Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

119 results about "Intensive management" patented technology

Intensive management (IM) programs are authorized under a specific procedure where the Alaska Board of Game determines a particular ungulate population important for providing high levels of human consumptive use and sets population and harvest objectives for deer, caribou, or moose in those specific areas.

No-obstacle parking charging system and method thereof

The invention relates to a charging system for automobiles and discloses a no-obstacle parking charging system, which comprises a cloud platform server, a plurality of parking lots being in data exchange with the cloud platform server through a network, a plurality of automobile owner terminal devices being in data exchange with the cloud platform server through the network, and a third-party payment system being in data exchange with the cloud platform server through the network. The invention also discloses a no-obstacle parking charging method, which comprises the following steps: S10, a member is registered; S30, an automobile enters the parking lot; and S40, the automobile is driven out of the parking lot. According to the system and the method disclosed by the invention, the time of passing through an entrance guard of the parking lot by the automobile is greatly saved, the process of parking charging is simplified, the operation efficiency of the parking lots is improved, and the parking lots are managed intensively through the cloud platform server, so that great convenience is brought to automobile owners.
Owner:陈淼

Service providing system, gateway, and server

A large-scale content delivery system may be achieved, which may send a large amount of contents without intensive management of the contents in the server. In a service providing system where a client, a service gateway, and a server are connected to each other through a network, the client sends a first message to the server by way of the service gateway. The service gateway inquires a processing method of the first message from the client of the server by using a second message that includes a part of the first message content. The server replies to the inquiry of the processing method from the service gateway with a program that describes the processing method, and the service gateway processes the first message from the client on the basis of the received processing method.
Owner:HITACHI LTD

Integrated Animal Management System And Method

The present invention relates to a system for the intensive management of animals, the system comprising: animal identification means for identifying individual animals; at least one device for measuring one or more parameters of individual animals; a processor for processing measurements obtained for the one or more parameters, wherein the processed parameter data is used to determine management strategies for individual animals in real-time; and means for implementing management strategies for the animals.
Owner:ROWE JAMES BABER +11

Individual credit reporting system establishment method based on block chain technology

The invention discloses an individual credit reporting system establishment method based on a block chain technology. Block encapsulation and distributed management are carried out on individual credit data information by utilization of features of the block chain technology, and the defect that a management center is heavy in load and low in efficiency under intensive management of an individual credit reporting system can be removed. Moreover, an RSA asymmetric cryptographic algorithm is applied to a block chain, the system is very difficult to break by traversing all possible keys, the security of the individual credit reporting system is greatly ensured, and illegal tampering of the credit data can be effectively avoided. According to the method, high-security distributed data sharing among multiple credit databases can be realized, establishment of an intensive individual credit management center can be avoided, and the credit reporting cost is reduced. According to a model system structure with the complete block chain, the method has very wide application prospect in the field of individual credit reporting.
Owner:HANGZHOU YUNXIANG NETWORK TECH

Vibroacoustic railway bridge healthiness monitoring apparatus, system and method

ActiveCN106442720AStreamline monitoring of field facilitiesOnline monitoring is simple but not simpleAnalysing solids using sonic/ultrasonic/infrasonic wavesFrequency spectrumStatistical analysis
The invention provides a vibroacoustic railway bridge healthiness monitoring apparatus, system and method. The monitoring apparatus comprises a sound collecting device and a communication treatment device, wherein the sound collecting device is used for collecting a sound spectrum generated in the vibration impact of a rail bridge by a wheel excitation source, and the communication treatment device is used for transmitting the sound spectrum; and the bridge healthiness monitoring system comprises the monitoring device and a cloud calculating server, and the sound collecting device is used for collecting the sound spectrum generated in the vibration impact of a rail bridge by the wheel excitation source and sending a signal to the cloud calculating server in real time. The cloud calculating server is used for storing and analyzing the sound spectrum; and the bridge healthiness monitoring method statistically analyzes the deformation of a bridge structure by using the transmission spectrum characteristics of sounds in the bridge structure on the basis of a sound monitoring and fault diagnosing technology and evaluates the bridge healthiness condition. The apparatus, the system and the method have the advantages of simplification of onsite bridge monitoring devices, engineering cost saving, and reduction of the maintenance workload of an online monitoring system through intensive management.
Owner:CHONGQING JIAOTONG UNIVERSITY

