Automatic monitoring, adjusting and utilizing system for underground water level of building foundation trench
By designing an automatic monitoring, regulation and utilization system for groundwater level in building foundation trough, the leakage and humidity problems of traditional waterproofing systems in the face of changes in groundwater level and changes in construction environment are solved, and the dry environment of the basement and the effective utilization of groundwater resources are achieved. , extends the life of the building structure and has the advantages of energy conservation and emission reduction.
Patent Information
- Application Number
- CN202420167878.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-01-24
AI Technical Summary
When traditional building foundation trough waterproofing systems face changes in groundwater levels and construction environment variations, they can easily lead to basement leakage, indoor humidity and condensation problems, and lack effective automatic monitoring and adjustment methods, resulting in insufficient waterproofing quality and structural safety.
A system for automatic monitoring and regulating and utilization of groundwater level in building foundation troughs is designed, including high-level water catchment system and low-level monitoring and drainage system. Through the roof composite micro-slope structure and water intercepting slope, automatic monitoring and adjustment of groundwater level is achieved. , avoid leakage and humidity problems, and use surface water resources to improve the outdoor environment.
Effectively reduce basement leakage and humidity problems, improve the basement use environment quality, extend the life of building structures, and achieve energy conservation and emission reduction effects by recycling groundwater resources.
Smart Images

Figure CN221941401U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a building foundation trench, in particular to an automatic monitoring, regulating and utilizing system for underground water level in a building foundation trench, belonging to the field of building foundation trenches. Background Art
[0002] With the trend of high-quality development of building waterproofing projects, the "General Specification for Waterproofing of Buildings and Municipal Engineering" (GB55030-2022) came into being, in which "2.0.2 The design service life of engineering waterproofing shall comply with the following provisions: 1 The design service life of underground engineering waterproofing shall not be less than the service life of the engineering structure...". This shows the importance of waterproofing projects and the challenges to quality functions. At present, in the building design stage, for underground buildings where the annual groundwater head recorded in the geological survey report is higher than the building foundation slab, the anti-floating and waterproofing design scheme of the basement of the building generally considers the impact of groundwater in the natural environment on the building foundation, and the waterproof layer and the building structure work together permanently. According to traditional building structures and construction techniques, the waterproofing and moisture-proofing of the basement of a building is usually designed to adopt waterproof concrete structure self-waterproofing + two or three layers of waterproofing membrane + fertilizer trough 3:7 or 2:8 gray soil waterproof layer. However, due to the uncertainty of the perennial changes in groundwater levels, there are cyclical changes throughout the year. That is, in winter, the fertilizer trough enters a frozen dry period, and the groundwater level is the lowest. In summer, there is more rain, and the rainwater in the fertilizer trough is likely to obtain surface runoff and basically penetrate into the outer side of the basement exterior wall membrane waterproofing, forming pressurized water. Once the waterproof membrane is damaged and not properly pasted, the opening fails, and the current commercial concrete structure self-waterproofing shrinkage and cracking and other factors, there is a probability of more than 60% basement leakage. The remaining "non-leaking" building basements are mainly contributed by the groundwater level being lower than the bottom plate. The common quality problems of basement leakage and the phenomenon of condensation and dampness in the rainy season have always been the key difficulties and risk points of design and construction quality management in the construction industry, and have plagued generations of construction workers and users. The reasons are roughly as follows:
[0003] First, there are deviations between the natural environment and the survey results after the excavation of the foundation pit and during the construction process, as well as variations in the hydrogeological environment of the foundation pit after the excavation of the foundation pit (relative to the information in the geological survey report). That is, the original foundation of the design site is in a site without groundwater influence all year round, but after blasting and excavation, some building foundation pits have formed new artificial site foundation pit stagnant water environment conditions. Groundwater or stagnant water will still bring common anti-floating structure safety, dampness or leakage hazards to the environment of underground building structure anti-floating and basement use;
[0004] Secondly, there is a gap between the theoretical systematicness of the design and the shortcomings of the construction work in the quality control of construction technology and process, including limited construction environment conditions (poor feasibility and continuity of detailed construction methods), lack of inspection and testing (only spot checks can be carried out), inverted work procedures, cross-professional coordination and other quality marginal management defects.
