Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1078 results about "Water well" patented technology

A well is an excavation or structure created in the ground by digging, driving, or drilling to access liquid resources, usually water. The oldest and most common kind of well is a water well, to access groundwater in underground aquifers. The well water is drawn up by a pump, or using containers, such as buckets, that are raised mechanically or by hand. Water can also be injected back into the aquifer through the well. Wells were first constructed at least eight thousand years ago and historically vary in construction from a simple scoop in the sediment of a dry watercourse to the qanats of Iran, and the stepwells and sakiehs of India. Placing a lining in the well shaft helps create stability, and linings of wood or wickerwork date back at least as far as the Iron Age.

Intelligent control system and method for mine water underground treatment, medium and electronic equipment

The invention relates to an intelligent control system and method for mine water underground treatment, a medium and electronic equipment.The system comprises a water quality online monitoring module, an automatic control module, an intelligent chemical adding module and a calibration optimization module, and the system responds to mine water quality changes in real time based on mine water quality online monitoring data and a chemical adding prediction model; the agent adding strategy is dynamically adjusted, accurate agent adding is achieved, the mine water underground treatment effect is effectively improved, the operation and maintenance cost of an underground treatment system is reduced, and the reliability is improved. The control system disclosed by the invention has relatively high automation and intelligence levels, can adapt to complex water quality conditions and large-scale mine water treatment requirements, provides an efficient, economic and environment-friendly solution for mine area water resource management, and has a wide application prospect.
Owner:NAT INST OF CLEAN AND LOW CARBON ENERGY +1

Method for constructing twin management and control system of urban drainage unit based on Al

The invention provides a method for constructing an urban drainage unit twin system based on an AI data analysis technology. The drainage unit twin system is composed of an online monitoring device, a network communication system and a remote monitoring platform. The NBIOT or OneNET technology is adopted to carry out networking on the online monitoring device, so that online accurate data acquisition and real-time transmission of a drainage unit pipe network catchment point, a drainage port and a rainfall station intelligent terminal carrying lightweight model are realized; and the remote monitoring platform is combined with an unreal engine technology to truly reflect a 3D real scene of the drainage unit. The intelligent monitoring system has a plurality of data monitoring functions such as rainfall, underground liquid level, flow velocity and flow, water quality, pavement ponding and well lid abnormity alarm monitoring, and provides a comprehensive data source for a drainage unit twin system. The AI technology is used for comprehensively mastering the condition of a drainage system, and visual monitoring of pavement ponding and waterlogging in the urban drainage unit and intelligent monitoring of a drainage pipe network are achieved.
Owner:SHANGHAI ZHONGJING HANDING DIGITAL TECH CO LTD

Seawater cooling control system and method

The invention provides a seawater cooling control system and method which are applied to the technical field of ocean engineering, and the seawater cooling control system comprises a cooling water well, a first temperature sensor, a water level gauge, a water suction pump, a water delivery pump, a monitoring buoy, a second temperature sensor, a flow meter and a controller. The first temperature sensor and the second temperature sensor monitor the temperature in the well and the coral reef area and the water flow speed of the flow velocity metering area respectively, the water level gauge ensures that the water volume in the well is stable, and data are analyzed in real time through the controller to generate a control instruction. The difference value between the environment temperature and the whitening threshold value, the cooling water temperature in the well and the coral reef flow speed serve as input variables, the flow requirement of the water delivery pump is dynamically calculated through a preset rule base, and self-adaptive adjustment is achieved. Through cooperative feedback of the double temperature sensors, it is ensured that the water delivery temperature is strictly controlled within a coral tolerance threshold value, and heat stress whitening is avoided. Layered water taking is combined with a fuzzy control algorithm, energy consumption is reduced compared with a traditional deepwater extraction scheme, and negative effects of shading measures on zooxanthellae are avoided.
Owner:HAINAN RES INST OF ZHEJIANG UNIV

Oil-water well acidification continuous construction electric control system based on multi-parameter monitoring

