Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

402 results about "Resource planning" patented technology

Interference resource planning method based on knowledge graph and space-time diagram convolutional neural network, medium and equipment

The invention discloses an interference resource planning method based on a knowledge graph and space-time diagram convolutional neural network. A head entity, a relation and a tail entity gt; constructing an interference pattern decision knowledge graph in a triple form; constructing an interference pattern decision knowledge graph embedding representation model, and generating embedding features representing semantic association; constructing interference pattern decision knowledge fusion based on a multi-layer perceptron, and combining attribute characteristics of interference pattern decision with a historical space-time network interference efficiency evaluation sequence; constructing a space-time diagram convolutional neural network to model embedded features, extracting space correlation characteristics between nodes, capturing a time evolution rule of node attributes, and dynamically predicting interference efficiency; and reasoning an optimal interference pattern in combination with the interference efficiency prediction result and the real-time situation information of the target equipment. The method can effectively predict the interference efficiency evaluation of different interference devices, significantly reduces the prediction error of the interference efficiency evaluation, and improves the prediction precision and model stability.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Automatic resource planning method, system and equipment for hybrid cloud and medium

The invention discloses an automatic resource planning method, system and device for hybrid clouds and a medium, and the method specifically comprises the steps: determining a business change trend through employing a time sequence analysis algorithm, and obtaining a demand prediction model; obtaining dynamic resource demand parameters from the demand prediction model, judging a resource allocation proportion of the private cloud and the public cloud, and determining an initial configuration scheme of a cross-cloud resource pool; based on the initial configuration scheme, a reinforcement learning algorithm is adopted to optimize resource scheduling dynamics, and a real-time scheduling plan is obtained; specific parameters of resource allocation are extracted from the real-time scheduling plan, whether the requirements for safety and flexibility are met or not is judged, and a final scheduling instruction is determined; and based on the final scheduling instruction, generating a configuration script and an automatic deployment file for the cross-cloud environment by adopting a preset template engine. According to the method, the hybrid cloud resource delivery efficiency and the resource utilization rate are improved, and deepening and breakthrough of the hybrid cloud technology in enterprise application are promoted.
Owner:广州三七极耀网络科技有限公司

Initial allocation optimization method of water rights based on regret theory

The disclosure relates to a water resource planning method. An objective is to provide an initial allocation optimization method of water rights based on regret theory. A technical scheme is as follows: the initial allocation optimization method of water rights based on regret theory includes following steps: S1, basic data set preparation: collecting relevant data of regional society, economy, water conservancy and agriculture; S2, objective function setting: considering economic, social and ecological values of water resources utilization, determining three objective functions of maximum social benefit, maximum economic benefit and maximum ecological benefit; S3, constraint condition setting: a supply and demand balance constraint of a water resource and a water demand constraint of a water use department; S4, multi-objective optimization algorithm: using a second generation non-dominated sorting genetic algorithm (NSGA-II) as the multi-objective optimization algorithm; and S5, initial allocation scheme of water rights based on regret theory.
Owner:ZHEJIANG INST OF HYDRAULICS & ESTUARY

Simulation scheduling method and system combining static scheduling and centralized scheduling

The invention relates to the technical field of simulation scheduling combining static scheduling and centralized scheduling, and discloses a simulation scheduling method and system combining static scheduling and centralized scheduling. According to the simulation scheduling method and system combining the static scheduling and the centralized scheduling, pre-allocation and resource planning of tasks are carried out through the static scheduling, and the execution efficiency of periodic tasks is ensured. In combination with centralized scheduling, resource allocation is adjusted in real time in the simulation operation process, the phenomena of resource idleness and overload are reduced to the maximum extent, and dynamic optimization of resources is achieved. The execution sequence of key tasks is locked in advance by static scheduling, and the time constraint of deterministic tasks is ensured. The centralized scheduling can perform global coordination on burst tasks, adjust task priorities in real time and ensure timely response of the burst tasks, so that the real-time response capability of the simulation system is improved.
Owner:CHINA STATE SHIPBUILDING CORP LTD RESEARCH INSTITUTE 719

Data storage method, system and equipment for territorial resource planning and medium