[0005] Finally, the implementation process of the waterproof design scheme of the construction drawing is idealized. At present, the waterproof structure of the basement mainly achieves the waterproof goal of no seepage and no leakage through the "waterproof" scheme measures of the building structure, and rarely adopts the "unconditional" and "no hidden danger" intrinsically safe waterproof scheme of "reducing environmental water sources". And in terms of "water prevention" measures, from the selection and performance of waterproof materials (such as pre-laid anti-adhesive, self-adhesive waterproof membranes, water-stop steel plates, water-stop strips, impermeable concrete, etc.), to the construction process, such as the interface treatment between the membrane and the base layer, the node practices such as joints and closing parts, the protection of finished products during the building settlement process, and even the detection and inspection links, there are problems and contradictions in the continuity of the detailed processes of the implementation of concealed projects, the standardization of waterproof systems and the particularity of non-standard buildings; and in order to control the project cost, the design plan generally does not pay attention to the new underground fertilizer trough waterlogging geological environment variation formed on the foundation pit after the blasting excavation construction of the rock foundation, and thus it is necessary to consider anti-floating measures in the artificial geological waterlogging environment. Therefore, for the general underground building environment function quality, even if the building basement does not leak, the problem of moisture or even condensation is very common, and the cost of building environment maintenance such as dehumidification is also very high. Summary of the invention
[0006] In order to solve the common quality problems of basement leakage, indoor moisture, condensation and other common construction projects caused by traditional "structural waterproofing systems", the utility model designs an automatic monitoring, regulation and utilization system for the groundwater level in building foundation pits. As a necessary supplement to the "intrinsic safety" function of traditional building basement waterproofing systems, it can realize automatic monitoring and regulation and utilization of groundwater levels in building foundation pits; continuously, efficiently and dynamically eliminate the main causes of basement leakage and indoor moisture problems, and create a good indoor dry use environment function for building basements.
[0007] At the same time, surface water resources are utilized to create a moist and dust-free outdoor ecological environment for buildings, achieving the dual treatment effects of "prevention and drainage combined" for groundwater, thereby achieving the technical and economic goals of building waterproofing to have the same lifespan as the building structure as required by standards and specifications, and even extending the lifespan of the building. This also has practical significance for energy conservation and emission reduction in the construction of sponge cities.
[0008] The technical solution of the utility model is:
[0009] An automatic monitoring, regulating and utilizing system for underground water level in building foundation trenches, which is composed of a high-level water collection system and a low-level monitoring and drainage system;
[0010] The high-level water collection system consists of a roof composite micro-slope structure, a drainage pipe and a water collection well; it is used for water collection and drainage on the top of a basement without a ground building, and can quickly collect ground rainwater and greening irrigation water, and prevent the "roof" water on the basement top plate from leaking into the basement;
[0011] The composite micro-slope structure of the roof is a structural slope top plate, which is a cast-in-place reinforced concrete casting plate and is used as a roof plate of the basement; the structural slope top plate is a sloping roof structure; a waterproof membrane is bonded to the surface of the structural slope top plate, the purpose of which is to form a waterproof layer on the surface of the structural slope top plate, which plays a role in waterproofing and preventing water stagnation.
[0012] Furthermore, the slope of the composite micro-slope structure of the roof is between 1‰ and 2‰.
[0013] Furthermore, the roof composite micro-slope structure drains water in a local manner.
[0014] Furthermore, the waterproof membrane is preferably a polyethylene polypropylene waterproof membrane.
[0015] Furthermore, the waterproof membrane adopts a surface slurry self-adhesive construction process, and the waterproof membrane is directly bonded to the surface of the structural slope top plate before the concrete of the structural slope top plate is poured and finally set.
