Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

127 results about "Catchwater" patented technology

A catchwater device is a large-scale man-made device for catching surface runoff from hills and the sky from precipitation by channeling it to reservoirs for commercial and domestic use later. Freshwater is a scarce natural resource due to pollution, droughts, and overpopulation. Catchwater is a sustainable mechanism to increase freshwater in areas facing droughts or polluted waterways.

Mine ecological remediation and slope vegetation fast restoring method suitable for arid region

InactiveCN105961120ARestore structural stabilityRestore balanceSewerage structuresExcavationsAridGrowth plant
The invention discloses a mine ecological remediation and slope vegetation fast restoring method suitable for the arid region. The method comprises a slope protection method and the steps that water collecting devices are arranged; soil improvement is carried out; vegetation configuration is carried out. Firstly, according to the through slope arrangement, mining slide slopes needing to be restored are subjected to step type slope cutting to be stabilized, an ecological catchwater is arranged on the inner side of each stage of a platform, and the steps are continuously provided with desilting basins and water collecting pits every other certain distance. Water collecting devices are mounted in the water collecting pits and connected with the desilting basins and the catchwaters, the other ends of the water collecting devices are provided with controllable drainage ports, the water collecting devices are connected with a slope irrigation system and used for collecting and fully and reasonably utilizing slope runoff, a dry season irrigation water source is provided, meanwhile, slope scouring is avoided, and water and soil losses are reduced. The platform and the slopes are all covered with earth, a planting pit is dug in each stage of the platform, the mode of ecological bags and ecological blankets is adopted in each stage of the slopes, a soil conditioner and foreign soil from other places are mixed, the planting pits, the ecological bags and the ecological blankets are filled with the mixture, and good water and fertilizer conditions are provided for plant growth. Proper trees brushes and grasses are selected to be distributed. The ground conditions of the side slopes are comprehensively improved, and side slope vegetations are restored to the natural ecological state.
Owner:BEIJING FORESTRY UNIVERSITY

Arsenic sandstone slope treating method

InactiveCN103821153AHigh spray construction efficiencySpray construction efficiency is convenientExcavationsVegetationSoil science
The invention discloses an arsenic sandstone slope treating method and mainly applies to conservation of water and soil, vegetation and stabilization treatment of the arsenic sandstone slope. The arsenic sandstone slope treating method includes a steep slope treatment process, a slope crest treatment process and a slope base treatment process. The slope treatment process includes excavating a catchwater at the position distant from the slope crest by 1-3m, and excavating fish-scale pits at the position of the catchwater distant from the abrupt slope by more 2m; spraying resin solution in 5-15% concentration onto rock soil between the catchwater and the top edge of the slope to form a water-resisting layer. The steep slope treatment process includes dividing the slope into a steep slope, a moderate slope and a gentle slope according to the gradient of the slope; spraying different concentrations of resin solution on the surface of the slope according to different slopes. The slope base treatment process includes spraying the resin solution in 3-5% concentration on the surface of the slope base to form a greening layer, and planting herbaceous plants and woody plants. Compared with the prior art, the arsenic sandstone slope treating method has the advantages of high efficiency and convenience in resin spraying and construction, stability in the slope after implementation and the like.
Owner:SOUTHEAST UNIV +1

Method for afforesting completely-weathered aleurolite side slope by utilizing native plants

The invention discloses a method for afforesting a completely-weathered aleurolite side slope by utilizing native plants. The method comprises: according to the characteristics of thinner soil layer and high and steep slope of the completely-weathered aleurolite, spraying and planting plant seeds by a hung three-dimensional net hydraulic soil replacement spraying and planting method; digging a hole on the side slope by combining with a side slope hole digging and fixing process; building a favourable environment for the plants to grow in the hole; planting the native plants (masson pines and Chinese cherries) into the hole; watering and applying fertilizer to cause the native plants to normally grow; planting native herb, native bush and native arbour on the side slope and around the side slope and a catchwater; after normal maintenance, afforesting the completely-weathered aleurolite side slope. The material adopted by the invention has no pollution. The method is characterized by biological environmental friendliness and improved afforestation survival rate; and in addition, the method does not affect environment, and belongs to energy-saving and clean production. The adopted native plants are subjected to side slope afforestation and are harmonious with surrounding environment, thus obtaining the result of efficiently combining the effects on afforestation, beautification, original ecology and environmental friendliness.
Owner:SOUTH CHINA BOTANICAL GARDEN CHINESE ACADEMY OF SCI +1