InactiveCN120506211ASurveyConstructionsAcid etchingFuzzy sliding mode control
The invention discloses an oil-water well acidification continuous construction electric control system based on multi-parameter monitoring, and relates to the technical field related to acidification control in oil-gas field development, and the system comprises a multi-source data fusion monitoring module which integrates wellhead pressure, temperature, flow, pH value, H2S concentration and acid liquid conductivity, and an underground microwave imaging sensor carries out multi-physical quantity collection; a multi-objective optimization controller is designed, and the acid etching depth, the crack flow conductivity and the construction cost are balanced; the self-adaptive construction control module is based on a variable-frequency and variable-speed acid pump system controlled by a fuzzy sliding mode and is used for realizing stepless regulation of displacement; an intelligent shunting system is arranged, and acid liquor distribution is dynamically adjusted according to the suction volume of each layer section. According to the variable-frequency acid pump system based on fuzzy sliding mode control, stepless adjustment of the displacement is achieved; the intelligent flow distribution system dynamically prepares liquid according to the suction volume of each layer section; and through a three-stage safety interlocking mechanism, power can be cut off and emergency acid discharge can be started within 0.5 second when the temperature rise is greater than or the pressure suddenly changes, so that the well control risk is reduced.
Owner:XIAN CHANGZE PETROCHEMICAL TECH CO LTD

Oil-water well liquid production profile recognition and inversion method, system and program product

The invention discloses an oil-water well liquid production profile identification and inversion method, system and program product, relates to the technical field of oil-gas field development, and solves the problems that in an existing liquid production profile monitoring method based on DAS and DTS technologies, DAS signals are prone to being interfered by fluid flow, the signal quality is poor, liquid point information cannot be accurately reflected, and the reliability is poor. The problems that liquid production profile information of DTS signal inversion lacks enough spatial constraint conditions, and the inversion result is large in deviation are solved. According to the method, the local liquid production characteristics in the DAS signals are extracted through blind source separation, the liquid outlet point positions are effectively recognized in combination with a statistical screening method, the recognized liquid outlet point positions serve as constraint conditions to be introduced into the DTS inversion process, and the precision and stability of the inversion result are effectively improved; the method not only overcomes the limitation of a traditional F-K spectral analysis method in an oil-water well environment, but also can introduce effective spatial constraints in DTS inversion, significantly reduces inversion errors, and improves the interpretation precision of a liquid production profile.
Owner:CHENGDU NORTH OIL EXPLORATION DEV TECH

End-to-end oil reservoir history fitting method based on flow matching

The invention discloses an end-to-end oil reservoir history fitting method based on flow matching, which belongs to the field of petroleum engineering, and comprises the following steps: step 1, collecting and sorting oil reservoir geological parameters and oil-water well production dynamic data, constructing a data set, and carrying out data preprocessing; step 2, constructing a flow matching infrastructure; step 3, constructing an improved U-shaped network for flow matching velocity field prediction; 4, constructing an ordinary differential equation solver to realize data generation; and 5, integrating and packaging the flow matching infrastructure, improving the U-shaped network and an ordinary differential equation solver to obtain a complete flow matching model, and realizing end-to-end dynamic history fitting of the oil reservoir. And directly inputting a production dynamic condition by utilizing the trained end-to-end flow matching model to generate an oil reservoir parameter field sample conforming to the condition. In the process, additional intermediate link conversion is not needed, and dynamic matching and accurate parameter adjustment of the oil reservoir model can be achieved.
Owner:QINGDAO UNIV OF TECH

Milling and Collecting Debris in Depleted or Sub-Hydrostatic Wells

An approach to milling obstructions in sub-hydrostatic wells uses a bottom hole assembly. The bottom hole assembly includes a tool to collect debris downhole and then mechanically, rather than hydraulically, transport the debris to the surface after milling.
Owner:SAUDI ARABIAN OIL CO

Gravity satellite groundwater storage variable vertical signal separation method based on physical model

The invention discloses a gravity satellite groundwater storage variable vertical signal separation method based on a physical model, and the method comprises the steps: S1, building a physical response model of ground surface deformation and gravity change and groundwater storage variables, and enabling the physical response model to comprise a ground surface deformation response model and a gravity change response model; the method specifically comprises the following steps: step S2, constructing a gravity satellite and InSAR data joint inversion framework, and establishing an observation equation set; s3, regularization constraint conditions are introduced, and a weighted least square method is adopted for solving; and S4, carrying out groundwater reserve vertical separation and verification based on a mass conservation principle. The method overcomes the defect that an existing method depends on dense well observation data, fine monitoring of groundwater storage variables is achieved through physical model constraints, and the method can be widely applied to regional groundwater resource monitoring and management.
Owner:NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER

Interwell connectivity quantification and analysis method and device

The invention discloses an inter-well connectivity quantification and analysis method and device, and relates to the technical field of water drive development, and the method comprises the steps: carrying out the interlayer division of an original model, and determining the distribution information of a water injection well and a producing well; an oil reservoir is divided into a plurality of grid units through a geometric segmentation method, and it is ensured that the water injection wells and the oil production wells are located in the grid units. And dividing a control area for each well by using a division rule, and determining the affiliation of the grid units through Euclidean distance comparison. And obtaining the conductivity between two adjacent grid units divided by the control boundary. And respectively evaluating the production and water injection capacities of the well by using the production index and the water injection index. And based on a finite volume method, constructing a mass conservation equation for the grid units, and carrying out iterative solution until convergence. And traversing the conductivity connectivity table to calculate a flow component, accumulating to obtain a total flow, deducing an inter-well connectivity coefficient according to the total flow, and realizing quantitative evaluation of the inter-well connectivity coefficient. The problems of how to optimize the injection-production well pattern design and how to improve the water drive development effect and the oil reservoir recovery efficiency are solved.
Owner:XI'AN PETROLEUM UNIVERSITY

Foundation pit dewatering system and foundation pit dewatering arrangement method

The invention relates to the technical field of foundation pit construction, in particular to a foundation pit dewatering system and a foundation pit dewatering arrangement method.The foundation pit dewatering system comprises a first-stage platform, a second-stage platform and a third-stage platform which are arranged around a foundation pit, and the elevations of the first-stage platform, the second-stage platform and the third-stage platform are sequentially decreased; a plurality of first dewatering deep wells are arranged on the first-stage platform, a plurality of second dewatering deep wells are arranged on the second-stage platform, and a plurality of third dewatering deep wells are arranged on the third-stage platform; drainage ditches and / or water collecting wells are dug in the base of the foundation pit; digging a drainage channel at the top of the foundation pit; sewage in the first precipitation deep well, the second precipitation deep well, the third precipitation deep well, the drainage ditch and / or the water collecting well is discharged into the drainage channel and discharged into the sea through the drainage channel. According to the foundation pit dewatering system, through scientific arrangement of the graded dewatering deep wells and efficient cooperation of drainage facilities, the limitation of a traditional dewatering technology under the tidal influence and complex geological conditions is overcome, the construction safety, reliability and efficiency are improved, and the stability of a foundation pit is enhanced.
Owner:CCCC FOURTH HARBOR ENG CO LTD +2

Offshore oilfield subsection water injection parameter design method based on communication unit delimitation

An offshore oilfield segmented water injection parameter design method based on communication unit demarcation comprises the specific steps that S1, an offshore loose sandstone longitudinal multilayer oil reservoir inter-well connectivity model is constructed, an inter-well communication network is constructed, and the bottom hole pressure of each well and the water content of each sand prevention section are calculated; matching the production dynamics calculated by the model with the actual historical production dynamics by optimizing the characteristic parameters, realizing the inversion solution of the model parameters, and determining a historical fitting objective function suitable for the connected model; and S2, determining a water injection splitting coefficient, water injection efficiency and a fluid channeling index of each layer of water injection well of the oil reservoir according to the inter-well connectivity model of the offshore loose sandstone longitudinal multi-layer oil reservoir constructed in the S1. Aiming at the problem that a production well of the offshore loose sandstone reservoir is easy to generate water channeling or water logging and the like, in combination with a real-time production allocation and injection allocation production algorithm, accurate inversion of the connectivity model and real-time prediction of the production dynamics of an oil-water well are realized according to geological characteristics, development dynamics and construction of the connectivity model of the offshore loose sandstone reservoir.
Owner:CHINA NATIONAL OFFSHORE OIL (CHINA) CO LTD +1