The invention relates to the technical field of territorial resource data processing, in particular to a data storage method, system and device for territorial resource planning and a medium, and the method comprises the steps: carrying out the fragmentation processing of territorial resource data, and obtaining data fragmentation information; performing real-time analysis on the data fragment information to obtain hot data and cold data, performing synchronous replication processing on the hot data, and performing asynchronous replication processing on the cold data; obtaining memory state information, dividing the memory state information to obtain grading information, adjusting the grading information according to the hotspot data, and storing the hotspot data to a plurality of grading caches; the data access flow information is acquired in real time, the data fragmentation information is dynamically adjusted according to the data access flow information, and the distribution updating information used for updating the hot data and the cold data is obtained, so that territorial resources can be stably stored, the data consistency is improved, and the system reliability and the user experience are improved.
Owner:GUANGZHOU SIKAN SURVEYING & MAPPING TECH CO LTD

Multi-target geographic site selection optimization method and system based on improved NSGA-III

The invention relates to an improved NSGA-III-based multi-target geographic site selection optimization method and system, belongs to the technical field of optimization in business management and resource planning, and particularly relates to resource allocation and site selection decision making by using a calculation model. The technology aims to solve the problems of slow scheme convergence, non-uniform solution set distribution and low calculation efficiency when multi-target site selection is carried out under limited resources. According to the scheme, geographic space data is preprocessed, and an initial population representing different site selection schemes is generated; carrying out optimization iteration by adopting an improved NSGA-III algorithm, and calculating a plurality of objective functions such as coverage rate, normalized population density and medical service accessibility; and performing individual selection and population updating by utilizing improved reference point generation and vertical distance measurement. The method is mainly used for improving the efficiency and effect of commercial and municipal decisions such as urban planning, medical resource configuration, energy station layout and logistics network optimization.
Owner:HEBEI UNIV OF ENG

Resilient radio resource provisioning for network slicing

The present disclosure provides a resilient (radio) access network ((R)AN) slicing framework encompassing a resource planning engine and distributed dynamic slice-aware scheduling modules at one or more network access nodes, edge compute nodes, or cloud computing service. The resilient (R)AN slicing framework includes resource planning and slice-aware scheduling, as well as signaling exchanges for provisioning resilient (R)AN slicing. The intelligent (R)AN slicing framework can realize resource isolation in a more efficient and agile manner than existing network slicing technologies. Other embodiments may be described and / or claimed.
Owner:INTEL CORP

Multi-satellite parallel data transmission resource scheduling method based on genetic algorithm

The invention provides a multi-satellite parallel data transmission resource scheduling method based on a genetic algorithm, and belongs to the technical field of ground task management and control of spaceflight earth observation satellites. The method comprises the steps that historical data transmission resource use rules of all satellites are mined, and data transmission resource use rule models of all the satellites are established; in a data transmission resource scheduling process, each satellite generates a corresponding resource demand set according to a data transmission timeliness requirement, a priority degree and a data transmission resource use rule model of an important task, conflict resolution is carried out on a conflicting resource use demand set by utilizing a genetic algorithm, and a data transmission resource scheduling result is obtained through a multi-round parallel resource matching and conflict resolution process. The multi-satellite data transmission resource planning scheme is obtained, large-scale satellite data transmission resource scheduling is achieved, the large-scale remote sensing satellite group resource use efficiency is effectively improved, and the implementation rate of reconnaissance tasks is improved. According to the method, the data transmission resource distribution income among multiple satellites can be comprehensively planned, and the intelligent scheduling capability level of large-scale remote sensing satellite group resources can be effectively improved.
Owner:THE 54TH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY GROUP CORPORATION

