By using prefabricated guides and anchors to construct anchor piles under high rapids, the problems of difficulty and long cycle of anchor piles in inclined bare rock areas are solved, and efficient and safe drilling platform construction is achieved.
Patent Information
- Application Number
- CN202411343250.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-12-03
AI Technical Summary
In the inclined bare rock area under high rapids, the steel pipe piles cannot provide sufficient force alone during construction, resulting in slow drilling speed, fast wear, long construction period, and insufficient anchoring effect in the hard rock layer. Ideal, requiring frequent inspection and re-construction, increasing construction time.
Prefabricated guide frames and anchors are used to throw anchors in the sea, and the barge transport guide frames to the design position. Steel pipe piles are inserted and temporarily locked through the guide frame to monitor stability, form a construction platform, and use a crane crane impact drilling rig to perform Anchor pile construction, temporary platforms are set up, and multiple working faces are constructed simultaneously to improve construction efficiency and stability.
It reduces the difficulty and cycle of anchor pile construction, improves construction efficiency, shortens the construction period of steel platform, ensures construction quality and safety, and solves the problem of long construction cycles in the existing technology.
Smart Images

Figure CN119061858A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of drilling platform construction, and in particular relates to a construction method of an inclined bare rock drilling platform under rapid flow and high flow conditions. Background Art
[0002] In coastal areas, mountainous areas, rivers and other areas with complex topography, construction conditions are more demanding. In these areas, due to the topographical features such as rapids, high waves and bare rocks, in this context, inclined bare rock drilling platforms came into being. This platform is a drilling equipment specially designed for construction under conditions of rapids and high waves. It can perform efficient and safe drilling operations in complex hydrogeological environments.
[0003] At present, for inclined bare rock geology under rapid flow and high flow conditions, most of the drilling platforms are constructed using steel platform construction technology. Specifically, multiple anchor points are first set on the bare rock surface, and then the steel frame structure prefabricated by steel pipe piles is installed on the anchor points. Then, according to the design requirements, the steel beams, steel columns and other components of the main structure are welded or bolted to form the main frame of the platform. Diagonal braces are installed on the main structure to increase the stability of the structure. High-strength bolts or other connectors are used to firmly connect the diagonal braces to the main structure. A certain thickness of steel plates are laid on the main structure as the working surface of the construction platform. Guardrails and safety nets are installed on the edge of the platform to ensure the safety of construction workers.
[0004] However, there are some problems in the current steel platform construction: in inclined bare rock areas, since steel pipe piles cannot provide the force required by the steel platform alone, anchor piles are used to anchor the steel pipe piles in the rock formation. However, the construction drill bit used in anchor pile construction usually drills slowly in the rock formation, especially when encountering hard rock formations. The drill bit wears faster and needs to be replaced frequently, which greatly prolongs the construction period. After the anchor pile construction is completed, the anchoring effect needs to be inspected to ensure that it meets the design requirements. If the inspection results show that the anchoring effect is not ideal, re-construction may be required, which will further increase the construction time. In this regard, a construction method for an inclined bare rock drilling platform under rapid flow conditions is proposed, which can effectively improve construction efficiency, reduce construction risks, and shorten the construction period of the steel platform. Summary of the invention
[0005] In order to solve the above-mentioned problems existing in the prior art, the present invention provides a method for constructing an inclined bare rock drilling platform under rapid flow conditions, which solves the problem that when the prior art uses anchor piles to anchor steel pipe piles in rock strata for anchor pile construction in inclined bare rock areas, the construction is difficult and the construction period is long due to the influence of the inclined bare rock geology.