Construction method of ecological revetment for river bank protection

The invention discloses a construction method of an ecological revetment for river bank protection. The construction method comprises the following steps of a, paving a gravel material cushion layer;b, paving geotechnical cloth; c, backfilling a soil layer with the depth of 20-30 cm on the geotechnical cloth, and compacting the soil layer; d, constructing the ecological revetment; and e, placingsoil into ecological planting holes of ecological building blocks, and then growing plants. According to the construction method, the ecological building blocks after construction cannot fall off, sothat the overall performance of the whole ecological revetment is improved, and the flood prevention effect, the ecological effect, the landscape effect and the self-cleaning effect of the ecologicalrevetment are enhanced; and meanwhile, accumulated water on the construction site can flow into the inclined surface parts of the ecological building blocks through filter plates used for lapping withthe building blocks, and the water on the inclined surface parts of the ecological building blocks are discharged into the soil through drainage grooves, so that the earthwork of the construction area which is not paved with the ecological building blocks is prevented from being subjected to micro-amplitude sedimentation phenomenon, the flatness of the excavated earthwork is guaranteed, the ecological building blocks can be conveniently and quickly laid, moreover, the ecological building blocks can be quickly replaced, and the service period of the ecological revetment can be prolonged.
Owner:浙江丰茂盛业建设有限公司

Construction method of tunnel entrance and exit hole

The invention discloses a construction method of a tunnel entrance and exit hole. The construction method of the tunnel entrance and exit hole comprises the following steps that a hole top catchwateris excavated; the hole is excavated; a hole side slope and a heading slope are protected; a cover arch is constructed; and a pipe shed is constructed. When the hole top catchwater is excavated, excavation and laying are carried out sectionally from low to high. When the hole is excavated, hole excavation and side slope and heading slope excavation are carried out synchronously; an arc excavation reserved core native law is adopted in the hole excavation; and the side slope and the heading slope are excavated along a hole excavation line. The hole side slope and the heading slope protection process can be carried out following side slope and heading slope brushing. The cover arch construction working process comprises the following steps that surveying and setting out are carried out; the heading slope is excavated and excavation and supporting are carried out at the same time; an I-shaped steel arch frame is mounted; a template is mounted; and cover arch concrete is constructed. The pipe shed construction process comprises the following steps that hole site setting out and drilling machine erection are carried out; drilling hole footage and error correcting are carried out; pipe shed steel pipes are machined; the pipe shed steel pipes are jacked; and pipe shed slip casting is carried out. According to the construction method of the tunnel entrance and exit hole, the soft rock tunnel hole can be effectively reinforced.
Owner:CCCC THIRD HARBOR ENG +2

Partly bright partly dark holed construction method for highway tunnel

InactiveCN110318770AAvoid softening and instabilityImprove stabilityUnderground chambersTunnel liningRetaining wallCatchwater
The invention discloses a partly bright partly dark holed construction method for a highway tunnel. The method comprises the following steps: a, building a catchwater system on the roof of the tunnel;b, excavating and supporting a side slope of a tunnel opening; c, building an unsymmetrical retaining wall on the outer side of the tunnel opening; d, supporting an open cut tunnel on the outer sideand constructing a protecting arch; and e, excavating and supporting a dark tunnel on the inner side and filling the dark tunnel with an inverted arch. By building a catchwater on the roof o the tunnel, rainwater can be prevented from scouring a slope surface for a long time; the side slope on the tunnel opening is excavated and supported to enhance the stability of the side slope of the tunnel opening, and by building the unsymmetrical retaining wall on the outer side, influence of unsymmetry to the structure is reduced. The open cut tunnel on the outer side is supported and the protecting arch is constructed, and finally, the dark tunnel on the inner side is excavated and supported, and the dark tunnel is filled with the inverted arch. The method can balance loads of rocks around the tunnel effectively to make sure that a holed construction environment of the tunnel is stable, so that the problem of difficulty in tunnel holed construction is solved effectively.
Owner:CHINA RAILWAY 23RD BUREAU GRP THIRD ENG CO LTD