Quick checking method for life cycle asset of power asset

ActiveCN104200245ASolve problems that are time-consuming, labor-intensive, inefficient, and error-proneRealize triple linkageCo-operative working arrangementsIntensive managementHand held
The invention discloses a quick checking method for life cycle asset of power asset. The quick checking method for the life cycle asset of the power asset uses the mobile computing technology, RFID radio frequency technology, hand-held terminal equipment technology, information communication technology and other Internet related technologies to relate the life cycle asset data and check quickly so as to guarantee the real-time linkage of the accounts, cards and goods of the power asset, reinforce the basic fixed asset management, improve the financial intensive management level and lay a good foundation for the subsequent life cycle asset management. The quick checking method for the life cycle asset of the power asset perfects and improves the safety, effectiveness, precision, intensification and global performance of the asset management of the State Grid Corporation of China.
Owner:STATE GRID CORP OF CHINA +3

Electric power engineering design review and technical economic evaluation information system

InactiveCN105373885AImprove the level of intensive managementImprove Design ReviewsResourcesInformation repositoryEconomic management
The invention discloses an electric power engineering design review and technical economic evaluation information system. The electric power engineering design review and technical economic evaluation information system comprises a project review plan management module, a project review module, a province infrastructure project information database construction module, a design quality management module, an external user interaction management module, a main network engineering cost compilation system module, a cost analysis management module and a message management module. The system integrates demands of actual engineering project design review and technical economic management works, makes engineering project design review and technical economic management works have great improvement in standardization, unification, normalization and refinement, greatly improves an intensive management level, effectively and practically improves efficiency of engineering project design review and technical economic management works and brings about substantial economic and social benefits.
Owner:STATE GRID FUJIAN ELECTRIC POWER CO LTD +2

System and method for managing electric power overhauling tools

The invention discloses a system for managing electric power overhauling tools. The system for managing the electric power overhauling tools comprises RFID labels, an RFID reader, a user identity recognition unit, an input unit, a storage unit, a central processing unit and an output and display unit. The matching relation between overhauling tasks and the overhauling tools is set in the central processing unit, and lists of the needed overhauling tools can be selected automatically according to different overhauling tasks. The invention also discloses a method for managing the electric power overhauling tools. The method comprises the steps of user management, tool management, label management and task management. According to the system and method, reasonable overhauling tool lists can be selected automatically according to different overhauling tasks, the tools can be checked rapidly and reliably, intensive management of the tools is achieved, the problems that people forget to bring the overhauling tools, bring the tools mistakenly and additionally, lose the tools and the like are solved, and the working efficiency and the working quality are improved.
Owner:STATE GRID CORP OF CHINA +1

Public network service system for creative industry park

The invention discloses a public network service system for a creative industry park, and the general logic framework of the system employs a b / s mode. The system comprises an infrastructure layer, a resource layer, an application supporting layer, an application system layer, and a user layer. The resource layer comprises a unified data center achieving a function of network service, and the unified data center comprises a park geographic information theme database, an integration information publishing theme database, an incubation service theme database, a finance service theme database, a technical service theme database, a cultural exchange theme database, and a projection application theme database. The application system layer comprises an integration information publishing platform, a technical service platform, a cultural exchange platform, a finance service platform, a business incubation platform, and a display popularization platform. The system takes the network as the main body, builds an information communication bridge among all departments of a government, a service mechanism and an enterprise, and prompts the sharing and intensive management of resources of the creative industry park.
Owner:HUBEI VISIMPACT TECH