[0016] Furthermore, a plurality of mounting frames are provided at the bottom edge of the composite micro-slope structure of the roof for installing drainage pipes, which are used to collect the seepage water flowing down from the roof structure and discharge the collected water into a drainage well; the drainage well is arranged at the four corners of the basement floor to collect rainwater into the drainage well, thereby preventing rainwater from being directly discharged into the fertilizer trough and gathering into a leakage source; the drainage well can be a precast concrete rainwater inspection well for a municipal engineering product, and an independent rainwater storage tank or a grey water storage tank can also be used according to the construction conditions.
[0017] The low-level monitoring and drainage system consists of a water cut-off slope, a blind ditch at the bottom of the fertilizer trough, a monitoring well, a water level monitor and a drainage well; first, it is used to monitor and drain the groundwater level in the fertilizer trough of the building foundation pit. When the water level exceeds the preset water level line, such as the top elevation of the basement raft slab, the groundwater in the fertilizer trough is drained; second, it is used for early warning monitoring of the groundwater level in the fertilizer trough to control the automatic pumping of groundwater to reduce the risk of water floating or leakage.
[0018] Furthermore, the water interception slope is a foundation pit slope protection around the fertilizer tank, which is used to intercept groundwater around the building foundation pit;
[0019] The water-collecting blind ditch at the bottom of the fertilizer trough is a drainage ditch, which is used to intercept and collect groundwater in the fertilizer trough; the water-collecting blind ditch at the bottom of the fertilizer trough is filled with gravel for filtering water; the water-collecting blind ditch at the bottom of the fertilizer trough is set through the bottom of the fertilizer trough along the outer periphery of the building basement; the water-collecting blind ditch at the bottom of the fertilizer trough is connected to the lower part of the monitoring well and the drainage well respectively, and collects the collected groundwater into the monitoring well and the drainage well.
[0020] Furthermore, a blind pipe is provided in the blind ditch at the bottom of the fertilizer trough; the blind pipe is also called a plastic blind pipe or a seepage drainage blind pipe, and the main body of the blind pipe is wrapped with a geotextile as a filter membrane.
[0021] Further, the monitoring well is used to monitor the water level of groundwater in the fertilizer tank; the monitoring well is located on the front and rear sides of the building; openings are provided on the left and right sides of the lower part of the monitoring well, and the openings are connected to the blind ditch at the bottom of the fertilizer tank; a water level monitor is installed inside the monitoring well, and the water level monitor is used to monitor the water level in the monitoring well; a water level line is also provided on the inner wall of the monitoring well to observe the position of the groundwater level;
[0022] The drainage well is used to discharge the groundwater in the fertilizer trough; there are several drainage wells, which are arranged at the four corners of the fertilizer trough of the building; the bottom of the drainage well is connected to the water collection blind ditch at the bottom of the fertilizer trough; a ladder is provided on the inner wall of the drainage well to facilitate personnel to enter for inspection; a water pump is also installed in the drainage well; the water pump is used to pump out the groundwater in the drainage well; a drainage pipe is also connected to the water pump; the drainage pipe can be connected to the municipal drainage system, and can also be used for sprinkling water to reduce dust, greening irrigation, or rapid drainage.
[0023] Furthermore, if the building is located in a high-slope geographical environment or halfway up a mountain, a siphon-type drainage pipe can be set in the drainage well, and the groundwater level can be controlled according to the height of the elbow.
[0024] Furthermore, the depths of the monitoring well and the drainage well are lower than the bottom of the blind ditch at the bottom of the fertilizer trough.
[0025] Furthermore, the diameter of the monitoring wellhead is smaller than the diameter of the drainage wellhead.
[0026] Furthermore, the monitoring well and the drainage well are prefabricated concrete components and can be assembled and installed at the construction site.
[0027] The high-level water collection system can drain the top of the basement of the non-ground building to prevent ground water and rainwater from penetrating into the basement; at the same time, the composite micro-slope structure of the roof in the high-level water collection system combines the three working steps of pouring the basement top plate structure, roof slope adjustment, and rolled waterproofing to form a construction process that is formed synchronously with the structure, effectively shortening the construction period, saving and reducing the amount of water used for structural concrete maintenance, reducing costs, and at the same time reducing the hidden dangers of cracking and leakage of the self-waterproof concrete on the commercial concrete top plate, thereby improving the construction quality level.