Swell-shrink characteristic rock-soil cut slope protection method and structure

The invention discloses a swell-shrink characteristic rock-soil cut slope protection method and structure. The method comprises the steps of a, digging and leveling a cut slope according to a designed slope gradient; b, building support sewers on the surface of the slope body with rubble, gravel and mortar at certain intervals in the longitudinal direction of the cut slope; c, arranging anchor rods and reinforced concrete frame beams in a criss-cross mode on the portions, between every two support sewers, of the surface of the slope body; d, constructing catchwaters with mortar rubble on the top of the cut slope and a platform portion; e, drilling the slope body from the bottom of the cut slope, and implanting PVC inclined drain pipes; f, constructing a footwall with mortar rubble at the position of the slope toe; g, filling grillage chambers of the reinforced concrete frame beams with loam, and conducting soil spraying and grass planting. The structure is composed of the cut slope body, the support sewers, the reinforced concrete frame beams, the anchor rods, the catchwaters, the inclined drain pipes, the footwall and grass sowing by spraying. The method is simple, using is convenient, and the method and structure are suitable for reinforcement and protection of the swell-shrink characteristic rock-soil cut slope, water drainage and resistance and environment-friendly landscape.
Owner:CCCC SECOND HIGHWAY CONSULTANTS CO LTD

Method for ecological agriculture reconstruction of coal mining subsidence waterlogged area

A method for ecological agriculture reconstruction of a coal mining subsidence waterlogged area is suitable for ecological system restoration and agricultural planting and breeding structure reconstruction of a mineral product mining subsidence waterlogged area. The method includes the steps that the coal mining subsidence waterlogged area is divided into a flat ground area, a slope area and a subsidence waterlogged area water-containing area; accumulated water is detected, transformation is directly carried out when the accumulated water meets the agricultural water quality standard, and planning is carried out to make the water qualified when the detection result does not meet the agricultural water quality standard; a water storage area water level balance system is constructed, filling reclamation is carried out in the range of the flat ground area, wetland is transformed, soil improvement is carried out to make the wetland become cultivated land, and a movable greenhouse is built; the slope area is divided into three parts for planting arbors, shrubs and forage grass; aquatic vegetables are planted in a shallow water area, and aquatic organisms are bred in a deep water area. Through ecological agriculture reconstruction of the coal mining subsidence waterlogged area, the utilization rate of water and soil of the subsidence area is increased, a complete subsidence area ecological system is constructed, and the method is suitable for ecological environment restoration and control over various coal mining subsidence waterlogged areas in the East of China.
Owner:ANHUI UNIVERSITY +1

Landscaping rainwater collection and utilization system

The invention relates to the technical field of rainwater collection and utilization, in particular to a landscaping rainwater collection and utilization system. The landscaping rainwater collection and utilization system comprises a rainwater collection device, a rainwater filtering device, a water storage device and a rainwater utilization device which are in sequential communication, wherein the rainwater collecting device comprises drainage channels and a vegetation water seepage device, the drainage channels are arranged at the two sides of a road in the road direction, and the vegetationwater seepage device is arranged below vegetation and communicates with the drainage channels; the rainwater filtering device comprises a filtering cylinder, the drainage channels are gathered at thetop of the filtering cylinder, and a filtering net is arranged in the filtering cylinder; and the water storage device comprises a reservoir, the reservoir is buried underground, and the bottom of the filtering cylinder communicates with the top of the reservoir. According to the present invention, the problem that in the prior art, a large quantity of water resources are wasted due to the fact that rainwater cannot be utilized, is solved, and the effects of collecting, treating and storing rainwater in a garden, reducing rainwater waste, utilizing rainwater and reducing garden water, are achieved.
Owner:江苏绿臻建设有限公司

