Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

56 results about "Junction point" patented technology

Junction points are a type of NTFS reparse point, internally represented as a mount point. They were introduced with NTFS 3.0, the default file system for Windows 2000.

Operation system and operation system control method

In an operation system (1) for a bus (5) including a connection point database which stores identification information of a magnetic marker (10) positioned so as to correspond to a connection point (13) between a dedicated lane (111) having magnetic markers (10) laid thereon and a general lane (112), the connection point (13) is set so as to correspond to the magnetic marker (10) according to identification information stored in a connection point database, thereby allowing flexibility in changing a route to be improved in the operation system which causes a vehicle to operate along a route defined in advance.
Owner:AICHI STEEL CORP

Instantiation method and apparatus for virtualised network function vnf

A method includes: A VNFM receives a first instantiation request from an NFVO, where the first instantiation request includes configuration information of a first virtual connection point of a VNF, and the configuration information of the first virtual connection point includes configuration information of K microservices of an NF corresponding to the VNF; further determines configuration information of a first ingress container object corresponding to the first virtual connection point, where the first ingress container object configured to provide an access ingress of the K microservices; and sends the configuration information of the first ingress container object to a CISM, where the configuration information of the first ingress container object is for creating the first ingress container object.
Owner:HUAWEI TECH CO LTD

Part replacement method, device and system and storage medium

The invention discloses a part replacement method, device and system and a storage medium. The method comprises the steps that an operation instruction for replacing an initial part through a target part is obtained; identifying a first mechanical connection point on the initial part; determining a second mechanical connection point corresponding to the first mechanical connection point on the initial part in the target part; and replacing the initial part with the target part according to the second mechanical connection point, and inheriting the contact attribute and the mechanical boundary condition of the initial part through the target part. By adopting the scheme provided by the invention, the first mechanical connection point on the initial part can be automatically identified according to the operation instruction, and the second mechanical connection point corresponding to the first mechanical connection point is determined in the target part, so that part replacement is completed, manual operation of an engineer is not needed, and the part replacement efficiency and accuracy are improved.
Owner:CHERY AUTOMOBILE CO LTD

Control method and device of holder equipment and storage medium

The invention discloses a control method and device of holder equipment and a storage medium, and the method comprises the steps: obtaining the coordinates of a junction point of a first region and a second region in a coordinate system of the holder equipment, and obtaining the holder coordinates of the junction point; planning a rotation configuration group of the holder equipment based on the holder coordinates of the junction point; and controlling the holder equipment to scan the first area or the second area according to the rotation configuration group. Through the above mode, the rotation configuration group of the holder can be automatically planned, and the scanning work of a specific area can be more efficiently realized.
Owner:ZHEJIANG PIXFRA TECH CO LTD

Construction drawing intelligent design optimization method and system based on parameterization

The invention relates to the technical field of parameterization modeling, in particular to a construction drawing intelligent design optimization method and system based on parameterization, and the method comprises the following steps: extracting boundary and annotation information, judging the orientation and affiliation relation of components, analyzing the coordinates of end points, adjusting the order of side lines, calculating the occupation offset, comparing the positions of intersection points, recognizing preorder nodes, and sorting. Extracting junction point distribution to judge a contact range and a connection relation, and determining a drawing page number by combining a component starting point and a path direction. According to the method, the spatial affiliation relation of the components is established through geometric boundaries and labeling information, the trend is adjusted according to the included angle difference value of side lines, the connection strength is recognized by combining the joint angle and the contact range, the drawing sequence is deduced according to the serial number sequence and the intersection point sequence, and the component combinations are continuously divided through attachment sections. The drawing page distribution is positioned based on the starting point of the component and the path direction, dynamic cooperation of component arrangement, sequence organization and drawing splicing is achieved, and the accuracy of component structure expression and the integrity of construction drawing generation are improved.
Owner:SICHUAN NEW DIPING ARCHITECTURAL DESIGN CONSULTING CO LTD