[0028] The low-level monitoring and drainage system can monitor the groundwater in the fertilizer tank and discharge the groundwater, thereby preventing the groundwater in the fertilizer tank from leaking into the basement, effectively reducing the hidden dangers of underground waterproofing leakage, reducing condensation, moisture and mildew in the basement, and reducing the overload on the structure when the basement roof planting soil is saturated, ensuring structural safety and extending the service life of the waterproof membrane and building structure.
[0029] The beneficial effects of the utility model are:
[0030] 1. During the construction of a building, the utility model can effectively monitor the groundwater level of the foundation pit fertilizer trough, reduce or even avoid the risk of anti-floating damage to the building structure caused by the rising groundwater level; at the same time, it can also use groundwater to sprinkle water and reduce dust on the construction site, and the deep foundation pit slope support system does not need to be dismantled, and the permanent and temporary combination is fully utilized to achieve green construction;
[0031] 2. After the building is delivered for use, the utility model can effectively improve and enhance the quality and comfort of the indoor space environment of the basement;
[0032] 3. After the building is delivered for use, the utility model can improve the outdoor environment quality of the adjacent buildings. For construction projects with excellent structural defense, if the groundwater level is high, the groundwater can be pumped out and used through the regulation and circulation principle of the fertilizer trough groundwater, such as greening irrigation, moist road environment to improve the climate, etc., which can save a lot of tap water and is conducive to the realization of a sponge city.
[0033] The utility model is further described below in conjunction with the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a schematic diagram of the structure of a high-level water collection system of a building foundation trench groundwater level automatic monitoring, regulation and utilization system according to an embodiment of the utility model;
[0035] Figure 2 This is a schematic diagram of the overhead structure of a high-level water collection system of a building foundation pit groundwater level automatic monitoring and regulation and utilization system according to an embodiment of the utility model;
[0036] Figure 3 A schematic diagram of a low-level monitoring and drainage system of a building foundation pit groundwater level automatic monitoring and regulation and utilization system according to an embodiment of the utility model;
[0037] In the figure: 1 roof composite micro-slope structure, 2 drainage pipe, 3 water collection well, 4 water interception slope, 5 water collection blind ditch at the bottom of fertilizer trough, 51 blind pipe, 6 monitoring well, 7 water level monitor, 8 drainage well, 81 water pump, 811 drainage pipe, 9 fertilizer trough. DETAILED DESCRIPTION
[0038] The preferred embodiments of the present invention are described below. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention. Example
[0039] like Figure 1-3 As shown, a system for automatically monitoring, regulating and utilizing groundwater level in a building foundation trench is composed of a high-level water collection system and a low-level monitoring and drainage system.
[0040] The high-level water collection system is used for water collection and drainage on the top of basements without ground buildings. Generally, such basements are covered with planting soil for greening landscapes or roads. It can quickly collect ground rainwater and greening irrigation water, and prevent the "roof" water of the basement top plate from leaking into the basement.