Pipe grabbing system for building water well vertical pipe construction

The invention discloses a pipe grabbing system for building water well vertical pipe construction, and relates to the technical field of building mechanical and electrical installation, the pipe grabbing system comprises a pipe grabbing mechanism, a rotating disc, a lifting rod, a base, a visual module and a controller; the controller is configured to acquire image data fed back by the visual module if pipe grabbing demand information initiated by a user is received, and perform pipeline identification based on the image data to obtain pipe diameter data of a pipeline; a pipe grabbing control quantity is generated based on the pipe diameter data, a pipe grabbing control instruction is sent to a pipe grabbing mechanism according to the pipe grabbing control quantity, a rotating mechanism is controlled to lift the pipeline away from the ground, and a rotating disc is controlled to rotate; and calling the image data, determining a pipeline mounting position, generating a pipeline height movement amount and a pipeline positioning movement amount, sending a pipeline height control instruction to the lifting rod according to the pipeline height movement amount, and sending a pipeline positioning control instruction to the rotating mechanism according to the pipeline positioning movement amount. The construction method has the effect of improving the construction efficiency.
Owner:CHINA CONSTR EIGHTH BUREAU SOUTH CHINA CONSTR CO LTD

Method for predicting and controlling water injection pressure rise of water injection well

The invention provides a method for predicting and controlling water injection pressure rise of a water injection well, which comprises the following steps of: 1, collecting data of the water injection well according to different characteristics of each stage of water injection development of an oil reservoir; 2, according to the water injection well data, water injection well dynamic analysis is conducted; 3, establishing a water injection well water injection pressure rise prediction model according to oil reservoir factors by taking the water injection pressure as response and the factors influencing the water injection pressure rise as variables; and 4, according to the water injection well water injection pressure rise prediction model, a water injection well pressure rise control method is formulated. According to the water injection well water injection pressure rise prediction and control method, the prediction model is established, the water injection well pressure rise trend is predicted according to the model, a targeted control method is formulated, advanced early warning is achieved, effective water injection is guaranteed, and the purposes of more water injection and good water injection are achieved.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

Rainwater and wastewater recycling system for construction site

The invention provides a rainwater and wastewater recycling system for a construction site, and relates to the technical field of rainwater collection, the rainwater and wastewater recycling system comprises an underground water well, a water collecting tank is arranged at the upper end of the underground water well, a center shaft is installed at the circle center of the underground water well, and the water collecting tank is rotatably installed on the surface of the center shaft through a bearing; an unfolding assembly is arranged at the top of the water collecting tank, the water spraying rods can be unfolded and folded through the unfolding assembly, in the unfolding state, the plastic cloth between the two water spraying rods can be unfolded to form an umbrella-shaped structure, and rainwater flows into the water collecting tank through the surfaces of the different plastic cloth; impurities and soil in rainwater are filtered in the space formed by the interlayers in the water collecting tank, then the rainwater is collected by the underground water well, when the water spraying rod is folded, the rainwater collected in the underground water well can serve as dust falling spraying water to be conveyed to the water spraying rod, rainwater collection and recycling are achieved, and the device is convenient to install and suitable for a construction site.
Owner:HUBEI IND CONSTR GRP

Settling funnel hydraulic gradient driven water replenishing ore dissolving salt lake brine mining method and system

The invention discloses a salt lake brine mining method and system for hydraulically gradient-driven water replenishing and ore dissolving of a sedimentation funnel, and relates to the technical field of salt lake mineral resource development, the method comprises the following steps: S1, collecting water level data of a sedimentation funnel area, calculating gradient distribution, dividing functional areas, and generating zoning parameters; s2, based on the partition parameters, a water injection well network is arranged in the gradient direction, water injection parameters are determined according to the water level difference, and a well network scheme is generated; s3, based on a well pattern scheme, injecting the proportioning solvent into an ore bed in a layered manner to form a directional seepage field, and generating solute transport data; s4, on the basis of solute transport data, enriched brine is extracted in the collection area, the concentration is monitored, and brine parameters are generated; and S5, based on the deviation between the brine parameter and the target value, calculating the regulation amount, adjusting the injection-production parameter to maintain dynamic balance, and outputting the salt lake brine with the target concentration. By regulating and controlling the hydraulic gradient, the form of the settlement funnel is stabilized, the phenomena of stratum disturbance and ground settlement are reduced, and the ecological risk is reduced.
Owner:QINGHAI CITIC GUOAN SCI & TECH DEV CO LTD

Airport area underground water and surface water system coupling seepage regulation and control method and system