Intelligent optimization system for enterprise resource planning

The invention discloses an intelligent optimization system for enterprise resource planning, and relates to the technical field of enterprise resource management, and the system comprises a data collection and preprocessing layer, a knowledge construction and reasoning layer, a risk early warning and decision support layer, and a resource scheduling and execution layer. According to the invention, a knowledge graph covering various resources of an enterprise and association relationships thereof is constructed by using preprocessed data through a knowledge construction and reasoning layer, a causal relationship network among the data is established, and meanwhile, an intervention effect evaluation unit combines an anti-factual reasoning result of a causal reasoning unit to evaluate the intervention effect of the enterprise. Quantitative evaluation is carried out on different resource pre-allocation intervention schemes, and a detailed evaluation report is output, so that an enterprise can perceive and take corresponding measures in advance before a risk occurs, and can select an optimal scheme according to a scientific evaluation result when a resource planning decision is made, thereby effectively ensuring stable operation of enterprise resources, and improving the resource planning efficiency. And the operation risk caused by the resource problem is reduced.
Owner:CAOFEIDIAN VOCATIONAL & TECH COLLEGE

Electric vehicle charging resource planning and optimizing method and system

The invention provides an electric vehicle charging resource planning and optimizing method, and aims to solve the problems of static performance, single target optimization, one-sided attraction evaluation, disjunction with traffic jam management and the like in existing planning. The method comprises the following steps: firstly, acquiring regional basic data, and establishing a charging station composite attraction evaluation model which comprehensively considers POI value, plot cost, estimated available charging pile quantity proportion and reputation parameters determined based on historical service data, so as to predict the probability of selecting each charging station by a user; and optimizing charging pile capacity configuration according to the predicted user selection probability and the total charging demand so as to minimize the combined cost of the construction cost and the average queuing waiting time of the users. The optimal charging site is screened and recommended through weighted aggregation of multiple indexes such as composite attraction, construction cost, queuing waiting time and the like. Scientific site selection and reasonable capacity configuration of the charging stations are achieved, urban traffic congestion is effectively relieved, balanced distribution of the charging flow is promoted, and the charging experience of users is improved.
Owner:SHANGHAI JIAOTONG UNIV +1

Land resource planning data real-time analysis system

The invention relates to the technical field of land resource analysis, in particular to a territorial resource planning data real-time analysis system, which comprises a resource dynamic change analysis module for collecting territorial resource planning data, establishing a territorial resource planning time sequence, extracting resource change characteristics of adjacent time points in the territorial resource planning time sequence, and analyzing the resource change characteristics; and identifying abnormal fluctuation points according to a preset change rate threshold value, and generating a territorial resource feature analysis result. According to the method and the device, the abnormal points in the resource fluctuation are identified, and unstable factors in the resource change are found in time, so that a basis is provided for prediction of the resource change trend. The method not only can capture the potential problem of over-development of resources or imbalance of supply and demand, but also can provide accurate data support for resource planning by analyzing historical and future resource change trends, and can effectively screen out high-risk resource regions and provide reference suggestions by evaluating resource risk regions and ranking priorities.
Owner:SHANDONG GAOCHENG NETWORK TECH CO LTD

Mine resource reserve dynamic management system based on multiple models and construction method

The invention discloses a multi-model-based mine resource reserve dynamic management system and a construction method, and belongs to the technical field of mine resource management, and the system comprises a model updating data module which is used for designing a data import tool or interface; the basic information module is used for recording and managing key information; the mine right management module is used for recording and managing mine right, environment and policy and regulation information of the mine; the geological exploration management module is used for recording and managing geological exploration activities; the reserve management module is used for generating a reserve report and dynamically updating reserve statistics; the resource planning management module is used for designing, adjusting and monitoring long-term and short-term planning of resources; the system management module is used for maintaining system operation and storing user and authority information; the three-dimensional large screen module is used for displaying a three-dimensional mineral resource model and data; the problems of insufficient real-time performance, low manual operation efficiency, lack of dynamic monitoring capability, insufficient intelligent degree, limited visualization degree and the like in mine resource reserve management are solved.
Owner:TIANJIN CEMENT IND DESIGN & RES INST CO LTD

Intelligent human resource planning method and system based on big data analysis

The invention discloses a human resource intelligent planning method and system based on big data analysis, and relates to the technical field of human resource management, and the method comprises the steps: collecting the work performance data and eye movement tracking data of employees in a simulation training environment; skill labels of the employees are extracted by using a natural language processing technology, a personal skill map is constructed, and advantages and shortages of the employees are analyzed; evaluating the ability level of the employee according to the personal skill map and the work performance data; according to the skill label of the employee, combining the ability evaluation result of the employee, intelligently matching a proper post, and planning the occupational path of the employee; a personalized training plan is intelligently generated according to the skill weakness and post requirements of the employees; the comprehensive human resource intelligent planning method is constructed by integrating big data analysis and natural language processing technologies, and many problems in the prior art can be effectively solved.
Owner:ZHONGYU DIGITAL TECH (BEIJING) CO LTD