[0006] The purpose of the present invention can be achieved by the following technical solution: A method for constructing an inclined bare rock drilling platform under rapid flow conditions, comprising the following steps:
[0007] S1: Prefabricate guide frames and anchors, drop four sets of anchors in the sea, and set a rock anchor on the shore;
[0008] S2: The barge transports the processed guide frame to the designed position and accurately positions it by anchoring;
[0009] S3: insert steel pipe piles into the rock in the guide frame, temporarily lock the guide frame and the steel pipe column through a temporary locking device at high water level, and remove the pad between the guide frame and the barge;
[0010] S4: Monitor the guide frame through measuring instruments to observe whether the guide frame is stable. If the displacement change of the guide frame under the influence of the rising and falling tides is less than 10 cm, the guide frame is determined to be stable, and the barge is withdrawn from under the guide frame;
[0011] S5: Install a lowering device on the guide frame, lower the guide frame to the designed elevation, weld a locking device, and connect the guide frame and the steel pipe column as a whole;
[0012] S6: Bailey beams and steel panels are laid on the guide frame to form a construction platform. The impact drill is hoisted onto the construction platform by a crane ship to carry out anchor pile construction. The four sets of guide frames at the four corners of the drilling platform are constructed to achieve the construction of four sets of initial drilling platforms.
[0013] S7: Use bridge rods as support beams to build a temporary platform, and construct anchor piles on the temporary platform by impact drilling;
[0014] S8: The anchor piles in the middle area are constructed by using the completed anchor piles to set up a platform until all anchor piles are constructed;
[0015] S9: Set up the upper structure of the drilling platform and complete the construction of the drilling platform.
[0016] As a further solution of the present invention, when the barge in S2 transports the processed guide frame to the designed position, the plane error of the guide frame is controlled to be less than or equal to 20 cm, and the barge is positioned by tightening the anchor rope of the anchor that has been laid.
[0017] As a further solution of the present invention, in S3, when the steel pipe pile is inserted into the rock in the guide frame, the pipe pile is inserted by a hydraulic impact hammer so that the steel pipe pile is inserted into the rock by 0.9m-1.1m.
[0018] As a further solution of the present invention, when the steel pipe pile is inserted into the rock in the guide frame in S3, a bracket is welded on the guide frame.
[0019] As a further solution of the present invention, the guide frame in S3 is initially anchored on the inclined bare rock by driving steel pipe piles with a hydraulic impact hammer.
[0020] As a further solution of the present invention, before the anchor pile construction in S6, the steel pipe of the construction anchor pile is unlocked from the guide frame, and the remaining steel pipe piles remain locked with the guide frame.
[0021] As a further solution of the present invention, when the anchor pile construction is carried out in S6, a temporary platform is set up between the guide frames, steel pipe piles are inserted, and the impact drill is hoisted onto the temporary platform to carry out the anchor pile construction.
[0022] As a further solution of the present invention, during the construction of the S6 anchor piles, if there is leakage, the steel pipe piles need to be followed up until there is no more leakage.
[0023] As a further solution of the present invention, during the construction of S6 anchor piles, first complete all the anchor piles on the outside of the platform, then build a temporary platform through the completed anchor piles to complete the anchor piles on the inside of the platform until all the anchor piles are completed.
[0024] As a further solution of the present invention, the construction of the guide frame in S3-S6 is carried out simultaneously on multiple working surfaces.
[0025] The beneficial effects of the present invention are:
[0026] First, four groups of anchors are thrown into the sea through prefabricated guide frames and anchors, a rock anchor is set on the shore, and the processed guide frames are transported to the designed position by barge, and then accurately positioned by the anchor, and steel pipe piles are inserted and driven by the guide frames, and a construction platform is installed on the guide frames to complete the anchor pile construction, and the construction platform is removed. Then, the construction of the four groups of guide frames is completed by the above method, and then a temporary construction platform is set up through the completed guide frames, and the remaining anchor piles are constructed on the temporary construction platform. After the anchor piles are completed, the upper structure of the drilling platform is installed to complete the setting up of the drilling platform, that is, the guide frame is used as the initial platform, and the initial platform is used to further increase the anchor pile construction working surface, and the four groups of initial platforms are used to establish a temporary platform for the anchor pile construction outside the drilling platform. Multiple working surfaces are constructed at the same time, which reduces the difficulty of anchor pile construction and increases the anchor pile construction period, and solves the problem that when the existing technology uses anchor piles to anchor steel pipe piles in rock formations for anchor pile construction in inclined bare rock areas, the construction is difficult and the construction period is long due to the influence of inclined bare rock geology. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0028] Figure 1 A schematic diagram of the guide frame arrangement position of the present invention;
[0029] Figure 2 It is a schematic diagram of positioning the guide frame of the present invention;
[0030] Figure 3 This is a schematic diagram of the guide frame anchor pile construction of the present invention;
[0031] Figure 4 It is a schematic diagram of the plan structure of the temporary platform of the present invention;
[0032] Figure 5 It is a schematic diagram of the internal construction structure of the temporary platform of the present invention.