Method for establishing power supplier evaluation model

The invention relates to a method for establishment, in particular to a method for establishing a power supplier evaluation model. The method includes the three main steps of designing a supplier comprehensive evaluation index system, determining a comprehensive weight vector based on an analytic hierarchy process and by introducing a factor analysis method, and calculating a supplier comprehensive evaluation value by a fuzzy comprehensive evaluation method. The method proposed by the invention for establishing the power supplier evaluation model not only considers the subjectivity of the comprehensive knowledge of group experts, increases the diversity of the system, but also considers the practicality and objectivity of the index data, and corrects the deficiencies of a traditional fuzzycomprehensive evaluation method, making the whole evaluation system more reasonable. In addition, the method of the invention divides the supplier grade into nine different grades according to the supplier comprehensive score, can provide a certain reference for the bidding and procurement work of power companies, and promotes the intensive management and operation efficiency of the power companies.
Owner:TAIAN POWER SUPPLY CO OF STATE GRID SHANDONG ELECTRIC POWER CO

Method for tissue culture and rapid propagation of Trichosanthes kirilowii Maxim

The invention relates to the traditional Chinese medicine biotechnological field, in particular to a method for tissue culture and rapid propagation of Trichosanthes kirilowii Maxim, including six steps of configuration of culture medium, picking of explant and establishing of initial generation culture, successive generation propagation culture, strong stock rooting culture, transplantation of seedling in test tube and transplantation to land for growing field crops. By adopting the technical scheme of the invention, (1) as the seedling is completely deviated from the same plant, breed and hereditary characteristics are all the same, thus being convenient for rapid implantation propagation of improved breed; (2) growth of seedling is rapid and tidy and harvest period is almost the same, thus being beneficial to intensive management and commercialization production; (3) plant diseases and insect pests of Trichosanthes kirilowii Maxim are greatly reduced, and cost investment is reduced; (4) by tissue culture and optimization, yield per mu of fresh Trichosanthes kirilowii Maxim fruit can reach more than 5000 kilo grams (increased by 2500-3500 kilo grams), yield of dry Trichosanthes kirilowii Maxim fruits can reach more than 1000 kilo grams (increased by 500-600 kilo grams), and yield of radices trichosanthis can reach more than 1000 kilo grams (increased by 500-600 kilo grams).
Owner:杨保成

Transformer substation operation and maintenance integration field work data collection and field work instruction system

The invention discloses a transformer substation operation and maintenance integration field work data collection and field work instruction system. A hardware part comprises an intelligent terminal and a server-side. The intelligent terminal is used for collecting field work data, storing a knowledge base and results, uploading the data to the server-side, receiving work tasks from the server-side and giving out prompts. The server-side is used for receiving data information from the intelligent terminal, assigning the tasks to the intelligent terminal after storing the data information, generating a report and processing the report so as to instruct field work. By means of the transformer substation operation and maintenance integration field work data collection and field work instruction system, the problems that in the operation and maintenance integration achieving process, the number of personnel is small, the number of stations is large, technical supports are inadequate and current information can not be timely fed back or processed are effectively solved, real-time collection of the field work data and real-time instruction in the field work are effectively achieved, the construction requirement for 'four modernizations' is met, a field application based on a PMS is built, and the idea of 'three-intensive management and five-large-scale development' is put into practice.
Owner:STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY

Capital construction and production field management and control system and method based on Internet of things technology

The invention provides a capital construction and production field management and control system and method based on the Internet of things technology, and relates to the technical field of capital construction projects and safety production. The system comprises a management server, an identification module and a video monitoring module, wherein the identification module and the video monitoringmodule are in communication connection with the management server; the identification module includes an access control unit and a positioning unit, the access control unit is used for detecting information of the personnel going in and out of a field operation area; the video monitoring module is used for collecting video images of the field operation area; and the management server is used for triggering the positioning unit to perform real-time positioning on the personnel corresponding to the personnel information and carrying out intensive management on the personnel going in and out of the field operation area. The capital construction and production field management and control system and method provided by the invention based on the Internet of things technology can perform effective monitoring on the operating personnel and strengthen the field management and control of enterprises for capital construction and production management, thereby reducing violations, eliminating theoccurrence of accidents, and achieving the purposes of capital construction and safety production.
Owner:北京宇时易能科技发展有限公司