Flexible resource planning method and system based on evaluation of adjustment capability of power distribution network

The invention discloses a flexibility resource planning method and system based on power distribution network regulation capability evaluation, and relates to the technical field of power distribution networks. Obtaining an electric vehicle charging demand, network access time and an electric quantity during network access based on the user behavior characteristics; establishing a day-ahead two-stage scheduling model with minimum net load fluctuation and minimum total operation cost; determining a day-ahead scheduling result through a day-ahead two-stage scheduling model, and constructing a flexible resource feasible region; establishing a power distribution network regulation capability evaluation model; and selecting the scheme with the highest adjustment capability to perform flexible resource planning. The method can reflect the adjustment potential of the resources in real time, considers the synergistic effect between different resources, provides more accurate and comprehensive adjustment capability evaluation, and comprehensively considers the adjustable space, the adjustment cost and the adjustment response speed of the power distribution network according to the evaluation result to perform planning and model selection of the flexible resources.
Owner:STATE GRID SICHUAN ECONOMIC RES INST +3

Interactive situation detection resource awareness and planning method and system

The invention belongs to the technical field of exploration resource planning, and particularly discloses an interactive situation exploration resource awareness and planning method and system, and the method comprises the steps: collecting and organizing exploration resources inside and outside a cluster in real time; acquiring situation information of the detection task and sensing target state information of a detection target in the detection task in real time according to the situation information; calculating and determining various relation information of the detection node and the detection target according to the node state information and the target state information; the detection task, the node state information, the target state information and the relation information are combined with a user input instruction and a first cooperation request to serve as input information, and the input information is input into a multi-mode large model for task understanding; the multi-modal large model is utilized to call a plurality of different professional models according to the task type of the detection task to generate the planning scheme in parallel, and the flexibility and efficiency of detection task execution can be improved.
Owner:709TH RESEARCH INSTITUTE CHINA STATE SHIPBUILDING CORP LTD

Water resource rigid constraint and balance control method based on double-layer nested configuration

ActiveCN118839926AForecastingWater resource planningWater source
The invention discloses a water resource rigid constraint and balance control method based on double-layer nested configuration. The method comprises the following steps that 1, regional units are divided, and economic and social characteristic parameters of the regional units in the future level are determined; step 2, calculating a water demand threshold value of each regional unit under a long-series annual efficient water-saving condition; 3, performing long-series calculation on the available water supply amount threshold value of each regional unit under the conventional and potential situations in the future level year; 4, carrying out the double-layer nested water resource supply and demand combination design of each regional unit in the future horizontal year; 5, performing double-layer nested multi-water-source multi-user multi-target water resource optimal configuration calculation; and step 6, adjusting future-level annual economic and social characteristic parameters of each unit and determining an optimal control scheme. The method provided by the invention has very strong practicability and operability, can provide quantitative technical support for accurate management decision of water resources, and has important guidance value for basin and regional water resource planning and water conservancy project construction and implementation.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

Modeling production processes to include intermediate products

Example methods and systems relate to the modeling of production processes to include intermediate products. An enterprise resource planning (ERP) system receives user input to define an intermediate product, and generates a master data record for the intermediate product. The ERP system further receives user input to include the intermediate product in a production model within the ERP system. The production model is associated with a real-world production process. The production model is updated based on the master data record to integrate the intermediate product into a sequence of activities. The sequence of activities comprises a first activity that produces the intermediate product and a second activity that consumes the intermediate product. The ERP system executes a production order based on the production model. Execution of the production order includes tracking state information of the intermediate product within the ERP system.
Owner:SAP SE

Quantitative calculation method for ecological water demand of natural vegetation in arid region based on remote sensing evapotranspiration model