[0033] Description of main component symbols:
[0034] In the figure: 1. Barge; 2. Anchor; 3. Guide frame; 4. Construction platform; 5. Impact drill; 6. Corbel; 7. Steel pipe piles; 8. Temporary platform; 9. Anchor piles to be constructed; 10. Seabed surface. DETAILED DESCRIPTION
[0035] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments.
[0036] See also Figure 1-5 This embodiment provides a method for constructing an inclined bare rock drilling platform under rapid flow conditions, comprising the following steps:
[0037] S1: Prefabricate the guide frame 3 and anchor 2, set four sets of anchors 2 in the sea, and set a rock anchor on the shore; by prefabricating the guide frame 3 and anchor 2, the construction quality and efficiency can be guaranteed. Setting the anchor 2 and the rock anchor can provide a stable support point for subsequent construction, ensuring that the platform remains stable under the influence of rapids and waves, and preventing the platform from shifting during the construction process;
[0038] S2: The barge 1 transports the processed guide frame 3 to the designed position, and accurately positions it through the anchor 2. Using the barge 1 to transport the guide frame 3 can reduce the difficulty and time of on-site construction, ensure the accurate installation position of the guide frame 3, and lay the foundation for the subsequent insertion of the steel pipe pile 7 and platform construction;
[0039] S3: insert the steel pipe pile 7 into the rock in the guide frame 3, temporarily lock the guide frame 3 and the steel pipe column through the temporary locking device at high water level, remove the pad between the guide frame 3 and the barge 1, and the insertion of the steel pipe pile 7 provides additional stability. The use of the temporary locking device can maintain the stability of the guide frame 3 at high water level to ensure construction safety. Removing the pad can reduce interference during construction and facilitate subsequent operations. The temporary locking device here can be a hydraulic locking device, which uses a hydraulic system to achieve a close connection between the guide frame 3 and the steel pipe column, or it can be a high-strength bolt, which uses the high-strength bolt to tightly connect the guide frame 3 and the steel pipe column. Here, one of the hydraulic locking device and the high-strength bolt can be selected according to actual conditions;
[0040] S4: Monitor the guide frame 3 through measuring instruments to observe whether the guide frame 3 is stable. If the displacement change of the guide frame 3 under the influence of the seawater ebb and flow is less than 10 cm, it is determined that the guide frame 3 is stable, and the barge 1 is withdrawn from under the guide frame 3. Here, a threshold of the displacement of the settlement is determined according to the design specifications and engineering requirements, such as 10 cm. This value is set based on safety considerations and engineering practice experience. Monitoring the stability of the guide frame 3 is a key step to ensure construction safety. The judgment standard of the settlement displacement being less than 10 cm can ensure the reliability of the guide frame 3 under the influence of seawater dynamics. Withdrawing the barge 1 can create space for subsequent construction.