Treatment method for slight stony desertification in karst mountainous area

InactiveCN103931372ATake advantage ofRealize the social and economic development of the river basinClimate change adaptationAgriculture gas emission reductionFruit treeShrubland
The invention relates to a treatment method for slight stony desertification in a karst mountainous area. The method includes the steps that a planting combination of economic fruit tree forest and crops is adopted for the same cultivated land unit, shrubland and unutilized land are mainly used for planting forests for conserving water supply, and a forest-glass composite ecological type is set up; vegetation structures are allocated in an optimized mode, through a land terracing technology, stone ridge slopes are repaired, built and changed into terracing, field production shortcut construction is matched, and through the matched construction of a rainwater collecting plateau, a catchwater, a desilting basin, a water conveying pipeline, a small cistern and a small pond, a slope rainwater collecting system is set up; an underground river is developed, an underground river irrigation pumping station is constructed, so that water resources are reasonably deployed, a soil moisture conservation technology and a water-saving irrigation technology are adopted, and a scientific and reasonable irrigation mode is set up. Through the treatment method, the slight stony desertification in the karst mountainous area is effectively treated, water and soil loss is reduced, the stony desertification trend is restrained, and the social economy and ecological construction develop harmoniously.
Owner:GUIZHOU NORMAL UNIVERSITY

Purification system for integrated culture of fishes and shrimps

The invention provides a purification system for integrated culture of fishes and shrimps. The purification system comprises an integrated vertical subsurface flow wetland, a river channel, a water purification pond, a water storage pond and a culture pond, wherein the integrated vertical subsurface flow wetland is used for preliminary purification of a water source; the river channel is connectedwith the integrated vertical subsurface flow wetland through a water pipe for further water quality purification; the water purification pond and an outlet end of the river channel are isolated by anoverflow dam, thus promoting water quality; an inlet end of the water storage pond and an outlet end of the water purification pond are isolated by a subsurface flow dam; an outlet end of the water storage pond is isolated from the integrated vertical subsurface flow wetland by an isolating device; after the water quality is finally purified and monitored, water flows into the culture pond through a water pump; and freshwater shrimps and Ietalurus punetaus are mixed-cultured in the culture pond, and culture wastewater in the culture pond flows into the river channel through a drainage channelfor purification, and the water in the river channel then flows into the water purification pond and the water storage pond for circular purification. According to the purification system, by employing a four-stage water purification treatment system, the aquaculture wastewater can be used after being circularly purified, and zero wastewater discharge is almost realized, thereby avoiding pollution to the surrounding water environment.
Owner:SHANGHAI OCEAN UNIV

Sponge city construction based road rainwater collection and drainage system

PendingCN108894277ARealize the collection of emissionsFast centralized storageSewerage structuresGeneral water supply conservationPipeflowRoad surface
The invention relates to the field of sponge city construction, in particular to a sponge city construction based road rainwater collection and drainage system. The sponge city construction based roadrainwater collection and drainage system comprises a roadway area, a green belt area, a pavement area and a back green area which are respectively arranged on the road, a rainwater collecting deviceand a roadway drainage shaft which is used for draining rainwater collected through the rainwater collecting device are arranged in the roadway area, a soakage pit used for infiltrating rainwater below the ground is arranged in the green belt area, an overflow rainwater well, a rainwater collecting module, a water jet irrigation device and a main rainwater delivery pipeline are arranged in the back green area, and the overflow rainwater well, the rainwater collecting module, the water jet irrigation device and the main rainwater delivery pipe are mutually communicated with the rainwater collecting device, the roadway drainage shaft and the soakage pit through a rainwater collecting pipe. By the arrangement, the rainwater can be effectively collected and timely dredged and utilized, the problem about urban road waterlogging is greatly alleviated, and the system is energy saving and environment friendly and can be widely promoted.
Owner:青岛瑞源工程集团有限公司

