Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
A construction method and deep foundation pit technology, which can be used in basic structure engineering, soil protection, construction, etc., and can solve problems such as cracks, uneven subsidence, and inclination
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] Now illustrate the present invention in conjunction with accompanying drawing and embodiment.
[0022] A construction method for controlling settlement around deep foundation pits by using dewatering and recharging, which is to accurately determine the number of dewatering wells and the depth of dewatering wells in the foundation pit by calculating the water inflow of the foundation pit under the action of confined water. And ensure the construction quality of wells. Such as figure 1 , 4 As shown, the dewatering well 1 is drilled with an engineering drilling rig, and the diameter of the drilled hole is not less than 219mm. 10 meters into the strong weathering, and 1 meter into the moderately weathered rock formation, and at the same time ensure that the precipitation is not less than 6 meters away from the bottom mark of the bearing layer at the end of the engineering pile. In order to ensure good water permeability and mud and sand infiltration, adopt The steel pi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com