[0041] S5: Install a lowering device on the guide frame 3, lower the guide frame 3 to the designed elevation, weld a locking device, and connect the guide frame 3 to the steel pipe column as a whole; installing the lowering device and welding the locking device can ensure that the guide frame 3 accurately reaches the designed elevation and is firmly connected to the steel pipe column to form a stable structural foundation; the lowering device here includes a hydraulic or electric drive system for controlling the lowering speed and position of the guide frame 3. In addition, the lowering device also includes some safety locking mechanisms to prevent position deviation due to external forces (such as water flow, waves, etc.) during the descent process. The locking device is used to fix the guide frame 3 in an appropriate position after it reaches the designed elevation. The locking device here includes some mechanical locking mechanisms, such as clamps, bolts or other fixing devices, to ensure that the guide frame 3 will not move due to the action of water flow or waves;
[0042] S6: Bailey beams and steel panels are laid on the guide frame 3 to form a construction platform 4, and the impact drill 5 is hoisted onto the construction platform 4 by a crane ship to carry out anchor pile construction, completing the construction of four groups of guide frames 3 at the four corners of the drilling platform, thereby realizing the construction of four groups of initial drilling platforms, laying Bailey beams and steel panels to form a construction platform 4, and providing a working surface for subsequent construction. The use of a crane ship to hoist the impact drill 5 can conveniently and quickly carry out anchor pile construction, thereby improving construction efficiency;
[0043] S7: Using bridge rods as support beams to build a temporary platform 8, and using impact drilling to construct anchor piles on the temporary platform 8. Here, using bridge rods to build the temporary platform 8 can quickly form a construction space, and using impact drilling to construct anchor piles can improve construction speed and accuracy;
[0044] S8: The anchor piles in the middle area are constructed by using the completed anchor piles to set up a platform until all the anchor piles are constructed. The purpose of the construction here is to make full use of the completed anchor piles, save materials and time, and ensure the continuity and stability of the construction;
[0045] S9: Erect the upper structure of the drilling platform to complete the construction of the drilling platform. Erecting the upper structure is the last step to complete the construction of the entire drilling platform, ensuring the functionality and safety of the platform and providing a stable working environment for subsequent drilling operations.
[0046] At present, for inclined bare rock geology under rapid flow and high flow conditions, most of the existing technologies use steel platform construction technology to construct drilling platforms. Specifically, multiple anchor pile fixing points are first set on the bare rock surface, and then the steel frame structure prefabricated by steel pipe piles 7 is installed on the anchor pile fixing points. Then, according to the design requirements, the steel beams, steel columns and other components of the main structure are welded or bolted to form the main frame of the platform. Diagonal braces are installed on the main structure to increase the stability of the structure. High-strength bolts or other connecting parts are used to firmly connect the diagonal braces to the main structure. Finally, a steel plate of a certain thickness is laid on the main structure as the working surface of the construction platform 4, and guardrails and safety nets are installed on the edge of the platform. To ensure the safety of construction workers, the above steel platform construction has some problems when it is constructed in inclined bare rock areas. For example, in inclined bare rock areas, since the steel pipe piles 7 cannot provide the force required by the steel platform alone, the steel pipe piles 7 are anchored in the rock formation using anchor piles. However, the construction drill bit used in the anchor pile construction usually has a slow drilling speed in the rock formation, especially when encountering hard rock formations. The drill bit wears faster and needs to be replaced frequently, which greatly prolongs the construction period. After the anchor pile construction is completed, the anchoring effect needs to be inspected to ensure that it meets the design requirements. If the inspection results show that the anchoring effect is not ideal, re-construction may be required, which will further increase the construction time.
[0047] In order to solve the above problems, in this embodiment, firstly, four groups of anchors 2 are set in the sea by prefabricating the guide frame 3 and the anchor 2, and a rock anchor is set on the shore. The barge 1 transports the processed guide frame 3 to the designed position, and then accurately positions it by the anchor 2, and uses the guide frame 3 to drive the steel pipe pile 7, and installs the construction platform 4 on the guide frame 3 to complete the anchor pile construction, dismantle the construction platform 4, and then complete the construction of the four groups of guide frames 3 by the above method, and then set up a temporary construction platform 4 by the completed guide frame 3, and construct the remaining anchor piles on the temporary construction platform 4. After the anchor piles are completed, the upper structure of the drilling platform is installed to complete the drilling platform. The platform is set up, that is, the guide frame 3 is used as the initial platform, and the initial platform is used to further increase the anchor pile construction working surface, and four groups of initial platforms are used to establish a temporary platform 8 for anchor pile construction outside the drilling platform. Multiple working surfaces are constructed at the same time, which reduces the difficulty of anchor pile construction and improves the anchor pile construction period. It solves the problem that when the existing technology uses anchor piles to anchor steel pipe piles 7 in rock formations for anchor pile construction in inclined bare rock areas, the construction is difficult and the construction period is long due to the influence of inclined bare rock geology. At the same time, it also reduces the design amount of steel pipe piles 7 and anchor piles, thereby saving costs, improving the quality of anchor pile construction, and ensuring the overall construction quality of the steel platform.