The invention discloses an airport area underground water and surface water system coupling seepage regulation and control method and system, and the method comprises the steps: employing a multi-source data fusion investigation mode to find out regional stratum and structure characteristics, and determining an underground water occurrence migration rule and a surface water and underground water supplement and drainage relation; constructing a coupling seepage model of the underground water and the surface water system under the current condition by applying a numerical simulation method, and defining a dynamic association mechanism of the underground water and the surface water system in time and space; based on a simulation result, determining a transformation scheme that a main stream adopts a double-hole box culvert and a branch stream adopts a single-hole box culvert, and arranging an electric gate at the box culvert; arranging monitoring points of groundwater level, pore water pressure and surface water system flow in combination with field spring water and well distribution, and constructing a cooperative monitoring network; the coupling seepage law of underground water and surface water systems is analyzed based on monitoring data, and the opening degree of a box culvert electric gate is dynamically adjusted to control rising of the underground water level in the flood period. The stability of a water system in an airport area is ensured.
Owner:SHANGHAI CIVIL AVIATION NEW ERA AIRPORT DESIGN & RES INST CO LTD

Twin-well brine mining device capable of increasing salt mine brine ore content and multi-well series connection method of twin-well brine mining device

The invention relates to the technical field of well mine salt mining, in particular to a twin-well brine mining device capable of increasing salt mine brine content and a multi-well series connection method thereof, the device comprises a newly-built well unit, a single-well convection brine mining process is set, and the newly-built well unit comprises a water injection well and a brine mining well; the old well unit adopts a twin-well convection brine extraction process and comprises a water injection well and a brine extraction well; the pipeline connecting system is used for communicating the brine extraction well of the newly-built well unit with the water injection well of the old well unit; the flow adjusting device is arranged on the pipeline connecting system and used for adjusting the flow in the pipeline; the central control system is used for monitoring and adjusting operation parameters of each well group; by establishing a series system between the newly-built well and the old well, graded utilization and circulation optimization of brine resources are achieved, a traditional independently-operated well group is converted into an organic whole for cooperative production, low-concentration brine generated during the groove building period of the newly-built well can be secondarily utilized by the old well, and therefore the utilization rate of the resources is remarkably increased.
Owner:HUNAN XIANGHENG SALT CHEM

Trajectory-controllable radial horizontal well drilling process

The invention discloses a track-controllable radial horizontal well drilling process, and relates to the field of drilling technologies and oil and gas exploitation. According to the technology, in the horizontal drilling operation process, tools needed for track control mainly comprise a steering tool and an orientation tool, in the horizontal drilling operation process, the two tools are matched and cooperatively work, precise control and adjustment of the well track are achieved, and the drilling task of the radial horizontal well can be efficiently completed. A track-controllable radial horizontal well drilling process mainly comprises the steps of borehole preparation, steering tool sitting hanging and positioning, casing windowing, directional deflecting, horizontal drilling and multi-branch horizontal well drilling, and multi-branch radial horizontal wells with different depths can be achieved through the complete process. Aiming at resources of small marginal oil reservoirs, fault block oil reservoirs, thin oil reservoirs, low-permeability oil reservoirs and the like with different depths, the oil drainage radius is greatly increased, the production capacity of oil and gas wells and the water injection efficiency of water injection wells are improved, and the method is economical, efficient and safe and is an effective means for old well transformation of oil fields, potential tapping of the oil reservoirs and stable production and yield increase.
Owner:SOUTHWEST PETROLEUM UNIV

Brine well wall anti-collapse structure and construction method and application thereof

The invention discloses a brine well wall anti-collapse structure and a construction method and application thereof. The brine well wall anti-collapse structure comprises a supporting disc cavity, a grouting blocking device and a supporting disc pouring body. The grouting blocker is a soft bag and is filled with a first grouting material so as to expand and block the opening of the cavity of the supporting disc; and the branch plate pouring body is formed by injecting second grouting material into the branch plate cavity, and is used for filling the branch plate cavity and plugging a gap between the grouting barrier device and the branch plate cavity. According to the invention, a composite grouting process system of branch plate grouting and high-pressure jet grouting is innovatively developed; a supporting disc structure is formed in a sand layer through expansion and extrusion, then an anti-seepage grouting material is injected through a grouting blocking device to form a sand prevention supporting layer, then a gap between a supporting disc and the grouting blocking device is recharged and solidified through a high-pressure rotary jet grouting technology, and finally a well wall overall reinforcing body formed by mutually meshing and connecting the grouting blocking device and the supporting disc structure is constructed. The problems that an existing brine well faces fine sand silting wells, soft soil layer frameworks are dissolved and collapsed and the like are solved.
Owner:QINGHAI INST OF SALT LAKES OF CHINESE ACAD OF SCI +2

