comprises a shallow-layer regulation and storage pond arranged under the water-permeable supporting grid and a water-permeable supporting plate laid in the shallow-layer regulation and storage pond, and a plurality of sets of evenly-distributed supporting pieces are erected on the lower side of the water-permeable supporting plate and the inner wall of the lower side of the shallow-layer regulation and storage pond; the upper side wall of the water-permeable supporting plate is clamped with the water-permeable supporting grating through a plurality of groups of uniformly distributed supporting pieces; a shallow layer water-permeable regulation and storage method comprises the following steps that S1, during rainfall, rainwater penetrates through water-permeable paving bricks and enters a shallow layer regulation and storage pond, water in the shallow layer regulation and storage pond flows into a water purification tank, and the rainwater is collected. The water-permeable paving bricks do not need to be disassembled, the regulation and storage space module is automatically cleaned, and the cleaning step of the regulation and storage device is simplified.
Owner:JIANGSU JIANDA HUANQUAN WATER CO LTD