[0048] Due to the influence of rapids and wave heights, the barge 1 may produce a large displacement during transportation, causing the positioning error of the guide frame 3 to exceed the allowable range. If the positioning error of the guide frame 3 is too large, it will affect the subsequent drilling operation, thereby reducing the construction efficiency of the entire project. In order to solve this problem, in one embodiment, when the barge 1 in S2 transports the processed guide frame 3 to the designed position, the plane error of the guide frame 3 is controlled to be less than or equal to 20 cm, and the barge 1 is positioned by tightening the anchor rope of the anchor 2 that has been thrown. By controlling the plane error of the guide frame 3 to be within 20 cm, the position of the drilling platform can be guaranteed to be accurate and meet the accuracy requirements of the engineering design. Under the conditions of rapids and wave heights, the thrust and influence of the water flow on the barge 1 are very large. In order to stabilize the barge 1 at the designed position, it is necessary to accurately control it through the anchor rope. If the error is too large, the water flow may cause the barge 1 to deviate, affecting the positioning of the guide frame 3. Controlling the plane error of the guide frame 3 to be less than or equal to 20 cm is to ensure construction quality, safety and efficiency, and also to comply with the requirements of relevant technical specifications.
[0049] Since the steel pipe piles 7 penetrate deep into the rock layer, the stability of the construction platform 4 can be significantly improved, especially in an environment with a large impact of rapids and wave heights. In order to ensure the stability, safety and reliability of the construction quality of the construction platform 4, so as to successfully complete the construction task under complex natural environmental conditions, in this regard, in one embodiment, when the steel pipe piles 7 are inserted into the rock in the guide frame 3 in S3, the pipe piles are inserted by a hydraulic impact hammer to make the steel pipe piles 7 penetrate into the rock by 0.9m-1.1m. Because under the conditions of rapids and wave heights, the safety of the construction platform 4 is of vital importance. Steel pipe piles 7 inserted too deep may cause instability of the construction platform 4 due to the instability of the water flow and the seabed. The insertion depth is within the range of 0.9m-1.1m, which can ensure the fixity of the steel pipe piles 7 while avoiding the instability caused by The potential risks brought by inserting too deep, a deeper insertion depth of more than 1.1m means higher costs, including equipment wear, energy consumption and time costs. Under the premise of meeting the project requirements, it is beneficial to choose a more economical insertion depth. An insertion depth lower than 0.9m will affect its stability. According to geological conditions and project requirements, an insertion depth of 0.9m-1.1m can provide sufficient bearing capacity to meet project requirements, which can not only ensure the stability of the steel pipe pile 7, but also avoid unnecessary costs and construction difficulties due to excessive insertion. This depth range also needs to be determined in combination with specific geological survey data, platform stability, performance of the hydraulic impact hammer and specific project requirements. This depth range here is a practical value obtained through preliminary tests and experience summary.
[0050] In order to further improve the stability during construction, in one embodiment, when the steel pipe piles 7 are inserted into the rock in the guide frame 3 in S3, the brackets 6 are welded on the guide frame 3. By welding the brackets 6 on the guide frame 3, the overall stability of the platform structure can be enhanced, especially in harsh marine environments, it can effectively resist the impact of water currents and waves. The guide frame 3 is lowered onto the brackets 6 by a lowering device. The guide frame 3 in S3 is initially anchored on the inclined bare rock by inserting the steel pipe piles 7 through the hydraulic impact hammer. When constructing on the inclined bare rock, the stability of the platform is the primary consideration. Due to the fast water flow speed and large wave height fluctuations, the fixing method may be difficult to ensure the stability of the platform. The efficient piling ability of the impact hammer can anchor the steel pipe piles 7 deeply in the rock, thereby improving the impact resistance and stability of the entire platform. In addition, the hydraulic impact hammer piling has strong adaptability to the terrain, and can be effectively operated even on inclined bare rock, thereby shortening the construction period and reducing costs.
