The invention belongs to the technical field of ships, and discloses a testing method for a PCTC ship
stern ramp load
monitoring system, the theoretical maximum
load capacity of a
stern ramp in the non-starting state of the
stern ramp load
monitoring system is Wmax1, the theoretical maximum
load capacity of the stern ramp in the starting state of the stern ramp load
monitoring system is Wmax2, and the theoretical maximum
load capacity of the stern ramp in the starting state of the stern ramp load monitoring
system is Wmax2. Comprising the following steps that a starting button of a stern ramp load monitoring
system is pressed down, a stern ramp is opened, and the included angle between the stern ramp and the
wharf ground is smaller than or equal to 6 degrees; a weight-free load test is carried out; carrying out
load testing within Wmax1; a load test of a Wmax1 critical value is carried out; a load test of a Wmax2 critical value is carried out; compared with the mode that a crane is used for hoisting the weights one by one and the module vehicle loads and moves the weights, crane resources are saved, the testing efficiency is greatly improved, the influence of testing on the
wharf production period is reduced, the influence of
water level changes caused by tide rising and tide falling on testing is reduced, and the reliability of testing results is improved.