PendingCN119089086AEcological water demand is accurate and reliableAccurate and reliable portrayalData processing applicationsGeneral water supply conservationSensing dataVegetation
The invention provides an arid region natural vegetation ecological water demand quantitative calculation method based on a remote sensing evapotranspiration model, and the calculation method comprises the steps: collection of basic data of a research region, collection and processing of long time sequence satellite remote sensing data, regional actual evapotranspiration calculation based on a model set, and actual evapotranspiration evaluation and verification. The method comprises the steps of calculation of a regional reference evapotranspiration ratio, calculation of a natural vegetation blue water evapotranspiration amount, water balance-based natural vegetation blue water evapotranspiration correction, calculation of a natural vegetation blue water evapotranspiration coefficient and calculation of a natural vegetation ecological water demand amount. By adopting the method, accurate calculation of the ecological water demand of the natural vegetation in the arid region can be realized, and the method has practicability and operability of regional application; the method can serve the business application fields of arid region water resource management, ecological protection and restoration, basin water resource planning, water resource optimal configuration and the like.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES

Close-range photogrammetry-based slag field earth-rock volume measuring and calculating device and method

The invention provides a slag field earth-rock volume measuring and calculating device and method based on close-range photogrammetry, and relates to the technical field of close-range photogrammetry. Comprising a photogrammetric device, the photogrammetric device is used for shooting image data of a slag field, the photogrammetric device comprises a digital camera, a tripod, a holder and a GPS and GNSS positioning system, and an image processing system is used for carrying out preprocessing, distortion correction, radiation correction and denoising processing on the shot image data. According to the technical scheme, by using the high-resolution camera and an advanced image processing algorithm, the device can more accurately capture details on the surface of the slag field, so that errors are reduced when a three-dimensional model is constructed, the high-precision three-dimensional model can more accurately reflect the actual shape and the volume of an earth-rock cube, and the accuracy of the three-dimensional model is improved. The calculation result of the earth-rock volume is more accurate, which is crucial for engineering management and resource planning because the method can reduce cost waste or resource shortage caused by inaccurate estimation.
Owner:WATER & SOIL CONSERVATION MONITORING CENT STATION OF YANGTZE RIVER WATER RESOURCES COMMISSION +3

Method and equipment for evaluating adaptability of ecological restoration of karst plants

The invention discloses an adaptability evaluation method and device for ecological restoration of karst plants, and belongs to the technical field of resource planning, and the method comprises the steps: inputting leaf parameters and root system parameters into a data table, carrying out the normality test of all indexes, and selecting a corresponding standardization method for data conversion according to the types of the indexes; based on the standardized data, identifying index correlation through principal component analysis, constructing a judgment matrix, calculating a feature value and a feature vector, and determining a weight coefficient of each evaluation index; calculating a comprehensive evaluation index of the sample plant by using the weight coefficient and the standardized data, dividing grades according to quartile, drawing a spatial distribution diagram and analyzing distribution characteristics; and establishing a multi-constraint integer programming model according to the evaluation grade and the spatial distribution characteristics so as to solve and determine an optimal configuration scheme through an algorithm. Through the scheme of the invention, a multi-dimensional evaluation system of ecological restoration resources can be constructed.
Owner:GUIZHOU ACAD OF FORESTRY SCI

Cloud resource data planning method and system based on time sequence prediction

The invention discloses a cloud resource planning method based on time sequence prediction. The method comprises the following steps of collecting cloud resource data and performing storage processing to form time sequence data; preprocessing the time sequence data according to a target to obtain processed data; constructing a training sample set based on the processing data; constructing a time sequence prediction neural network model ScaleMixer, and training the time sequence prediction neural network model ScaleMixer based on the training sample set to obtain a trend prediction model; performing analysis based on a prediction result output by the trend prediction model in combination with actual cloud resource data to obtain an analysis result; and generating a cloud resource planning report based on the analysis result and the historical cloud resource data, and planning the cloud resources. Multi-dimensional accurate prediction of future cloud resource demands is realized, and a self-adaptive cloud resource allocation strategy is generated in combination with demand scene features, so that resource supply and demand fluctuation are effectively balanced.
Owner:ZHEJIANG UNIV +1