Underground water distribution detection and drainage scheme design method

The invention discloses an underground water distribution detection and drainage scheme design method, which comprises the following steps: S1, carrying out a water lifting test, preliminarily judging the water inflow of underground water in a landslide area, and determining underground water distribution in the landslide area by utilizing a landslide section layout object detection line determined by drilling; s2, according to the landslide area underground water distribution condition determined by the water lifting test and the object detection line, a hydrological test drill hole is designed; s3, a hydrological test is carried out through the hydrological test drill hole, and the underground water type and hydrogeological parameters in the landslide area are quantitatively obtained; and S4, in combination with underground water distribution and hydrogeological parameters in the landslide area, designing a layout scheme of a water collecting well and a dewatering well in a drainage project. According to the groundwater distribution detection and drainage scheme design method, blind arrangement of drainage measures is avoided, the accuracy of groundwater evaluation and the pertinence of a treatment project are effectively improved, and an effective basis is provided for exploring groundwater distribution in a landslide area and subsequent treatment projects.
Owner:GUANGDONG PROVINCIAL GOVERNMENT LOAN REPAYMENT EXPRESSWAY MANAGEMENT CENT +3

Energy efficiency improving system for shallow ground heat exchanger

PendingCN120194427AHeat storage plantsGeothermal systemsTemperate climateSolar water
The invention discloses an energy efficiency improving system for a shallow buried pipe heat exchanger. A closed or semi-closed heat storage area unit is arranged in a surrounding mode through area heat insulation plates. The heat storage area unit comprises a plurality of heat storage wells, a plurality of shallow water lifting wells, a plurality of deep water lifting wells, a plurality of solar water heaters, a heat storage water tank, a plurality of U-shaped vertical buried pipes and a ground source heat pump machine room; the buried depth of the regional heat insulation plate is arranged in soil of an earth crust constant temperature zone and penetrates through an earth crust daily variable temperature zone and an earth crust annual variable temperature zone from top to bottom, the buried depth H of the regional heat insulation plate is larger than or equal to H2 + 0.5-1 m, and H2 is the depth of the annual variable temperature zone; the heat storage well is of an inner and outer sleeve type hollow structure provided with a plurality of horizontal branch pipes shaped like a cross or a Chinese character'jing ', and the horizontal branch pipes are arranged in soil of a crustal annual variable temperature zone and a constant temperature zone. The buried depth H of the upper horizontal branch pipe is greater than or equal to H1 + 0.5-1m, and the buried depth H of the lower horizontal branch pipe is greater than or equal to H2 + 0.5-1m; h1 is the daily variable temperature zone depth, and H2 is the annual variable temperature zone depth.
Owner:SHANDONG GRAD GROUP +1

Carbon sequestration CO2 multi-layer injection-production collaborative balance system and method

The invention discloses a carbon sequestration CO2 multi-layer injection and production collaborative balance system and method.The carbon sequestration CO2 multi-layer injection and production collaborative balance system comprises a multi-layer injection mechanism, a collaborative extraction mechanism and a regulation and control mechanism, the multi-layer injection mechanism comprises an injection well, an injection allocation device and a two-way packer, the injection well vertically penetrates through 2-4 target reservoirs, and the injection allocation device vertically penetrates through the two-way packer; each target reservoir in the injection well is correspondingly provided with an injection allocation device and a two-way packer, each injection allocation device comprises a pressure sensor, a flow controller and a communication module, the collaborative extraction mechanism comprises a plurality of water production wells, the water production wells are arranged on the periphery of the injection well, and the two-way packers are arranged on the periphery of the injection well. Each water production well corresponds to one target reservoir, an adjustable water pumping screen pipe, a pressure feedback valve and a flow metering device are correspondingly arranged in each water production well, the regulation and control mechanism comprises a controller and an optical fiber monitoring device, and the controller is electrically connected with the optical fiber monitoring device, the pressure sensor, the flow metering device and the pressure feedback valve. The carbon sequestration CO2 multi-layer injection-production collaborative balance system provided by the invention has the advantages of high safety and high efficiency.
Owner:HUANENG CLEAN ENERGY RES INST +1