Road-dependent rainwater purification and storage ecological utilization system in northern cities

The invention relates to the technical field of urban construction, in particular to a road-dependent rainwater purification and storage ecological utilization system in northern cities, comprising aroad central drainage green plant unit, a roadside drainage unit, a roadside surface green plant purification unit, an underground seepage storage unit and rainwater wetland gardens, wherein due to the road central drainage green plant unit, the surface water permeable area of the pavement is increased; the drainage ditch can effectively reduce the garbage blocking the pavement drainage outlet, accelerate the drainage velocity, and prevent the snow water containing snow melting agent from flowing into the green belt in winter; due to the sidewalk drain ditch, excessive rainwater on the pavement is introduced into the roadside surface green plant purification unit to increase the infiltration area and time of the rainwater; the underground seepage storage unit is set up to store rainwater for later use; due to the rainwater wetland gardens, the rainwater infiltration area and rainwater retention time can be enlarged in rainy season; and the rainwater wetland gardens and the roadside surface green plant purification unit are connected in ditches, thus greatly reducing the amount and area of road water.
Owner:于佳惠

Comprehensive prevention and control system applied to gravel soil side slope

The invention belongs to the technical field of geotechnical engineering, and discloses a comprehensive prevention and control system applied to a gravel soil side slope. According to the comprehensive prevention and control system, the good slope anti-seepage effect is achieved by burying drainage blind pipes and rapid drainage pipes in a slope surface layer soil body, arranging an intercepting ditch at the top of the slope, arranging a drainage channel at the foot of the slope and performing planting and greening on the slope surface, and the influence of surface water infiltration such as rainfall on the slope stability is reduced; after spring type spiral steel bars are put into pile holes, concrete doped with an expanding agent is poured into the pile holes to form miniature anti-slide piles, prestressed anchor cables are arranged to improve the shear strength of the side slope, and the stability among a potential sliding surface upper landslide mass, a potential sliding belt anda lower stable soil mass is enhanced; a plain concrete retaining wall is arranged at the foot of the slope to support the side slope, and a deep drainage pipe is drilled in the concentrated seepage area to effectively cut off the concentrated seepage, and water is collected and guided out of the slope; and finally, the anti-seepage drainage and reinforcement effects on the side slope are remarkable, and compared with traditional electro-osmosis drainage, energy consumption is reduced, economic benefits are remarkable, and operability is high.
Owner:TIANJIN CHENGJIAN UNIV +1

Reinforcement protective structure of large spoil disposal area in mountainous area

ActiveCN102425175ASolve stable technical problemsReduce churnExcavationsSewage drainingChipsealInstability
The invention discloses a reinforcement protective structure of a large spoil disposal area in a mountainous area, which is capable of effectively solving the technical problem of instability of the large spoil disposal area in the mountainous area, reducing water loss and soil erosion and avoiding the anthropogenic geologic hazard problems caused by the abandoned spoil. The reinforcement protective structure comprises anti-slide piles, a retaining plank, a macadam reversed filter, a main water seepage blind ditch, branch water seepage blind ditches, an annular catchwater, a longitudinal drainage trench, catchwaters and a drainage chute, wherein the anti-slide piles are arranged on an exit slope toe of the spoil disposal area and distributed at intervals along the cross direction of a groove; the retaining plank is arranged on the side of the anti-slide piles near to the spoil disposal area; the macadam reversed filter is filled behind the retaining plank; the main water seepage blind ditch is longitudinally arranged along the center of the groove on the bottom of the spoil disposal area; along the centre of the groove on the bottom of the spoil disposal area, the branch water seepage blind ditches are distributed in the shape of branches toward slopes on two sides and communicated with the main water seepage blind ditch; the annular catchwater is arranged along the surrounding mountain having more than 1m elevation from the top of the spoil disposal area, and stretched and connected to a natural groove on the exit of the spoil disposal area; the longitudinal drainage trench is arranged along the top center of the spoil disposal field and communicated with the natural groove; the catchwaters are arranged in the shape of branches from the longitudinal drainage trench of the spoil disposal area to the top two sides of the spoil disposal area and communicated with the longitudinal drainage trench; the drainage chute is arranged outside the retaining plank.
Owner:CHINA RAILWAY ERYUAN ENG GRP CO LTD