OPC UA multi-server aggregation method supporting cache management

ActiveCN108199897ATimely detectionSolve problems with high complexityData switching networksData informationIntensive management
The invention relates to an OPC UA multi-server aggregation method supporting cache management, and belongs to the technical field of industrial network. Aiming at an industrial control network whichadopts an OPC UA protocol, a multi-server aggregation method capable of integrating original server node information of a field layer is realized through design of an intermediate layer between a bottom-layer device and an upper-layer system. The method is composed of multiple components such as communication interface processing, aggregated data processing, management configuration and safety configuration, can perform intensive management on the information transmitted by the bottom-layer device and can provide seamless forwarding of data information upwards for OPC UA client through a formof an interface, so that the connection number of the client and the bottom-layer server is reduced to a certain extent, and convenience is brought to network deployment and maintenance. Meanwhile, the invention also provides a cache management method aiming at data aggregation; through an efficient server caching mechanism and a corresponding algorithm, the actual communication frequency of the upper-layer client and the lower-layer server is reduced, the communication efficiency is increased, and the communication expense is reduced.
Owner:CHONGQING UNIV OF POSTS & TELECOMM

Two-dimensional cable data based three-dimensional cable model generation method

The invention relates to the technical field of the power cable data processing, particularly to a two-dimensional cable data based three-dimensional cable model generation method. The two-dimensional cable data based three-dimensional cable model generation method comprises the following steps of collection and sorting of underground resource data; model generation which comprises establishment of a model base and generation of a cable chute model; model adjustment which comprises inspection and modification and improvement of error of the two-dimensional data and actual data; rendering of the model which comprises generation of an image through the adjusted model through a software. The two-dimensional cable data based three-dimensional cable model generation method has the advantages of solving problems that underground resource modelling requires ground breaking and material collection is limited; being fine in model accuracy and high in integrity; establishing technical bases for establishment of the three-dimensional model of equipment with data difficult to collect, improving the utilization rate of cable chute resources and achieving refined and intensive management of a cable chute.
Owner:YUNNAN POWER GRID +1

Remote intensive management and control system of unattended converting station automatic system

The invention relates to a working method of a remote intensive management and control system of an unattended converting station automatic system. The intensive management and control system comprises a remote virtualized module, a remote virtualized inspection module and a term adaptive access module. During working, the remote virtualized module is used for inspecting the entire converting station automatic system by using the remote virtualized inspection module and automatically displaying the state information of inspected equipment in real time; when equipment abnormity is found, the remote virtualized module is used for remotely starting / stopping hardware and software of corresponding equipment to realize remote management and control; meanwhile, the state information of inspected equipment is written into a polling log; and during remote management and control, various communication terms are identified automatically and are converted into a communication term according to characteristic codes in the communication terms specific to multiple pieces of equipment in which different communication terms are adopted, and start / stop of software and hardware is performed.
Owner:CHANGZHOU POWER SUPPLY OF JIANGSU ELECTRIC POWER +3

An electric power distribution network system based on a three-dimensional technology

The invention discloses an electric power distribution network system based on a three-dimensional technology. The system comprises a three-dimensional virtual simulation system, a three-dimensional geographic information system and a computer automatic mapping system, virtual design of a newly-built power distribution network is carried out in a three-dimensional simulation space environment, and / or virtual existing power distribution network and multi-target analysis strategy and optimization are / is rapidly generated, and multi-style display and output are carried out in different layers, the system is used for power distribution network engineering design and operation and maintenance work. An electric power distribution network facility three-dimensional application system is established; Multiple professional intensive management such as distribution network scheduling, Monitoring and transporting party, automation and first-aid repair are achieved; effective basic data guaranteeis provided for constructing a power distribution network regulation and control integrated system supporting platform, the urban power distribution network construction condition is displayed more visually, and a virtual office platform is established for electric power facility maintenance, equipment digital unified management, guidance of future planning and development of the power distribution network and the like.
Owner:仙居县恒信电力有限公司 +2