[0051] In order to improve the efficiency and quality of construction, in one embodiment, before the anchor pile construction in S6, the steel pipe of the anchor pile construction is unlocked from the guide frame 3, and the remaining steel pipe piles 7 are kept locked with the guide frame 3. When the anchor pile construction is carried out in S6, a temporary platform 8 is set up between the guide frames 3, the steel pipe piles 7 are inserted, and the impact drill 5 is hoisted onto the temporary platform 8 to carry out the anchor pile construction. During the S6 anchor pile construction, if there is leakage, the steel pipe piles 7 need to be followed up until there is no leakage. During the S6 anchor pile construction, all the anchor piles on the outside of the platform are completed first, and then the temporary platform 8 is set up through the completed anchor piles to complete the anchor piles on the inside of the platform until all the anchor piles are completed. When the guide frame 3 is constructed in S3-S6, it is carried out simultaneously on multiple working surfaces. Here, the steel pipe of the anchor pile construction is unlocked from the guide frame 3 to avoid interference or damage to other locked steel pipe piles 7 during the anchor pile construction. The remaining steel pipe piles 7 are kept locked with the guide frame 3 to prevent the influence of the anchor piles being constructed alone. In order to ensure the stability of the entire platform, a temporary platform 8 is set up between the guide frames 3 to provide a safe construction area, which is convenient for hoisting the impact drill 5 to the platform for anchor pile construction, inserting the steel pipe, and hoisting the impact drill 5 to the temporary platform 8 for anchor pile construction. The purpose here is to perform anchor pile drilling and grouting operations on the temporary platform 8 to ensure the construction quality and efficiency of the anchor piles. If there is leakage, the steel pipe piles 7 need to be followed up to ensure the grouting quality of the anchor piles and prevent slurry leakage from affecting the anchoring effect. All anchor piles on the outside of the platform are completed first to prevent the platform from being moved by the impact of water flow or external force during construction. Through the completed anchor piles, a temporary platform 8 is set up to complete the inner anchor piles of the platform. On the basis of ensuring the stability of the outer side, the inner anchor pile construction can be gradually completed to further enhance the stability of the entire platform. When constructing the guide frame 3, it is carried out simultaneously on multiple working surfaces to improve construction efficiency, shorten the overall construction period, and ensure safety and quality during construction.
[0052] The working principle and use process of the present invention:
[0053] During construction, the guide frame 3 is first processed in the back field, and the anchor 2 is dropped into the sea. Figure 2 As shown, the guide frame 3 is floated to the designated position by the barge 1, and the barge 1 is accurately positioned by the anchor 2, with the plane deviation less than or equal to 20 cm. The barge 1 is fixed by tightening the anchor rope, and the steel pipe pile 7 is inserted into the rock in the guide frame 3. The bracket 6 is welded on the guide frame 3. After observing a rising and falling tide, the settlement displacement is less than 10 cm, and the guide frame 3 is stable. The barge 1 withdraws from under the guide frame 3, and the guide frame 3 is lowered onto the bracket 6 by the lowering device, as shown in FIG. Figure 3 As shown, Figure 2 and Figure 3 In order to facilitate understanding of the position of the steel pipe piles 7, the seabed surface 10 is drawn. Bailey beams and steel panels are laid on the guide frame 3 to form a construction platform 4. The impact drill 5 is lifted to the construction platform 4 by a crane ship to carry out anchor pile construction. Before the anchor pile construction, the steel pipes to be constructed with the anchor piles are unlocked from the guide frame 3, and the remaining steel pipe piles 7 are kept locked with the guide frame 3. During the anchor pile rushing process, if there is leakage, the steel pipe piles 7 need to be followed up until there is no leakage. After completing the construction of all anchor piles of the reorganized guide frame 3, the impact drill 5 is lifted off the platform, and the construction of the four groups of guide frames 3 at the four corners of the platform is completed according to the above steps, and the construction platform 4 is dismantled. Figure 4 and 5 As shown, a temporary platform 8 is set up between the guide frames 3, steel pipe piles 7 are inserted, and the impact drill 5 is hoisted onto the temporary platform 8 to carry out anchor pile construction. After all the anchor piles on the outside of the platform are completed, a temporary platform 8 is set up through the completed anchor piles to complete the anchor piles on the inside of the platform until all the anchor piles are completed.
