The invention belongs to the technical field of
computer data processing and
automatic control, and particularly discloses and provides a digital configuration and BIM (
Building Information Modeling) mapping fabricated electromechanical facility linkage method, which comprises the following steps of: analyzing a building
information model and digital configuration, and constructing an initial weighted mapping network; initial virtual pressure of each node is calculated, conduction and superposition of the pressure in the network are iteratively simulated, and a
dynamic pressure distribution diagram representing global risks is generated; and when an anomaly is detected, reverse tracing is carried out along a path with the
maximum pressure contribution degree gradient so as to locate a
risk source. Furthermore, various candidate control strategies are deduced through
simulation, scoring is carried out from multiple dimensions, and the optimal strategy is selected. In addition, by comparing
simulation and actual execution effects, deviation data is utilized to adaptively optimize the weighted mapping network and
simulation model parameters. According to the method, accurate prediction, rapid
traceability,
optimal decision and continuous self-learning of the risk of the complex facility
system are realized, and the intelligence and reliability of operation and maintenance are improved.