Electronic production equipment wiring method

The invention relates to the technical field of electronic production equipment wiring methods, provides an electronic production equipment wiring method, and aims to optimize connection paths among internal components of electronic equipment and improve wiring efficiency, overall performance, reliability and maintainability of the equipment. Comprising the following steps: S100, dividing an internal component into a plurality of modules according to the overall architecture and function requirements of equipment; s200, determining a connection relationship between the modules; s300, analyzing signal transmission requirements among the modules, and determining a starting point and a terminal point of wiring and components needing to be connected; s400, selecting a wire rod with a proper specification; s500, designing a test point; s600, simulation and optimization are carried out through wiring software; s700, wiring is carried out according to the optimized mode, and all connection points are ensured to be firm and reliable; and S800, after wiring is completed, testing the equipment.
Owner:OAT (HANGZHOU) INTELLIGENT MFG CO LTD

Method for automatically compiling assembly process procedure based on CATIA and EXCEL secondary development

The invention provides a method for automatically compiling an assembly process procedure based on CATIA and EXCEL secondary development, and the method comprises the steps: building a standard part library, compiling a procedure template, determining process connection information, selecting drilling and connection working conditions, and finally compiling the procedure according to the determined drilling connection point information. According to the method, by specifying the part drawing number, automatically screening the drilling connection information related to the specified part in the mathematical model and automatically counting the number of the standard parts, the time for selecting, copying, pasting and sorting by technicians is saved, the problems of missing selection, wrong selection and wrong counting of the number of the standard parts are solved, the one-time passing rate of regulation compiling is increased, and the working efficiency is improved. Wait waste in the production process is avoided, and the assembly efficiency is improved.
Owner:SHENYANG AIRCRAFT CORP

Embedded part generation method and device, computer equipment, storage medium and program product

The invention relates to an embedded part generation method and device, computer equipment, a storage medium and a program product, and relates to the technical field of embedded part generation. The method comprises the steps that in response to an embedded part generation instruction for a bearing component, component information of a target component indicated by the embedded part generation instruction and coordinates of a connecting point between the target component and the bearing component are obtained; the target component is connected with the bearing component through the generated embedded part; a target embedded part matched with the component information is screened out from the multiple candidate embedded parts; the connecting point coordinates serve as position coordinates of the target embedded part, component interference detection is conducted on the target embedded part based on the position coordinates, and a component interference detection result of the target embedded part is obtained; and when the component interference detection result shows that the target embedded part does not have component interference, generating a three-dimensional embedded part model of the target embedded part. By adopting the method, the generation accuracy of the embedded part can be improved.
Owner:CHINA NUCLEAR POWER TECH RES INST CO LTD

Package carrier with large corner connections and connection tip inspection feature

Carrier (100) for a wiring-free package (102), wherein the carrier (100) has a component mounting structure (104) for mounting an electronic component (106) on it and a plurality of terminals (108, 110) arranged around at least a part of the component mounting structure (104), wherein corner terminals (108) of the terminals (108, 110) are arranged closer to at least one corner (112) of the component mounting structure (104) than intermediate terminals (110) of the terminals (108, 110) that are further from the at least one corner (112) than the corner terminals (108), wherein the corner terminals (108) have a greater width (L) along a respective edge (114) of the component mounting structure (104) compared to have a smaller width (1) of the intermediate connections (110),and wherein at least the corner connections (108) have a connection tip inspection feature (116).
Owner:INFINEON TECHNOLOGIES AG

APP development platform, APP development method and electronic device

The present application discloses an APP development method and an APP development platform, the method comprising: a user selects a component from a component toolbox, and an APP development platform is installed in an electronic device. The component layout designer can create components and display the composition of the components. The components can consist of a component body and one or more connection point components, and the connection points support one or more data entity types. The user connects the first component and the second component in the interface of the component layout designer; in response to the operation, the component design layout connects the first component and the second component; the user selects to compile the connected components in the component layout designer, and in response to the operation, the code generation engine compiles the multiple connected components displayed in the component layout designer into the executable code of the APP. In this way, developers can use multiple existing components to quickly combine into the APP that the user needs to develop, without having to write program code one by one to implement the functional logic of the APP.
Owner:HUAWEI TECH CO LTD