Well submersible pump self-adaptive to water depth

The utility model relates to the technical field of submersible pumps, and discloses a well submersible pump self-adaptive to water depth, which comprises a mounting ring seat and a submersible pump, a locking column is mounted on the outer wall of the mounting ring seat, threads are arranged at the contact position of the locking column and the mounting ring seat, and a rotating handle for rotating is mounted at the outer end of the locking column. According to the well submersible pump capable of self-adapting to the water depth, after the submersible pump is put into a water well, the buoyancy plate floats on the water surface, so that the distance between a water inlet in the bottom end of the submersible pump and the water surface is adjusted, use is convenient, and manual hoisting control over the depth through a rope on the ground is not needed; the buoyancy plate can move up and down along with the water surface, so that a water inlet in the bottom end of the submersible pump keeps the same distance with the water surface all the time, the supporting screw is prevented from getting close to the water surface to suck impurities floating on the water surface, manual water pump position adjustment is not needed, and use is convenient.
Owner:LONGYAN NINE DRAGON WATER PUMP MFG

Device and method for simulating migration of pollutants under mining and tidal conditions

The invention discloses a device for simulating migration of pollutants under mining and tidal conditions. The device comprises an aquifer loading tank, a pollution tank simulation pollution source and a plastic pipe simulation pumping well are arranged in the tank; the left side and the right side of the aquifer loading groove are divided into a salt water chamber and a fresh water chamber by acrylic plates with seepage holes; the same constant water head device is arranged in the salt-fresh water chamber; and a tide device is arranged on the salt water chamber to simulate the tidal effect of seawater. The positions of the pollution tank and the pumping well are not fixed and can be adjusted; a plurality of salinity concentration monitoring devices are arranged on the rear side of the aquifer loading groove; the inhomogeneous medium of the coastal zone aquifer is simulated by filling the aquifer loading groove with sand samples in a layered manner, so that seawater invasion is simulated. The device can simulate the migration of pollutants in the aquifer under different tide conditions and exploitation conditions, monitor the concentration change of the pollutants and the water pressure change of each part in the horizontal direction in real time, and can simulate the migration situation of the pollutants under the combined action of tide coupling underground water exploitation.
Owner:HOHAI UNIV

An intelligent identification method for dominant seepage channels based on big data

The application discloses an intelligent identification method for dominant seepage channels based on big data, which comprises the following steps: collecting static geological data, dynamic development data and dynamic monitoring data of an oil reservoir and performing data processing; performing data quality analysis on the processed data and establishing a sample database; performing inter-well connectivity analysis and inter-well pressure response analysis in a plane according to the sample database, and identifying dominant channels in the plane; performing interlayer production and absorption law research in a vertical direction according to the sample database, predicting interlayer liquid production and absorption ratios and water cut, and identifying dominant interlayer positions in the vertical direction; and comprehensively identifying dominant seepage channels between each layer of a production well and an injection well based on the identified dominant channels in the plane and the dominant interlayer positions in the vertical direction.
Owner:CNOOC TIANJIN BRANCH

Anti-collapse frame for water conservancy water source well

The utility model provides an anti-collapse frame for a water conservancy water source well, which belongs to the technical field of water well collapse prevention and comprises a supporting device, the supporting device comprises symmetrically arranged flat-topped conical barrels, a plurality of supporting columns are vertically arrayed in the conical barrels, and the middle parts of the supporting columns are fixedly connected with connecting rings on the inner side walls of the conical barrels. The bottom end of the conical barrel is connected with a bottom ring seat and connected with the outer side wall of the supporting column, reinforcing columns are connected between the connecting ring and the bottom ring seat, a set of reinforcing columns are arranged in a semi-crossed mode and connected with the outer side wall of the supporting column, long plates are fixedly connected to the two sides of the outer portion of the conical barrel, positioning holes are formed in the long plates, and the interiors of the positioning holes are fixed through bolts. The utility model has the beneficial effects that the symmetrical conical barrels are mounted, the mounting blocks are inserted into the mounting grooves, and the symmetrical rack grooves are meshed with each other, so that the symmetrical conical barrels are mounted more tightly, and the symmetrical conical barrels are fixedly mounted by matching the positioning holes with bolts.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1

