Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit

A construction method and deep foundation pit technology, which can be used in basic structure engineering, soil protection, construction, etc., and can solve problems such as cracks, uneven subsidence, and inclination

Inactive Publication Date: 2012-03-21
中铁二十二局集团第三工程有限公司
View PDF5 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If the built buildings, pipelines, and road surfaces are located within the radius of influence, and no

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
  • Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
  • Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] Now illustrate the present invention in conjunction with accompanying drawing and embodiment.

[0022] A construction method for controlling settlement around deep foundation pits by using dewatering and recharging, which is to accurately determine the number of dewatering wells and the depth of dewatering wells in the foundation pit by calculating the water inflow of the foundation pit under the action of confined water. And ensure the construction quality of wells. Such as figure 1 , 4 As shown, the dewatering well 1 is drilled with an engineering drilling rig, and the diameter of the drilled hole is not less than 219mm. 10 meters into the strong weathering, and 1 meter into the moderately weathered rock formation, and at the same time ensure that the precipitation is not less than 6 meters away from the bottom mark of the bearing layer at the end of the engineering pile. In order to ensure good water permeability and mud and sand infiltration, adopt The steel pi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method by adopting dewatering and water recharging to control sedimentation surrounding a deep foundation pit, which comprises the following steps that: quantity and depth of dewatering wells are accurately determined by calculating water inflow of the deep foundation pit under the action of pressure water and the construction quality of finished wells is guaranteed; aquifers and pervious beds of the soil outside the foundation pit are determined through a geological exploration report, a target soil layer to be recharged is calculated, and a steel sleeve is sent to the target soil layer through a method for drilling a slope inside the foundation pit; a high-level water tank is arranged on the top part of the foundation pit, the water outlet of the high-level water tank is connected with a recharging well opening, water inside the foundation pit is pumped by a high-pressure pump to the high-level water tank and then to be pressed to the recharging well through the high-level pressure and to reach the recharged target soil layer. By utilizing the method, the underground water level inside the foundation pit can be maintained at a set water level, so a favorable condition can be created to the project construction. At the same time, the underground water level outside the foundation pit is adjusted to be stably maintained within a warning level, so powerful guarantee can be created for the safety of roads and buildings outside the foundation pit.

Description

technical field [0001] The invention relates to a method for controlling the settlement of buildings (structures) around the foundation pit during the construction of deep foundation pits, especially in the construction of deep foundation pits in old urban areas with narrow construction sites. Background technique [0002] With the reconstruction of old cities and the development of urban traffic construction in China, the construction of deep foundation pits in China is increasing continuously. The traditional dewatering construction method of deep foundation pits uses simple well point dewatering, but after using well point dewatering, it is very easy to cause adjacent buildings, Cracking and sinking of pipelines and road surfaces. In recent years, major accidents caused by this are not uncommon. Therefore, special care should be taken in the precipitation of deep foundation pits and corresponding countermeasures should be taken. [0003] There are two main purposes of f...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D3/00E02D19/10
Inventor 周长喜赵鑫宋志洪胡仁喜周华荣何伯绍
Owner 中铁二十二局集团第三工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products