Method for non-destructively testing a connection point in a component assembly

The invention relates to a method for non-destructively testing a connection point (10) in a component assembly, comprising a base layer (14), at least one cover layer (16), and a connection element (12a, 12b) with a head (18a, 18b) and a shaft (22a, 22b). The connection point (10) is formed between the shaft (22a, 22b) of the connection element (12a, 12b) and the base layer (14), and the cover layer (16) has a thermal conductivity which is greater than that of the base layer (14) and the connection element (12a, 12b). The test is carried out by means of a thermal imaging camera (34) and an inductor (36) which is arranged on the component assembly side opposite the thermal imaging camera (34). The inductor (36) is inductively excited by means of a pulse via an active surface of the base layer (14) at an excitation time. Furthermore: • at a first detection time, a reference image of the connection point (10) is captured by the thermal imaging camera (34), the head (18a, 18) being imaged in said reference image as a head surface area (20a, 20b); • at a second detection time (44), a test image which is analogous to the reference image is captured, said second detection time (44) occurring after the first detection time and a specified duration after the excitation time; • an analysis region (42) is defined in the test image and / or in the reference image, wherein the analysis region (42) at least partly comprises the head surface (20a, 20b), and the analysis region (42) is divided into sub-regions, in particular pixels, said sub-regions being assigned a temperature value; • a temperature change value is formed using a rule on the basis of the temperature values of the corresponding sub-regions of the reference and test image; • on the basis of the temperature change value, an "OK" value is formed if the temperature change lies in a pre-defined temperature interval with at least one lower boundary; and • the connection point (10) is classified in that the sum of the sub-regions with an "OK" value is compared with a reference interval with at least one specified lower interval boundary. The connection point (10) is classified as an "OK" connection if the sum lies in the reference interval, otherwise the connection point (10) is classified as a "not OK" connection.
Owner:EJOT SE & CO KG

Method for protecting contactor and corresponding contactor

The contactor (2) comprises a main switch (10) connected between an upstream connection point (6) and a downstream connection point (8), and the main switch is connected in parallel with an assembly (16) comprising a secondary switch (20) connected in series with a unidirectionally conductive member (18). The computing unit (30) is configured to receive the switching command, control an opening and / or closing sequence of the primary switch and the secondary switch, the secondary switch being closed during a time range for processing the switching command, the primary switch operating when the secondary switch is closed. The computing unit monitors the voltage level at the intermediate point (28) and detects a fault of the secondary switch and commands the main switch to close when the voltage level exceeds a predetermined first voltage threshold outside the switching command processing time range.
Owner:SCHNEIDER ELECTRIC IND SAS

Method and apparatus for setting layer connection point in multi-layer quantum chip, electronic device, multi-layer quantum chip, computer readable storage medium, and computer program product

A method and apparatus for setting a layer connection point in a multi-layer quantum chip, an electronic device, a multi-layer quantum chip, a computer readable storage medium, and a computer program product. The method comprises: acquiring a first position of a layer connection point to be set on a target layer; acquiring a first tree, wherein in the first tree, each leaf node corresponds to a first graph of one component on the target layer, and each non-leaf node comprises a first number of sub-nodes and corresponds to a second graph of the first number of sub-nodes on the target layer; on the first tree, determining a first path from a root node downwards, wherein each node on the first path and the first position meet a first relationship; and setting the layer connection point to the first position on the basis of a second relationship between the leaf node on the first path and the first position.
Owner:TENCENT TECHNOLOGY (SHENZHEN) CO LTD

Instantiation method and apparatus for virtualized network functions (VNFs)