[0054] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any brief modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A method for constructing an inclined bare rock drilling platform under rapid flow conditions, characterized in that: The following steps are involved: S1: Prefabricate guide frames and anchors, drop four sets of anchors in the sea, and set a rock anchor on the shore; S2: The barge transports the processed guide frame to the designed position and accurately positions it by anchoring; S3: insert steel pipe piles into the rock in the guide frame, temporarily lock the guide frame and the steel pipe column through a temporary locking device at high water level, and remove the pad between the guide frame and the barge; S4: Monitor the guide frame through measuring instruments to observe whether the guide frame is stable. If the displacement change of the guide frame under the influence of the rising and falling tides is less than 10cm, the guide frame is determined to be stable. withdraw the barge from under the guide frame; S5: Install a lowering device on the guide frame, lower the guide frame to the designed elevation, weld a locking device, and connect the guide frame and the steel pipe column as a whole; S6: Bailey beams and steel panels are laid on the guide frame to form a construction platform. The impact drill is hoisted onto the construction platform by a crane ship to carry out anchor pile construction. The four sets of guide frames at the four corners of the drilling platform are constructed to achieve the construction of four sets of initial drilling platforms. S7: Use bridge rods as support beams to build a temporary platform, and construct anchor piles on the temporary platform by impact drilling; S8: The anchor piles in the middle area are constructed by using the completed anchor piles to set up a platform until all anchor piles are constructed; S9: Set up the upper structure of the drilling platform and complete the construction of the drilling platform.
2. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: When the barge in S2 transports the processed guide frame to the designed position, the plane error of the guide frame is controlled to be less than or equal to 20 cm, and the barge is positioned by tightening the anchor rope of the anchor that has been set.
3. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: In S3, when the steel pipe pile is inserted into the rock in the guide frame, the pipe pile is inserted by a hydraulic impact hammer so that the steel pipe pile is inserted into the rock by 0.9m-1.1m.
4. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: In the above-mentioned S3, when the steel pipe pile is inserted into the rock in the guide frame, the bracket is welded on the guide frame.
5. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: The guide frame in S3 is initially anchored on the inclined bare rock by driving steel pipe piles through a hydraulic impact hammer.
6. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: Before the anchor pile construction in S6, the steel pipe of the anchor pile is unlocked from the guide frame, and the remaining steel pipe piles remain locked with the guide frame.
7. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: When the anchor pile construction is performed in S6, a temporary platform is set up between the guide frames, steel pipe piles are inserted, and the impact drill is hoisted onto the temporary platform to perform the anchor pile construction.
8. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: During the construction of the S6 anchor piles, if there is leakage, the steel pipe piles need to be followed up until there is no more leakage.
9. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: During the construction of the S6 anchor piles, first complete all the anchor piles on the outer side of the platform, then set up a temporary platform through the completed anchor piles to complete the anchor piles on the inner side of the platform until all the anchor piles are completed.
10. The method for constructing an inclined bare rock drilling platform under rapid flow conditions according to claim 1, characterized in that: The construction of the guide frame in S3-S6 is carried out simultaneously on multiple working surfaces.
Citation Information
Cited By
Trestle and construction platform construction method
CN119824800A
Inclined bare rock breaking method for complex sea area
CN120871100A
A method for removing inclined bare rock in complex marine environments
CN120871100B
Construction method of offshore deepwater pebble bed pile foundation construction structure
CN120925503A
Construction method of offshore deep-water boulder layer pile foundation construction structure
CN120925503B