Power grid resource planning method and system based on weak voltage region

The invention relates to the technical field of power grid resource planning, and discloses a power grid resource planning method and system based on a voltage weak region, and the method comprises the steps: obtaining a branch load flow calculation result according to the topological structure data and real-time load data of a power grid, calculating the current overload coefficient of a branch, and determining a heavy load branch; according to the voltage amplitude deviation of the load node of the heavy load branch, potential weak points are determined and aggregated to obtain a weak area, and the voltage stability margin of the weak area is calculated; obtaining a risk index of each potential weak point, calculating a risk level of the potential weak point according to the voltage stability margin and the risk index, and screening out a first weak point; calculating a resource matching degree between the regulation and control resource and the first weak point; and according to the risk level and the resource matching degree, establishing a resource planning model to obtain a resource planning scheme. According to the invention, through multi-dimensional risk identification, accurate resource matching and multi-scene strategy optimization, the accuracy and dynamic adaptability of resource planning are improved.
Owner:ECONOMIC & TECH RES INST OF STATE GRID HEILONGJIANG ELECTRIC POWER CO LTD +1

Large-scale complex correlation earth observation task planning method based on reinforcement learning

The invention discloses a large-scale complex correlation earth observation task planning method based on reinforcement learning, and relates to the technical field of task resource planning. The method comprises the following steps: acquiring historical data of earth observation task planning, and constructing a sample data set; constructing a graph neural network and a reinforcement learning network; using the sample data set to train the graph neural network and the reinforcement learning network at the same time; acquiring a demand information list, a satellite information list, a data transmission task information list and an observation information list, and processing the information lists into demand feature vectors, satellite feature vectors, data transmission task feature vectors and observation feature vectors; and inputting the four feature vectors into a trained graph neural network to obtain an environment feature vector, inputting the environment feature vector and the demand feature vector into a trained reinforcement learning network, and outputting an earth observation task planning result. The method can solve the scheduling optimization problem under the condition of multiple tasks and limited resources, improves the task planning efficiency, and can be widely applied to the fields of satellite task scheduling, intelligent manufacturing, automatic driving and the like.
Owner:THE 54TH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY GROUP CORPORATION

Natural resource planning text generation method and system and storage medium

The invention provides a natural resource planning text generation method and system and a storage medium, and relates to the technical field of data processing, and the method comprises the steps: building a grid partition unit in a feature space, and executing spatial clustering according to the feature vector distribution density; mapping the feature vectors to corresponding partition units, and generating a dynamic material pool containing spatial correlation attributes; generating a spatial reference outline of an outline structure based on the spatial association attributes; according to the spatial reference outline, positioning the content of the material pool by adopting a segmented writing strategy, and generating text paragraphs based on the feature weights of the partition units; performing structured processing on the text paragraph to obtain a text after structured processing; and executing dynamic verification on the text after the structured processing so as to output a final planning text. According to the spatial clustering mapping, the processing amount of redundant data is reduced, and computing resources are reduced.
Owner:ZHEJIANG WANWEI SPACE INFORMATION TECH CO LTD

Power system flexible resource planning method, system and device considering multi-time scale extreme weather, and storage medium

The invention discloses an electric power system flexible resource planning method, system and device considering multi-time scale extreme weather and a storage medium, and relates to the technical field of electric power system planning, and the method comprises the steps: generating a multi-time scale extreme weather scene based on a conditional diffusion model; constructing a flexible resource planning model of the mixed time scale power system; and calling a Gurobi solver by using a Yalmip toolkit of Matlab to solve the flexible resource planning model of the mixed time scale power system, and outputting an optimal planning scheme of flexible resources of the power system. According to the method, the multi-day extreme weather scene is generated based on the conditional diffusion model, spatial-temporal characteristics of multi-day extreme weather such as typhoon and high temperature can be accurately described, and compared with other methods, a diversified scene set with more statistical coverage can be reconstructed under limited historical extreme data; and a multi-time-scale operation scene basis with typicality and extreme property is provided for power system planning.
Owner:NARI TECH CO LTD +2