This application relates to the field of NFV technology and discloses an instantiation method and apparatus for a virtualized network function (VNF). The method includes the steps of: a VNFM receiving a first instantiation request from an NFVO, the first instantiation request including configuration information of a first virtual connection point of the VNF, the configuration information of the first virtual connection point including configuration information of K microservices of the NF corresponding to the VNF; further determining configuration information of a first ingress container object corresponding to the first virtual connection point, the first ingress container object being configured to provide access ingress for the K microservices; and sending the configuration information of the first ingress container object to a CISM, the configuration information of the first ingress container object being for creating the first ingress container object. In this way, an ingress container object can be created for the microservice. The access address of the microservice defined using the ingress container object can be a domain name (e.g., FQDN), so that the access requirements of the microservice can be met.
Owner:HUAWEI TECH CO LTD

Data full-flow vulnerability collection method and device, equipment, storage medium and product

The invention provides a data full-flow vulnerability collection method and apparatus, a device, a storage medium and a product. The method comprises the steps of obtaining a historical work record; the historical work record comprises work stage time sequence information of the target object; based on the working stage time sequence information of the target object, determining the proportion of target junction points in each preset time period; the target handover point is a handover time point between a following stage and a previous stage of the following stage in the historical work record, and the following stage is a stage following the current stage of the target object in the historical work record; predicting the next stage of the target object from a plurality of following stages based on the proportion of the target intersection points in each preset time period; and when the current stage is completed, performing data full-flow vulnerability collection on the target object by adopting the predicted vulnerability scanning tool corresponding to the next stage. According to the method, more matched vulnerability scanning tools can be used in different stages of the target network and the system, and the overall vulnerability scanning effect is improved.
Owner:CHINA MOBILE GRP QINGHAI CO LTD +1

Code-free power management cluster design system and method

The present invention relates to a system and method for designing a power management cluster in a code-free manner, the system comprising at least one processor for executing at least one instruction for generating a power instance based on power component information; instructions to generate a reset controller instance disposed at a front end of the power instance and delivering a reset output to a target including the power instance; instructions to set first connection point information between the target and the reset controller instance; an instruction to generate a reset test controller instance including a test mode test data register block corresponding to the reset controller instance and a test control test data register block; an instruction for setting information of a second connection point between the reset controller instance and the reset test controller instance; instructions to generate hardware code based on the power instance, the reset controller instance, the first connection point information, the reset test controller instance, the second connection point information, and hardware code logic.
Owner:ITDA SEMICON CO LTD

DSL fault location

A method of determining the location of a disconnection on a digital subscriber line, in particular a VDSL line, where the line has a number of nodes or connection points along it. A statistical model is generated from a population of lines that maps the loop (line) lengths of each of those lines obtained by line test measurements (such as single ended line test traces—SELT traces) against the corresponding loop lengths obtained from inventory data. The model is then used to determine a predicted loop length by mapping a measured loop length (taken from line test measurements) onto an inventory loop length using the model. Knowledge of the node positions on the line is then used to give a probability a line disconnect occurring at a given node by mapping the predicted loop length onto the node positions.
Owner:BRITISH TELECOM PLC

Database System Including Query Operations Having a Tree Structure

A set of processing core resources of a database system is operable to receive a query regarding a dataset. The query includes query operations organized in a tree structure. A section of the tree includes a set of branches having a common connection point. The set is operable to, for the section, set a first execution indicator to a pause mode value. The set is operable to set a second execution indicator to an execution mode value. The set is operable to execute the second set of query operations to produce a second partial query resultant. The set is operable to, when the second branch is substantially completes, send an end of file signal to the third set of query operations. The set is operable to, in response to the end of file signal, change the first execution indicator to the execution mode value and execute the first set of query operations to produce a first partial query resultant.
Owner:OCIENT HOLDINGS LLC

Branch equipment connection method and device, computer equipment and storage medium

