Structure of prefabricated pile-plate brackets for underpinning existing pile foundations through shield tunneling and construction method
A construction method and prefabricated pile technology, which is applied in foundation structure engineering, foundation structure repair, earthwork drilling and mining, etc., can solve the problem of inability to effectively prevent the settlement of new slab foundations, the high risk of direct pile cutting by shield tunneling, and the inability of valve plate foundations. Good application and other issues, to achieve the effect of preventing settlement, shortening the construction period and saving costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0055] A prefabricated pile-slab foundation underpinning in which shield tunneling passes through an existing pile foundation, including four prefabricated piles 5 laid around the existing pile 3 foundation and pouring together with the existing cap 2 and the existing pile 3 foundation The conversion layer 6; the prefabricated pile 5 is set on the outside of the existing pile 3, and the prefabricated pile is set at a certain distance outside the existing pile to ensure that it does not extend into the excavation range of the shield machine and is separated from the shield machine. Keep a certain safe distance in the digging range.
[0056] The prefabricated pile 5 has reserved steel bars at the top of the pile, and the reserved steel bars at the top of the pile are welded as a whole with the reinforcement cage of the conversion layer 6, and the reinforcement cage of the conversion layer 6 is also connected with the existing cap 2 and the existing pile 3 The planting bars are w...
Embodiment 2
[0059] A prefabricated pile-slab foundation underpinning construction method in which the shield tunnel passes through the existing pile foundation, comprising the following steps:
[0060] (1) Prefabrication of prefabricated piles 5 outside the construction site
[0061] The prefabrication steps of the prefabricated pile 5 are as follows: making the formwork of the prefabricated pile 5, binding the reinforcement cage, reserving the steel bar connected with the transfer layer 6 reinforcement cage at the top of the prefabricated pile 5, pouring the concrete pile body, curing, and removing the formwork;
[0062] (2) Excavate the foundation pit around the existing pier 1, and press the prefabricated pile 5 into the position required by the design
[0063] (1) Excavate the foundation pit on a small slope around the existing pile 3 to the design depth, level the bottom of the foundation pit, and carry out foundation pit support;
[0064] (2) Use a pile driver to press the prefabri...
Embodiment 3
[0074] Preferably, when the deformation requirements of the existing structure are extremely strict, the jack can be used to compensate the deformation of the existing structure. Another scheme for the underpinning of the prefabricated pile-slab foundation where the shield passes through the existing pile foundation is:
[0075] It includes 4 prefabricated piles 5 driven around the existing pile foundation and the transfer layer 6 poured together with the existing cap 2 and the existing pile 3 foundation, and is placed between the existing cap 2 and the transfer layer 6 4 jacks 7; the prefabricated pile 5 is set on the outside of the existing pile; the pile top of the prefabricated pile 5 has reserved steel bars, and the reserved steel bars at the top of the pile are welded as a whole with the reinforcement cage of the transfer layer. The reinforcement cage of the conversion layer is also welded and connected with the existing cap and the reinforcement of the existing pile; th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com