Tri-mesa electronic rail weigher system and its data processing method

This invention provides one three-desk electronic track weighting system and its data process method, wherein the system comprises weighting desk, data process unit. The weighting desks are three parts as left, middle and right one to get the train weight signals. The said weighting desk comprises desk part, column sensor, signal anti-lighting device, data collection card, wherein the data process unit is of imbedded system to process the train weight measurement signals. The said data transmission unit is to connect each weight desk and data process unit for transmission.
Owner:TIEDA TECH DEV BEIJING

Cutting method for lavenders

The invention provides a cutting method for lavenders. The cutting method includes the following steps that first, grass-charcoal earth, vermiculite and countryside soil are evenly mixed to serve as a cutting medium, and then the cutting medium is loaded into nutrition cups respectively, watered thoroughly through 100-fold carbendazim, disinfected and sterilized; cutting branches are selected and treated; cutting is performed; seedlings are hardened; seedling emerging is performed; when the cutting seedlings grow to have three or more lateral branches, the seedlings can emerge to be transplanted to a field after root systems huddle. Compared with the prior art, the temperature of the cutting environment is controlled to be about 25 DEG C, humidity is controlled to be above 75%, and therefore the survival rate of cutting reaches about 90% for the lavenders. Intensive management is adopted, so that management is convenient; the cutting method is not affected by weather and is high in automatic control; the occupied area is small; the age of the seedlings is shortened, and seedling-cultivating time is shortened.
Owner:SICHUAN ZIYINGTIANTANG VANILLA TECH DEV CO LTD

Control system for enterprise data performance assessment

The invention provides a control system for enterprise data performance assessment. The control system comprises a database server and a terminal device connected with the database server through an interface; and the control system is arranged on the database server and the terminal device. Under the support of integrated data of process analysis, all-staff data performance assessment of interaction information sharing between links of a whole process is realized. The control system has remarkable characteristics that project indicators are set for positions and can be quantified, so that actual work performance of staffs can be best reflected; indicator data sources are convenient, objective and fair, without interference of human factors; through a performance assessment system, production is standardized, power is restricted, responsibilities are fulfilled, and working enthusiasm is improved, so that intensive management is realized; the incompleteness of human factors and data andthe lag of time in performance assessment of management by men in a vertical management system are effectively overcome; and effective management of enterprise human resources by an enterprise resource plan (ERP) system is enriched.
Owner:顾悦

Service providing system, gateway, and server

A large-scale content delivery system may be achieved, which may send a large amount of contents without intensive management of the contents in the server. In a service providing system where a client, a service gateway, and a server are connected to each other through a network, the client sends a first message to the server by way of the service gateway. The service gateway inquires a processing method of the first message from the client of the server by using a second message that includes a part of the first message content. The server replies to the inquiry of the processing method from the service gateway with a program that describes the processing method, and the service gateway processes the first message from the client on the basis of the received processing method.
Owner:HITACHI LTD

Efficient cleaning method for dustbin

ActiveCN105800200AAccurate cleaningSolve the problem of human resources overall arrangementRefuse receptaclesRelevant informationLoad time
The invention discloses an efficient cleaning method for a dustbin. When the capacity or the weight of the dustbin reaches a preset value, the dustbin actively sends full-load data to a server, after the server obtains relevant information of the dustbin through inquiring, the most suitable cleaner is found out according to an optimal cleaning algorithm, and the cleaner is informed in a message pushing mode and a short message sending mode; after receiving information, the cleaner arrives at the scene to disposal garbage, and timely cleaning of the garbage is ensured; and after the dustbin is cleaned, the difference between full-load time and cleaning time is calculated by the server, and grading is conducted according to a set assessment criterion. Through intelligent dispatching of cleaners, overall arrangement of manpower resources of a property management company is achieved, work is more balanced and efficient, manpower and material resource cost is reduced, intensive management is achieved, and the social requirements for low carbon and environment protection are met; an environmental sanitation department can supervise the property management company, the property management company can supervise the cleaners, work efficiency and enthusiasm of the cleaners are improved, and the appearance of a city is tidier.
Owner:XUZHOU WONDERFUL INFRASTRUCTURE MFG

