8results about How to "Save material cost" patented technology

Drainage station stone

The utility model discloses a drainage station stone, and belongs to the technical field of urban road construction. The single module comprises a single module body and a filter part, a drainage channel is formed in the single module body, the filter part is provided with a rectangular frame, a filter screen and a rectangular block, the filter screen is installed in the rectangular frame, the rectangular block is installed at the bottom of the rectangular frame, a reserved groove and a limiting groove are formed in the single module body, and the rectangular frame is arranged in the reserved groove in a matched mode. And the rectangular block is matched in the limiting groove. Fallen leaves, silt and other sundries can be effectively intercepted through the detachable filter part and the filter screen, blockage caused by the fact that the sundries enter a drainage channel is avoided, smooth drainage is guaranteed, the filter part is of a top lifting type detachable structure, the filter screen can be rapidly taken out to be cleaned or replaced, maintenance difficulty and time cost are reduced, and daily maintenance work is facilitated.
Owner:WUHAN CHEGU ENVIRONMENTAL PROTECTION RENEWABLE RESOURCES TECH CO LTD

Prefabricated shear wall aluminum mold hole filling and plugging device

The utility model discloses a prefabricated shear wall aluminum mould hole filling and plugging device, including the plugging plug and the grouting plug, install respectively in the both sides of shear wall aluminum mould hole, the grouting plug is circular table shape structure, and the inside coaxial opening has the cylinder cavity, install the piston disc of disc shape in the cylinder cavity, still have the guide rod fixedly in the cylinder cavity, the piston disc central opening has the perforation, is used for the axle position movement adjustment of bushing guide rod, and the cylinder cavity corresponds the limit device of guide rod end. Simple structure, easy to make and low cost, convenient operation, just need to plugging the both ends of prefabricated shear wall can start grouting filling, simple construction, construction quality controllable, guarantee plugging dense, save material cost and labor cost, reduce the later repair expense, guarantee construction quality and realize the project cost reduction and benefit increase at the same time, convenient to use, safe and reliable can improve construction efficiency and quality greatly.
Owner:ANHUI WATER CONSERVANCY DEV CO LTD

Construction structure of embedded and reserved finished bridge

ActiveCN224596108UInstall straightprecise positioning
This utility model discloses a construction structure for pre-embedded sections of pre-built cable trays, including a pre-embedded section body mounted on a template. The pre-embedded section body is a rectangular cylinder with multiple pull tab holes on the upper part of one side wall. Angle steel bases are respectively installed on the front and rear sides of the bottom of the pre-embedded section body between it and the template. The angle steel bases are fixedly connected to the template with screws and welded to the pre-embedded section body. Connecting pieces are attached to the inner wall of the contact point between the upper-layer cable tray and the pre-embedded section body. The connecting pieces are fixedly connected to the pull tab holes of the pre-embedded section and the bottom of the upper-layer cable tray with bolts, thus fixing the pre-embedded section body to the upper-layer cable tray. This structure features one-time molding, accurate positioning, straight cable tray installation, and rapid construction: the pre-embedded section is poured simultaneously with the structure, eliminating the need for formwork removal and sealing.
Owner:CHINA CONSTR SIXTH ENG BUREAU CIVILENG +1

A column-pile integrated comprehensive pipeline support special for a power plant

The application provides a pile-column integrated comprehensive pipeline support special for a power plant, and is characterized in that the pipeline support comprises a pile-column integrated replacement pile column, a stringer, a connecting piece and a cross beam, wherein the pile column is partially embedded in the ground and partially exposed on the ground, the on-ground part of the pile column is provided with the connecting piece, the cross beam is integrally cast with the pile column, and the stringer is connected with the pile column through the connecting piece. Compared with the prior art, the application can shorten the construction period, save a large number of processes such as binding steel bars, supporting a formwork, pouring concrete and curing in the construction foundation process of the traditional scheme, and save 15% to 35% of the construction time. In addition, the application has the advantages of small occupied area, convenient arrangement and cost saving.
Owner:CHINA POWER ENG CONSULTING GRP CORP EAST CHINA ELECTRIC POWER DESIGN INST