[0041] The high-level water collection system is composed of a roof composite micro-slope structure 1, a drainage pipe 2 and a water collection well 3;
[0042] The roof composite micro-slope structure 1 is a structural slope top plate, which is a cast-in-place reinforced concrete casting plate and is used as a roof plate of the basement; the structural slope top plate is a slope roof structure; a waterproof membrane is bonded to the surface of the structural slope top plate, the purpose of which is to form a waterproof layer on the surface of the structural slope top plate, which plays a role in waterproofing and preventing water stagnation. The slope of the roof composite micro-slope structure 1 is between 1-2‰; the drainage of the roof composite micro-slope structure 1 is in the nearest way, and the water flows to the side without protruding ground buildings; the waterproof membrane is preferably a polyethylene polypropylene waterproof membrane; the waterproof membrane adopts the surface original slurry self-adhesive construction technology process, that is, before the concrete of the structure slope top plate is poured and finally set, the waterproof membrane is directly bonded to the surface of the structure slope top plate; the bottom edge of the slope of the roof composite micro-slope structure 1 is also provided with a plurality of semicircular mounting frames 11, and the mounting frames 11 are used to install prefabricated drainage pipes 2; the drainage pipes 2 are installed at the bottom edge of the slope of the roof composite micro-slope structure 1, and are used to collect the infiltration water flowing down from the roof structure, and discharge the collected water into the drainage well 3; the drainage well 3 is arranged at the four corners of the basement floor, and is used to collect rainwater to the drainage well 3, so as to avoid rainwater directly discharged into the fertilizer trough and then gathering into a leakage water source; the drainage well 3 can be a finished prefabricated concrete rainwater inspection well for municipal engineering. In addition, the water collection well 3 can also adopt an independent rainwater storage tank or a medium water storage tank according to the building conditions;
[0043] The low-level monitoring and drainage system is used to monitor and drain the groundwater level in the fertilizer tank 9 of the construction foundation pit; when the water level exceeds the preset water level line, such as the top elevation of the basement raft slab, the groundwater in the fertilizer tank 9 is drained; it is used for early warning monitoring of the groundwater level in the fertilizer tank 9 to control the automatic pumping of groundwater to reduce the risk of water buoyancy or leakage.
[0044] The low-level monitoring and drainage system consists of a water cut-off slope (i.e., a temporary support system structure of a deep foundation pit slope with a pile cap or soil nail wall, which is a combination of temporary and permanent support) 4, a blind ditch 5 at the bottom of the fertilizer trough, a monitoring well 6, a water level monitor 7, and a drainage well 8;
[0045] The water cut-off slope 4 is a foundation pit slope protection outside the fertilizer trough 9. It is a temporary structure for spraying anchors on the foundation pit support slope during the construction of the foundation pit. It can also be used in combination with permanent and temporary structures. The water cut-off slope 4 serves as the first water cut-off line of defense, and is used to intercept groundwater outside the construction foundation pit.
[0046] The water collection blind ditch 5 at the bottom of the fertilizer trough is a drainage ditch, which is used to intercept and collect groundwater in the fertilizer trough; the water collection blind ditch 5 at the bottom of the fertilizer trough is filled with stones for filtering water; the water collection blind ditch 5 at the bottom of the fertilizer trough is set through the bottom of the fertilizer trough 9 along the outer periphery of the building basement (generally located at the top elevation of the building cushion); the water collection blind ditch 5 at the bottom of the fertilizer trough is connected to the lower part of the monitoring well 6 and the drainage well 8 respectively, and collects the collected groundwater into the monitoring well and the drainage well; a blind pipe 51 can also be set in the water collection blind ditch 5 at the bottom of the fertilizer trough; the blind pipe 51 is also called a plastic blind pipe or a seepage drainage blind pipe; the blind pipe 51 is a three-dimensional porous material formed by heating and melting a thermoplastic synthetic resin, extruding fiber filaments through a nozzle, and sintering the fiber filaments together, and fusing the joints thereof, and a geotextile is wrapped outside the blind pipe body as a filter membrane;
[0047] The monitoring well 6 is used to monitor the water level of groundwater in the fertilizer tank; the monitoring well 6 is located at the front and rear sides of the building; the left and right sides of the lower part of the monitoring well 6 are provided with openings, and the openings are connected to the blind ditch at the bottom of the fertilizer tank; a water level monitor 7 is installed inside the monitoring well 6; the water level monitor 7 is used to monitor the water level in the monitoring well; a water level line is also provided on the inner wall of the monitoring well 6 to observe the position of the groundwater level;
[0048] The drainage well 8 is used to drain the groundwater in the fertilizer tank; there are several drainage wells 8, which are arranged at the four corners of the fertilizer tank 9 of the building; the bottom of the drainage well 8 is connected to the blind ditch 5 at the bottom of the fertilizer tank; a ladder is provided on the inner wall of the drainage well 8 to facilitate personnel to enter for inspection; a pumping pump 81 is also installed in the drainage well 8; the pumping pump 81 is used to pump out the groundwater in the drainage well 8; a drainage pipe 811 is also connected to the pumping pump 81; the drainage pipe 811 can be connected to the municipal drainage system, and can also be used for sprinkling water to reduce dust, greening irrigation, or rapid drainage;
[0049] If the building is located in a high-slope geographical environment or halfway up a mountain, a siphon-type drainage pipe can be set in the drainage well, and the groundwater level can be controlled according to the height of the elbow;
[0050] The depth of the monitoring well 6 and the drainage well 8 is lower than the bottom of the blind ditch 5 at the bottom of the fertilizer trough; the diameter of the wellhead of the monitoring well 6 is smaller than the diameter of the wellhead of the drainage well 8; the monitoring well 6 and the drainage well 8 are concrete prefabricated components and can be assembled and installed at the construction site.