The invention relates to a branch equipment connection method and device, computer equipment, a storage medium and a computer program product. The method comprises the following steps: in response to a branch device insertion event for a target access device, determining a device connection point of the target access device; determining a target main pipe section of the target access device from the candidate main pipe sections according to the device connection points and branch device insertion points on the target main pipe section; determining branch equipment setting parameters of branch equipment of the target access equipment on the target main pipe section based on a main pipe upstream endpoint and a main pipe downstream endpoint corresponding to the branch equipment insertion point on the target main pipe section; and inserting the branch equipment at the branch equipment insertion point according to the branch equipment setting parameters, and connecting the branch equipment with the target main pipe section and the equipment connection point respectively. By adopting the method, the branch equipment connection efficiency in a multi-split system design scene can be improved.
Owner:GREE ELECTRIC APPLIANCE INC OF ZHUHAI

Simulation modeling anti-overlapping multi-connection method, device, equipment and readable storage medium

The present application discloses a simulation modeling anti-overlapping multiple connection method, device, equipment and readable storage medium, the method includes: establishing a plane coordinate system according to the position of each component rectangle, then determining a target rectangle surrounding all component rectangles, then arbitrarily selecting two component rectangles, and selecting a point on the edge of the two selected component rectangles respectively as the first and second connection points, then dividing multiple horizontal and vertical lines on the target rectangle based on the two connection points to form a grid covering all component rectangles, obtaining each intersection point divided by the grid, and determining the connection path between the first and second connection points according to the candidate distance between each candidate intersection point adjacent to the current intersection point and the second connection point. Then, multiple connection paths can be obtained for the component rectangles in groups of two by two, and for the connection paths with overlap, the grid can be re-divided based on the first and second connection points to obtain new intersection points, and then a new connection path can be determined according to the new intersection points.
Owner:ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD

Substation prefabricated cabin deployment method and device, storage medium and computer equipment

According to the substation prefabricated cabin deployment method and device, the storage medium and the computer equipment provided by the invention, the full-system function baseline test is executed in advance in the factory prefabrication stage, the reference data is generated, and the electronic file containing the accurate process parameters is created for each key connection point; therefore, the subjective experience judgment of the assembly quality is converted into objective data control from the source, and the traceability of the assembly data is realized at the same time. In the on-site assembly link, related machines can be controlled to execute standardized operation according to parameter information in an electronic file, particularly, accurate quantitative control over key procedures such as bolt fastening is achieved, and contact resistance and overheating risks caused by improper torque are eradicated. After assembly is completed, through automatic comparison verification of field test data and reference data tested during preassembly, any assembly deviation or performance degradation can be rapidly identified and positioned, so that the long-term operation reliability of the prefabricated cabin of the transformer substation is improved, and the fault risk is reduced.
Owner:FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID

Plc programming graphical user interface for electronic devices

1. The name of the design product: PLC programming graphical user interface for electronic device. 2. The use of the design product: for displaying PLC programming interface information. 3. The design points of the design product: the graphical user interface in the screen. 4. The picture or photo that best shows the design points: front view. 5. The rear view is omitted as it is a conventional design; the left view is omitted as it is a conventional design; the right view is omitted as it is a conventional design; the top view is omitted as it is a conventional design; the bottom view is omitted as it is a conventional design. 6. The use of the graphical user interface: the front view is the main interface displayed by the display screen of the display screen panel, in which the user clicks "I" in "select condition" on the left side, the interface jumps to interface change state diagram 1; in interface change state diagram 1, the user clicks "input port 01", the interface jumps to interface change state diagram 2; in interface change state diagram 2, the user clicks "Q" in "select result" on the right side, the interface jumps to interface change state diagram 3; in interface change state diagram 3, the user clicks "output port 01", the interface jumps to interface change state diagram 4; in interface change state diagram 4, the user clicks the blank position between the two dashed boxes, the interface jumps to interface change state diagram 5; in interface change state diagram 5, the user clicks "input port 02" on the left side, the interface jumps to interface change state diagram 6; in interface change state diagram 6, the user clicks "output port 02" on the right side, the interface jumps to interface change state diagram 7; in interface change state diagram 7, the user clicks "input port 02" in the middle position, the interface jumps to interface change state diagram 8; in interface change state diagram 8, the user clicks the "connection line icon" above, the interface jumps to interface change state diagram 9; in interface change state diagram 9, the user clicks the connection point on the right side of "output port 01" and the connection point on the left side of "input port 02" in the middle position, the interface jumps to interface change state diagram 10; in interface change state diagram 10, the user clicks the "connection line icon" above, the interface jumps to interface change state diagram 11. In interface change state diagram 11, the user clicks the "horizontal line" on the left side of "input port 02", the interface jumps to interface change state diagram 12, in which the user clicks the "connection line icon" above, the interface jumps to interface change state diagram 13, in which the user clicks the "connection line icon" above, the interface jumps to interface change state diagram 14.
Owner:BEIJING MELECHENG IOT TECH CO LTD