Information technology consultation management method based on big data

The invention relates to the technical field of resource planning, in particular to an information technology consultation management method based on big data, and the method comprises the steps: collecting a user generated text on a social media platform, recording a timestamp of the text, extracting the number of likes in the text, extracting the number of sharing in the text, and extracting the number of comments in the text. And summarizing the subject popularity data based on the text contents and the associated tags to obtain a social media data set. According to the invention, the enterprise can identify the market trend more accurately by recording the user interaction and the emotional response, so that the resource configuration and the strategy planning are optimized. For example, through classification of emotion scores and monitoring of emotion changes, enterprises can adjust market strategies in time so as to cope with emotion fluctuation of consumers and solve possible market crisis or grasp sudden market opportunities in advance.
Owner:LINYI CITY CLOUD BIG DATA CO LTD

Bandwidth resource planning method and device, computer equipment and readable storage medium

The invention relates to a bandwidth resource planning method and device, computer equipment and a readable storage medium. The method comprises the following steps: acquiring target resource information and reference bandwidth information of a bandwidth resource operator for a target node type, wherein the target resource information comprises region resource information of a plurality of regions corresponding to the bandwidth resource operator; generating an operator bandwidth resource planning result of the bandwidth resource operator for the target node type according to the target resource information and the reference bandwidth information; according to the operator bandwidth resource planning result, generating a regional bandwidth resource planning result of each region of the bandwidth resource operator for the target node type; and determining respective nodes of the plurality of regions under the target node type, and generating a node bandwidth resource planning result of the nodes of each region according to the region bandwidth resource planning result of each region for the target node type. By adopting the method, the accuracy of bandwidth resource planning can be improved.
Owner:CHINA TELECOM CLOUD TECH CO LTD

Resource management method of space-air-ground integrated Internet of Things system and related equipment

The invention discloses a resource management method and related equipment for an air-space-ground integrated Internet of Things system, and the method comprises the steps: making a resource planning decision at a first time scale, and generating a long-term scheme; and performing a resource allocation decision based on the long-term scheme at a second time scale far less than the first time scale to generate a short-term scheme. Then, a system overall user experience quality model is constructed according to the long-term and short-term schemes, and the model fuses user experience quality models of calculation-intensive and data transmission tasks; then, with the purpose of maximizing the overall user experience quality, a resource management optimization problem containing long-term and short-term scheme variables is constructed; and finally, solving and outputting an optimal scheme. The invention aims to solve the problems of low efficiency and poor adaptability of current resource management, especially the situation that in the prior art, when diversified requirements and complex constraints are dealt with, calculation bottlenecks exist, and resources are difficult to distribute finely.
Owner:XI AN JIAOTONG UNIV

Resilient radio resource provisioning for network slicing

The present disclosure provides a resilient (radio) access network ((R)AN) slicing framework encompassing a resource planning engine and distributed dynamic slice-aware scheduling modules at one or more network access nodes, edge compute nodes, or cloud computing service. The resilient (R)AN slicing framework includes resource planning and slice-aware scheduling, as well as signaling exchanges for provisioning resilient (R)AN slicing. The intelligent (R)AN slicing framework can realize resource isolation in a more efficient and agile manner than existing network slicing technologies. Other embodiments may be described.
Owner:INTEL CORP

Power distribution network distributed resource robust planning method and device based on cluster division

The invention belongs to the technical field of resource planning, and particularly relates to a power distribution network distributed resource robust planning method and device based on cluster division, and the method comprises the steps: building a source-storage robust locating and sizing model as an upper model based on cluster division, and setting a target function and constraint conditions thereof; based on cluster planning, constructing an intra-cluster reliability index calculation model as a lower-layer model, and setting a target function; combining the upper-layer model and the lower-layer model to obtain a double-layer joint planning model; aiming at an island operation scene under a cluster division condition, designing a reliability merging optimization method integrated with island operation characteristics, and optimizing the double-layer joint planning model to obtain an analytical expression of a reliability index; and obtaining a joint planning scheme of the distributed resources of the power distribution network by solving the optimized double-layer joint planning model. According to the method, the source load uncertainty and the reliability index are effectively considered, and the economical efficiency, the flexibility and the reliability of power distribution network planning are remarkably improved.
Owner:STATE GRID SHANDONG ELECTRIC POWER CO