Water system communication system and implementation method thereof

The invention discloses a water system communication system and an implementation method thereof. A water system comprises dams, lakes and rivers, and the dams communicate with the lakes through pumpstation water lifting and draining systems and open channel landscape purification systems; if important traffic roads, high-rise buildings or high mountain zones are not arranged between the lakes and the rivers or between the two lakes, the lakes communicate with the rivers through the open channel landscape purification systems, and the two lakes communicate with each other through the open channel landscape purification systems; or/and if the important traffic highways, the high-rise buildings or the high mountain zones are arranged between the lakes and the rivers or between the two lakes, the lakes communicate with the rivers and the two lakes communicate with each other through a jacking pipe communication system, and the jacking pipe communication system penetrates through the important traffic highways, the high-rise buildings or the area below the high mountain zones. The water system communication system is simple in structure and low in cost, waterlogging drainage is effectively achieved through drainage of the drainage channel and lake flood storage, the drought resisting function is effectively achieved through a water lifting pump station, landscape aquatic plants are purified through the lakes and the drainage channel, and the greening water landscape effect is achieved.
Owner:HUBEI PROVINCIAL WATER RESOURCES & HYDROPOWER PLANNING SURVEY & DESIGN INST

Ultrahigh integrated plastic-steel grid reinforced soil abutment retaining wall structure and construction method thereof

The invention discloses an ultrahigh integrated plastic-steel grid reinforced soil abutment retaining wall structure and a construction method thereof. The structure comprises a first-level abutment, a second-level abutment, a third-level abutment and a fourth-level abutment which are distributed in a stepped mode from top to bottom along a mountain. The first-level abutment comprises a plurality of layers of integrated plastic-steel grids, a first-level bagged aggregate layer is arranged on the outside of the integrated plastic-steel grid away from the mountain, and a reinforced concrete panel is arranged on the outside of the first-level bagged aggregate layer. The second-level abutment, the third-level abutment and the fourth-level abutment each comprises a plurality of evenly distributed integrated plastic-steel grids, an aggregate reversed filter is arranged at the front ends of the integrated plastic-steel grids, a panel is arranged outside the aggregate reversed filter, a cap beam is arranged at the bottom of the panel and the bottom of the aggregate reversed filter, the cap beam is provided with a platform, and a catchwater is arranged on the platform. Compared with a traditional reinforced soil structure, the ultrahigh integrated plastic-steel grid reinforced soil abutment retaining wall structure has the advantages of being short in work time, convenient and quick to construct, high in strength, high in bearing capacity, large in friction coefficient, high in shock resistance, small in occupied space and the like.
Owner:NO 1 CONSTR ENG CO LTD OF GUIZHOU CONSTR & ENG GRP

Seeping rainwater pollutant intercepting treatment system for residences

InactiveCN107642142AThe function of stabilizing storagePlay the function of savingFatty/oily/floating substances removal devicesSewerage structuresAutomatic controlWater source
The invention provides a seeping rainwater pollutant intercepting treatment system for residences, comprising a pavement, rainwater collection wells, a guide pipe, a pollutant intercepting well, a filter well, a rainwater storage module, a drain pipe, a municipal network, a lawn, a regulation and storage reservoir, a water pump and a water pumping pipe. The seeping rainwater pollutant interceptingtreatment system for residences has the advantages that the structure is simple, the stress bearing performance is good, the system is capable of recycling, storing, filtering and purifying rainwater, the water ponding problem is effectively solved for residences, the rainwater regulation and storage function is achieved, climate conditions are improved for the residences, the hot island effect is relieved, the system can also improve noise pollution for residences, the problems, for instance, an existing urban drainage network system is unable to solve inner waterlogging due to storm runoffscan be solved before a storm, automatic control is provided for rain collection, pollutant interception, storage, discharging, peak-weakening regulation and storage, inner waterlogging relief and thelike, and the system is ecological and environmentally friendly and helps improve underground water resources, the ecology and other environments.
Owner:SHENYANG JIANZHU UNIVERSITY