Construction method of combined bridge pier suitable for alpine region

This invention discloses a composite bridge pier suitable for high-altitude and cold regions, comprising an inner core and an outer ring. The outer ring encloses the inner core and is made of ultra-high-strength concrete. The inner core is cast on-site from ordinary concrete, while the outer ring is prefabricated in a factory. This composite bridge pier uses only the more expensive ultra-high-strength concrete in the outer ring, which meets the requirements for freeze-thaw resistance while reducing the amount of ultra-high-strength concrete used, thus balancing project costs. Furthermore, the prefabricated outer ring can be directly used as a formwork for the bridge pier on-site, eliminating the material costs and installation / disassembly costs associated with traditional formwork construction.
Owner:CHINA RAILWAY CONSTR PROPERTY TECH CO LTD +1

TBM tunnel low side wall and cable ditch construction dual-purpose trolley and construction method

The invention discloses a TBM tunnel low side wall and cable ditch construction dual-purpose trolley and a construction method, and belongs to the technical field of TBM tunnel construction equipment. The TBM tunnel low side wall and cable ditch construction dual-purpose trolley comprises a portal, a formwork assembly, a pump station, a hydraulic oil cylinder, a walking mechanism and a lead screw; the formwork assembly comprises a low side wall formwork and a cable ditch formwork, and the formwork assembly can be replaced to adapt to casting of a low side wall and a cable ditch; the walking mechanism drives the trolley to be in place, the pump station supplies energy to the hydraulic oil cylinder to adjust the posture of the formwork, and the lead screw enhances the supporting stability of the formwork. Meanwhile, the invention discloses a construction method adopting the trolley. The invention has the advantages of dual purposes, high mechanization degree, simplicity and convenience in operation, capability of improving the construction quality and efficiency, improving the operation environment and reducing the labor intensity and risk, and is suitable for TBM tunnel construction, particularly suitable for large-scale operation of long tunnels.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD +1

A rigid spray gun for cleaning a titanium chloride white heat exchanger

This utility model discloses a rigid spray gun for cleaning titanium dioxide heat exchangers, belonging to the field of titanium dioxide heat exchanger cleaning technology. It solves the problems of incomplete cleaning and high cleaning costs associated with existing rigid spray guns. Specifically, the rigid spray gun includes a high-pressure pipe connector, a stainless steel pipe, and a nozzle. One end of the high-pressure pipe connector is connected to a high-pressure hose, and the other end is connected to the stainless steel pipe. The end of the stainless steel pipe furthest from the high-pressure pipe connector is connected to the nozzle. In this utility model, a rigid spray gun is made by connecting one end of a stainless steel pipe to a high-pressure hose via the high-pressure pipe connector and the other end to the nozzle, replacing the traditional rigid spray gun for cleaning. The length of the stainless steel pipe can be arbitrarily cut according to cleaning requirements, thus achieving thorough cleaning of a 9000mm long titanium dioxide heat exchanger tube in one pass. This thorough cleaning improves work efficiency and saves a significant amount of time. Furthermore, the stainless steel pipe is inexpensive and readily available, reducing procurement costs.
Owner:PANZHIHUA PANXILANXING CHEM QINGXI CO LTD

Module parameter monitoring method, device and medium

The invention discloses a module parameter monitoring method and device and a medium, and relates to the field of module parameter monitoring, and the method is applied to a host, identifies a module insertion action, and obtains a cable binding state reported by a module; determining a first module and a non-first module of the same type of monitoring parameters according to the state, and bringing the non-first module into a to-be-bound queue; the first module is controlled to collect monitoring parameters, and the non-first module is controlled to suspend the monitoring parameter collection function; and monitoring the state of the first module, if the state is changed, activating the first module from the queue to be bound according to a first-in first-out rule, and controlling the first module to collect monitoring parameters. In this way, different types of cables are adapted through a single interface, corresponding monitoring parameters are bound, and user operation is simplified; the same module is reused to realize large-scale production, and the material cost of manufacturers is saved; a user can replace a fault module across parameters, and the maintenance cost is reduced; a manufacturer does not need to distinguish module types after sale, the maintenance process is simplified, and finally full-link cost optimization and efficiency improvement are achieved.
Owner:WEIGAO (SUZHOU) MEDICAL TECH CO LTD