Data service management system and method

The invention discloses a data service management system and method. An operator adds a definition of a data service resource in the data service management system, carries out preview and publishing and allows access to the definition; a calling end calls an agency layer, transmits a data resource ID and text parameters; the agency layer calls a data service public interface through a client API; the data service management system calls a corresponding bottom-layer service according to the transmitted data resource ID so as to access a database according to definition information of the data resource, and converts a result into a corresponding data structure; the data service management system records a calling process, counts the calling efficacy, encapsulates the data structure into a uniform result data structure and returns the structure to the agency layer; and the result is fed back to the calling end for analysis, and contents are returned for subsequent business processing. The data service management system realizes intensive management of the service resource; a configuration mode is provided for defining the data service resource; and the the interaction standardability and stability are improved.
Owner:重庆车杰盟科技有限公司

Knowledge management system based on full life cycle integrated knowledge experience information

The invention discloses a knowledge management system based on full life cycle integrated knowledge experience information. The system comprises a detection and identification module which is used forproviding various attribute information of data in the design purchasing stage of a nuclear power plant; a screening and classifying module which provides various attribute information of data in theconstruction debugging stage of the nuclear power plant; an analysis and evaluation module which is used for providing various attribute information of data in the operation maintenance stage of thenuclear power plant; an action measure module which is used for providing the information of measures or action types which should be taken immediately when the research and transformation stage experience information of the nuclear power plant occurs; a standard unified management module which is used for carrying out standard unified management on the knowledge experience information of each nuclear power plant according to the information provided by the detection and identification module, the screening and classifying module, the analysis and evaluation module, and the action measure module. According to the knowledge management system, the knowledge information between the design, the construction, the operation and the retired can be shared, the existing information sharing barriersare removed, interconnection and interworking of information channels are guaranteed, and standardized and intensive management and control of the knowledge information are achieved.
Owner:SUZHOU NUCLEAR POWER RES INST +2

Method for distributing and recovering electric power overhaul tool

InactiveCN104616108AHelp with coordinationHelps standardize managementResourcesRecovery methodIntensive management
The invention discloses a method for distributing and recovering an electric power overhaul tool. The method comprises the steps of distributing tasks to be overhauled; sending an unique task verification code to each worker; inputting the task verification code and identity information of the workers for verifying by a tool extracting system; automatically selecting the electric power tool according to the task content as requirement; distributing to related workers; recording the information of people picking the tool, the picking time and the tool information through a tool warehouse; marking that the tools are in lending state; automatically reminding the corresponding people in case that the tools are not returned timely; removing the corresponding lending state marking signal after a recovering system recognizes and examines the returned tools. With the adoption of the method, a reasonable overhaul tool list can be automatically selected according to different overhaul tasks; in addition, the tools can be quickly and reliably checked; therefore, the intensive management of the tools can be achieved; the reminding can be performed timely, and the tool recovering conditions can be verified, so that the problems such as missed carrying, carrying with wrong tools, carrying with excessive tools, and losing of the overhaul tools can be comprehensively solved, and as a result, the working efficiency and the working quality can be increased.
Owner:STATE GRID HENAN ELECTRIC POWER COMPANY ZHENGZHOU POWER SUPPLY +2

Method for judging fertilizing amount through oil tea leaf nutrients and application thereof

InactiveCN106069244AReduce adverse effectsReduce blindness in fertilizationHorticulture methodsCamellia oleiferaIntensive management
The invention relates to the technical field of agricultural planting, in particular to a method for judging the fertilizing amount through oil tea leaf nutrients and application thereof. The method comprises the first step of sample selection, the second step of sampling, the third step of treating, the fourth step of element measuring and the fifth step of result judging. The nutrition judging method provides a scientific basis for reasonable fertilizing of oil tea and formulation of cultivation intensive management measures, the loss of nutrient elements can be judged, the balance conditions among nutrients can be judged, the blindness of fertilizer application is reduced, the cost is saved, and the adverse effect on the soil is reduced. Practices prove that by means of the oil tea leaf nutrient judging method, the mu yield of an oil tea garden with balance fertilizer application is increased by 33% or above, and the difference between the yield of a bumper year and the yield of a lean year can be effectively reduced.
Owner:SICHUAN AGRI UNIV