Efficient ecological purification system for farmland discharge

The invention provides an efficient ecological purification system for a farmland discharge and a building method of the efficient ecological purification system for the farmland discharge, and belongs to the technical field of agricultural non-point source pollution treatment and the technical field of agricultural engineering. The system is composed of a farmland escape canal, detention ponds, awater distribution canal, an integrated-flow constructed wetland, a porous structure protective slope, a main discharge canal and a return pipeline. According to the efficient ecological purificationsystem for the farmland discharge and the building method of the efficient ecological purification system for the farmland discharge, an efficient treatment mode is provided for rural non-point source pollution, and integrated ecological means for slope protecting and pollutant intercepting are built for regulation of black and odorous rivers and eutrophic rivers at the same time, and the efficient ecological purification system for the farmland discharge and the building method of the efficient ecological purification system for the farmland discharge are low in capital construction investment, low in operating cost and convenient to operate and manage, has a good landscape effect, and has wide application prospects.
Owner:DONGHUA UNIV

Balcony roof organic imitation field cultivation equipment

The invention discloses balcony roof organic imitation field cultivation equipment, which comprises a cultivation box made of a heat preservation material, wherein a cover plate is arranged at the topof the cultivation box; a plurality of cultivation holes are formed in the cover plate; a water storage tank is arranged at the bottom of the cultivation box; a perforated plate is arranged between the water storage tank and the cultivation box; a full-liquid reflux device is arranged on the water storage tank; and the water is discharged after the water under the soil is fully permeated. With this arrangement, the balcony roof is well ventilated, and even relatively sealed air can still enter the cultivation box from the gap around the stem of the plant. The evaporation rate of soil moisturein the cultivation box is slow, the soil temperature is relatively stable, and is close to the average temperature, so that the problems that high temperature and water shortage of plant roots in high temperature period cause poor growth or death, soil is easy to freeze and destroy root system during low temperature and frost period, heavy rain causes soil and fertilizer loss and blocked sewers,water accumulation causes anaerobic respiration of roots to produce toxic substances, water evaporates quickly and soil salinization hardening is easy to occur when watering too many times, and spaceis large for weeds to grow are solved. All experimental plant varieties grow well.
Owner:刘永

Water-saving and salinity-controlling planting method of oil sunflower in saline-alkali wetland

The invention relates to a water-saving and salinity-controlling planting method of oil sunflower in saline-alkali wetland and belongs to the technical field of crop planting with an aim to solve thetechnical problem that in arid or semi-arid areas with shortage of fresh water resources, high underground water and heavy saline-alkali soil, the oil sunflower planted in the saline-alkali wetland islow in emergency rate and survival rate of seedlings. The key point of the technical scheme to the problem lies in that the method includes that 1, land leveling and preparation must act according tocircumstances, and before winter irrigation of alkali-affected soil, farm manure, calcium superphosphate and chemical improver treatment are performed; 2, furrow ridges are divided by adopting wide-narrow rows, the oil sunflower is sown in side furrows of the ridges after ridge forming and film covering, and fertilizer is applied to bottoms of the furrows; 3, in oil sunflower growing period, onlyone furrow irrigation is needed, no accumulative water is caused in the field after irrigation, and no irrigation is needed if heavy rainfall is available in the seedling period. With the method, thetechnical shortcoming that the low-lying saline-alkali wetland is less prone to dry farming is overcome, natural rainfall is sufficiently utilized, irrigation water is saved, and the effect of improving the seedling rate and yield is obvious.
Owner:INST OF AGRI RESOURCES & ENVIRONMENT NINGXIA ACAD OF AGRI & FORESTRY SCI NINGXIA KEY LAB OF SOIL & PLANT NUTRITION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products