A Smart Testing Method for FPGA Interconnect Resources with Hundreds of Millions of Gates

This invention discloses an intelligent testing method for FPGA interconnect resources at the billion-gate level, belonging to the field of FPGA testing. The method involves identifying the module under test (DUT) of the internal interconnect resources of the FPGA; extracting its physical connection point information from the XDLRC resource file of the DUT; modeling and parameterizing the physical connection points, presenting the results in a graph dictionary; searching for the optimal routing path based on the graph dictionary, generating a configuration graph, and performing ATE testing to determine if the tested path has any faults. This invention extracts the FPGA's XDLRC resource file, analyzes the structural characteristics of the interconnects, and optimizes the modeling process based on the determinacy of the interconnect metal lines' positions, transforming the interconnect metal lines into points in a mathematical graph model. Compared to the previous modeling optimization, the modeling space is compressed by nearly 50%, and the routing search time is also reduced accordingly. An improved depth-first search algorithm is used, enabling the search function to be implemented with concise code, and parameterized information is added to the search dictionary object.
Owner:58TH RES INST OF CETC

A method for quickly previewing an empty three-point cloud report

The application discloses a method for quickly previewing an empty three-point cloud report, extracts connection point information in an empty three file, exports and saves the connection point information as an at_data.json file, loads the at_data.json file after downloading by a client, and displays the space of the point cloud of the corresponding task by using a three-dimensional engine display module, so that the point cloud report is previewed on the client. Since the at_data.json file occupies very small memory, the client can see the space and data of the corresponding point cloud with very few resources, and the preview is greatly facilitated.
Owner:SHENZHEN RENDERBUS TECH

Terminal connection structure

The utility model discloses a terminal connecting structure which comprises a first connecting piece and a second connecting piece, one end portion of the connecting piece is provided with a fastening assembly, and the connecting piece and the outer wall of the end portion of the second connecting piece are attached, enclasped and fixed through the fastening assembly. Compared with an existing welding mode, connection points are reduced, contact point loss is reduced, production procedures are reduced, compared with the welding mode, connection stability is not reduced, and in addition, a plating layer and corrosion resistance of a product can be prevented from being affected.
Owner:ZERUN CO LTD

Path planning method and nuclear power refueling robot

The invention discloses a path planning method and a nuclear power refueling robot. The method comprises the following steps: acquiring a starting point and a target point of a robot; determining a first junction point of the first working area according to the starting point and the type of the first working area where the starting point is located; determining a second junction point of the second working area according to the target point and the type of the second working area where the target point is located; according to the type of the working area passed by the robot from the starting point to the target point, determining a process junction point in each passed working area; generating a data map set according to the starting point, the first handover point, the process handover point, the second handover point and the target point; and determining a target planning path by adopting an A star algorithm according to the starting point, the first junction point, the process junction point, the second junction point, the target point and the data map set. Through the scheme provided by the embodiment, the movement continuity and the working efficiency of the nuclear power refueling robot under the complex working conditions can be improved.
Owner:BEIJING HELISHI CONTROL TECH CO LTD