Large-span basement multi-stage water guide and drainage structure and construction method

The invention discloses a large-span basement multi-stage water guide and drainage structure and a construction method, and belongs to the technical field of building construction. The drainage guide pipes are hung below a main beam of a basement structure, and every two adjacent drainage guide pipes are connected through a three-way pipe. The two sides of the three-way pipe are in sealed connection with the drainage guide pipes on the two sides through fixing glue respectively, and the other side of the three-way pipe is vertically arranged upwards. The drainage branch pipe is hung below a secondary beam of the basement structure; the water inlet end of the drainage branch pipe is arranged in the dewatering well and connected with a water pump in the dewatering well, and accumulated water in the dewatering well is sucked through the water pump; the water outlet end of the drainage branch pipe is communicated with the three-way pipe between the drainage guide pipes; the water outlet end of the drainage guide pipe closest to the water-collecting well is communicated with the water-collecting well; the water collecting well is sequentially communicated with a peripheral drainage ditch and a municipal pipeline through a pipeline to drain accumulated water. The water guide and drainage system is optimized, and compared with traditional ground pipeline pulling and arranging, the problem that ground pipelines are arranged disorderly is solved, and convenience is provided for construction.
Owner:ZHONGTIAN CONSTR GROUP

A groundwater level monitoring system and method

The present invention discloses a groundwater level monitoring system and method, the system comprising: a collection terminal for acquiring groundwater level data, surface water level data, surface water flow data, water consumption data, the number of water wells, the water well pipeline pressure and environmental data; a data processing system for predicting the groundwater level in the next time period according to the groundwater level data, surface water level data, surface water flow data, water consumption data, the number of water wells, the water well pipeline pressure and environmental data, and obtaining the groundwater level prediction value; obtaining the groundwater level change trend according to the groundwater level data and the groundwater level prediction value; and a visualization platform for displaying the groundwater level change trend. Accurate prediction of the groundwater level is achieved.
Owner:山东华特智慧技术有限公司

Construction site water recycling system

The invention relates to the technical field of building construction, and discloses a construction site water recycling system which comprises a control module, a water well, a sedimentation tank, a water tank, an increasing pump and a spraying pipe. The sedimentation tank at least comprises a first purification tank and a second purification tank, a filtering wall is arranged on the top side of a wall between the two tanks, and a drainage pipe is assembled on the bottom side of the second purification tank; the well is communicated with the first purifying pond through a first pipeline; a first submersible pump at one end of the first pipeline is arranged in the well; the second purifying pond is connected with the water tank through a second pipeline, a second submersible pump at one end of the second pipeline is arranged in the second purifying pond, and a first gate valve, a water meter and a filter are sequentially arranged on the pipeline; the booster pump is connected with the water tank through a third pipeline with a second gate valve and connected with the spraying pipe through a fourth pipeline with a third gate valve. And the control module is electrically connected with the water meter and each gate valve, so that full-flow intelligent cooperative control of water source extraction, purification, transmission and distribution and spraying is realized.
Owner:CNNC HUACHEN CONSTR ENG CO LTD

Method and system for evaluating yield-increasing and injection-increasing aerodynamic force composite plug removal capacity of medium-low permeability reservoir

The invention discloses a method and a system for evaluating yield-increasing and injection-increasing aerodynamic force composite plug removal capability of medium-low permeability reservoirs, and relates to the technical field of oil-gas field development. The method comprises the following steps: determining to-be-measured well types, including oil wells or water wells; based on the type of the well to be measured, whether measures are taken or not is judged according to well selection conditions; if measures are taken, well deviation data are collected, and the maximum well deviation position and the maximum well deviation size are found; determining a transmission type according to the well deviation; aerodynamic force operation is carried out according to the transmission type; acidizing operation is carried out after the aerodynamic force operation; and evaluating the effect of the oil well or the water well after the measures are taken. The method solves the problem that large-scale transformation of the fractured thin and poor layer of the medium-low permeability reservoir is difficult to realize, so that reserves are difficult to effectively use; the problems that traditional fracturing transformation measures are long in construction period, high in measure cost and poor in economic benefit are solved. The problem that there is no effective treatment means for a thin layer or a thin interlayer is solved; and the problem of difficulty in measure effect evaluation after traditional process measures is solved.
Owner:PETROCHINA CO LTD