Bulk commodity logistics management system based on a BPM automation technology

InactiveCN108629534ARealize the order closed loopRealize the whole process of visualizationLogisticsInformatizationIntensive management
The invention discloses a bulk commodity logistics management system based on BPM automation technology, which comprises the steps of carrying out business inquiry and order interaction with a clientside, and displaying a visual platform layer of the logistics service information through a web interface and a mobile terminal interface; managing full-life circle according to a pre-constructed order, calling a corresponding logistics service system, and tracking a feedback business platform layer in a real-time manner; carrying out intensive management on all the basic business data of the logistics service information and the logistics business system, and through automatic seamless butt joint technologies like EDI exchange, crawler technology, database direct connection, collaborating with a basic platform layer interactive with external clients, suppliers and the visual platform layer. According to the invention, an AWS / BPMS is used for realizing the informatization service taking the customer as the center, and the whole life cycle foreground framework is managed through the constructed order, and a background system is provided for completing the end-to-end message demand of the order under the order full life circle management requirement, so that order closed-loop, full-process visualization and fine logistics management can be realized.
Owner:QIAOYI LOGISTICS CO LTD

Method for cultivating cistanche tubulosa in greenhouse

The invention discloses a method for cultivating cistanche tubulosa in a greenhouse, belonging to the technical field of plant cultivation. The method comprises the following steps: cutting tamarix chinensis in the greenhouse in spring in the first year, simultaneously inoculating the cistanche tubulosa, and carrying out reasonable light warm water fertilizer management after inoculating; and digging the cistanche tubulosa medicinal materials in autumn in the next year or harvesting seeds after the tamarix chinensis bears fruits in spring in the third year, wherein, the cultivation condition after inoculating is natural illumination, the indoor temperature is 18-32 DEG C, and the soil water content is 50-70%. The cultivation method carries out intensification management in the greenhouse, and has the advantages of simple and convenient operation, high cistanche tubulosa vaccination rate, rapid inoculation speed, short production period, high yield, and no freeze injury in winter.
Owner:CHINA AGRI UNIV

Intensive management apparatus for checking path validity in time-sharing multiplexing network

An intensive management apparatus for managing a time-sharing multiplexing network, comprises: a path-information-creating unit for creating path information including a group identifier, termination information of terminating connection points, a path management number assigned to a path connecting the terminating connection points at which time slots in a communication apparatus are allocated and an allocated-time-slot number; a time-slot-allocating unit for creating time-slot-allocation information describing allocation of the time slots to a path identified by the path management number included in the time-slot-allocation information for each of the terminating connection points; a path-information-checking unit for forming a judgment on validity of each of a plurality of paths identified by the same group identifier assigned to a path-information group comprising pieces of path information describing the paths on the basis of the path information; and a result display unit for displaying results of the judgment on validity of the paths.
Owner:FUJITSU LTD

Method for intensively controlling interlocking order sending authority

The invention discloses a method for intensively controlling interlocking order sending authority. A control order sending authority management module is arranged inside an ATS-interlocking interfacemachine in a station ATS sub system; each ATS equipment is accessed into the ATS-interlocking interface machine in parallel, and the ATS-interlocking interface machine is accessed into the control order sending authority management module; and intensive management, on control order sending authority, of the control order sending authority management module is utilized, so that only one piece of ATS equipment has one control order sending authority at the same moment, and therefore, the authority conflict problem, on the same interlocking sub system, of multiple pieces of ATS subsystem equipment is solved; and moreover, multiple pieces of ATS equipment can be freely expanded in station environment.
Owner:SIGNAL & COMM RES INST OF CHINA ACAD OF RAILWAY SCI +4
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products