[0051] The high-level water collection system and the low-level monitoring and drainage system can be selected according to the specific conditions of the building.
Claims
1. A system for automatically monitoring, regulating and utilizing underground water level in a building foundation trench, characterized in that: It consists of a high-level water collection system and a low-level monitoring and drainage system; the high-level water collection system consists of a roof composite micro-slope structure, drainage pipes and water collection wells; the low-level monitoring and drainage system consists of a water interception slope, a water collection blind ditch at the bottom of the fertilizer trough, a monitoring well, a water level monitor and a drainage well.
2. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The composite micro-slope structure of the roof is a structural slope top plate; the structural slope top plate is an open slope roof; the slope of the composite micro-slope structure of the roof is between 1-2‰; a number of mounting frames are also provided at the bottom edge of the slope of the composite micro-slope structure of the roof for installing drainage pipes; the drainage well is provided at the four corners of the basement floor for collecting rainwater into the drainage well.
3. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The water interception slope is a foundation pit slope protection around the fertilizer trough, which is used to intercept groundwater around the building foundation pit.
4. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The water-collecting blind ditch at the bottom of the fertilizer trough is a drainage ditch, which is used to intercept and collect groundwater in the fertilizer trough; the water-collecting blind ditch at the bottom of the fertilizer trough is filled with gravel for filtering water; the water-collecting blind ditch at the bottom of the fertilizer trough is set through the bottom of the fertilizer trough along the outer periphery of the building basement; the water-collecting blind ditch at the bottom of the fertilizer trough is respectively connected to the lower part of the monitoring well and the drainage well, and the collected groundwater is collected into the monitoring well and the drainage well; a blind pipe is also set in the water-collecting blind ditch at the bottom of the fertilizer trough, and the main body of the blind pipe is also wrapped with geotextile.
5. The automatic monitoring, regulating and utilizing system for underground water level in a building foundation trench according to claim 1 is characterized by: The monitoring well is used to monitor the groundwater level in the fertilizer trough; the monitoring well is located on the front and rear sides of the building; openings are provided on the left and right sides of the lower part of the monitoring well, and the openings are connected to the blind ditch at the bottom of the fertilizer trough; a water level monitor is installed inside the monitoring well, and the water level monitor is used to monitor the water level in the monitoring well; a water level line is also provided on the well wall inside the monitoring well to observe the position of the groundwater level.
6. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The drainage well is used to discharge the groundwater in the fertilizer trough; there are several drainage wells, which are arranged at the four corners of the fertilizer trough of the building; the bottom of the drainage well is connected to the water collection blind ditch at the bottom of the fertilizer trough; a ladder is provided on the inner wall of the drainage well; a water pump is also installed in the drainage well to pump out the groundwater in the drainage well; and a drainage pipe is also connected to the water pump.
7. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 6 is characterized by: A siphon type drainage pipe is arranged in the drainage well.
8. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The bottoms of the monitoring well and the drainage well are lower than the bottom of the blind ditch at the bottom of the fertilizer trough.
9. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The diameter of the monitoring well mouth is smaller than the diameter of the drainage well mouth.
10. The automatic monitoring, adjustment and utilization system for underground water level in a building foundation trench according to claim 1 is characterized by: The monitoring well and the drainage well are concrete prefabricated components.
Citation Information
Cited By
Underground space flood regulation and storage structure and flood regulation and storage method
CN120968057A
Underground space flood regulation structure and flood regulation method
CN120968057B
