Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

550results about How to "Improve Simulation Efficiency" patented technology

Mechanical optimization analysis design system and method for steel-concrete connecting piece of concrete pole

The invention provides a mechanical optimization analysis design system and method for a steel-concrete connecting piece of a concrete pole, and relates to the technical field of concrete optimization design, and the system comprises a multi-scale modeling module, a nonlinear material model module, a self-adaptive grid refining module, a parallel computing module, a dynamic boundary condition module and a user interface module. A multi-scale modeling module is adopted to precisely couple microstructure information into a macroscopic model, so that the precision of the model is remarkably improved, a simulation result is closer to an actual situation, high-precision modeling particularly shows prominent performance in capturing micromechanical properties and overall mechanical behaviors of the steel-concrete connecting piece, and the modeling precision is greatly improved. According to the system, multi-stage iterative optimization of a simulation model is achieved, high precision and high reliability of a simulation result are ensured, in addition, the simulation time is remarkably shortened through a simulation result prediction and optimization method based on deep learning, and meanwhile high prediction precision is kept.
Owner:GUI ZHOU CHANG TONG DIAN LI XIAN LU QI CAI YOU XIAN GONG SI

Simulation method of geological mineral resource reserves

The invention relates to the technical field of mineral resource reserve simulation, in particular to a geological mineral resource reserve simulation method. The method comprises the following steps: carrying out multi-source heterogeneous data acquisition on a target geological area, and carrying out comprehensive feature extraction to obtain a comprehensive data set; constructing an initial static geologic model according to the comprehensive data set to obtain the initial static geologic model; building a multi-physics field coupling model according to the initial static geologic model to obtain a multi-physics field coupling model grid; performing metallogenic fluid migration and enrichment simulation according to the multi-physics field coupling model grid to obtain a metallogenic fluid migration simulation result; carrying out geologic body geometrical morphology updating on the initial static geologic model according to a metallogenic fluid migration simulation result to obtain a dynamic geologic model; and performing reserve prediction model training according to the dynamic geologic model to obtain a reserve prediction model. According to the method, the mineral resource reserves are evaluated more accurately and dynamically through a mineral resource reserve simulation technology.
Owner:XICHANG COLLEGE

Adaptive grid generation method and device based on strain energy density error estimation

The invention relates to the technical field of engineering simulation, and provides a self-adaptive grid generation method and device based on strain energy density error estimation, in the method, error estimation is carried out by utilizing first strain energy density of a model to be analyzed, a first estimation error of the model to be analyzed can be evaluated more accurately, and then grid division is optimized. The to-be-refined region is refined layer by layer, so that the problem of sudden change of the grid can be avoided, the stability and reliability of a simulation result are improved, the region with higher precision requirement in the initial grid can be refined, the unimportant region is kept unchanged, the calculation amount is greatly reduced, and the calculation efficiency is improved while the calculation precision is ensured. The method improves the calculation efficiency, improves the simulation efficiency, reduces the consumption of calculation resources, and achieves the efficient generation and optimization of a target grid.
Owner:QUANZHOU INST OF EQUIP MFG

TCBL wind field high-resolution LES simulation method facing gray area parameterization, medium and program product

The invention discloses a TCBL wind field high-resolution LES simulation method facing gray area parameterization, a medium and a program product. According to the method, a TCBL idealized initial gradient wind field is constructed based on a modified Rankine vortex model, controllability and stability of initial conditions are ensured by specifying key kinetic parameters, and thermodynamic profiles under different wind speed conditions are obtained based on synthetic analysis of tropical cyclone sounding data. And correcting the bottom of the boundary layer by adopting a quadratic and logarithmic function fitting method. Through high-resolution grid configuration and dynamic boundary conditions, secondary grid turbulence is processed in combination with an SGS-TKE closed model, and adaptability of the model to strong rotation and high wind shear environments is optimized by adopting a dynamic correction mechanism. Besides, the stability of thermodynamic variables is maintained through large-scale tendency correction, and high-resolution three-dimensional wind field and turbulence statistical reference data are output and used for verifying and improving a turbulence parameterization scheme of the TCBL under gray region resolution.
Owner:CHINESE ACAD OF METEOROLOGICAL SCI

Porous structure generation method and streamer simulation method thereof

The invention discloses a porous structure generation method and a streamer simulation method thereof, and relates to the technical field of porous structure generation and simulation, and the porous structure generation method comprises the following steps: defining and determining phase parameters of a porous structure; selecting nodes with a preset proportion from all nodes in the set area, setting the nodes as pore seed nodes, and simulating the growth process of pores by using a result of numerical iteration solution processing based on initial values of phase parameters of the set nodes; and constructing a porous structure model. The porous structure streamer simulation method comprises the following steps: removing pores which are not communicated with the surface of a porous structure to obtain a porous solid medium model; setting parameters of gas, and performing transient solution on the discrete electron diffusion model of streamer development; and according to the transient development process of the streamer, analyzing and obtaining the influence of the pore structure on the development characteristics of the streamer. By applying the method provided by the invention, the mesh generation density in porous structure model simulation is reduced, and the efficiency of streamer simulation is improved.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Performance simulation method of power module

The invention relates to the technical field of performance simulation analysis, in particular to a performance simulation method of a power module. The method comprises the following steps: acquiring initial physical characteristic data and initial electrical characteristic data of a power module; the initial physical characteristic data and the initial electrical characteristic data are preprocessed and simulated, and physical field distribution characteristics in the power module are obtained; performing multi-physical field simulation analysis on the power module based on physical field distribution characteristics in the power module by using an adaptive grid generation algorithm and sparse matrix solution to obtain simulation result data; performing parameter adjustment and optimization on a simulation model of the power module according to the simulation result data to generate optimized simulation model parameter data; and according to the optimization simulation model parameter data, performing simplification processing on the design of the power module to establish a simplified model. Through multi-stage simulation and optimization, the performance and the control precision of the power module can be remarkably improved, and the stability and the efficiency of the system are improved.
Owner:SHANWEI HUINENG INTEGRATED ENERGY SERVICE CO LTD +2

Water-power engineering construction simulation method based on BIM (Building Information Modeling) and standard model library construction

The embodiment of the invention provides a hydropower engineering construction simulation method based on BIM and construction of a standard model library, and the method comprises the steps: constructing a construction process model library, a construction resource model library and a construction constraint condition model library in combination with a construction technology of hydropower engineering construction; establishing a hydropower engineering simulation model based on the constructed construction process model library, construction resource model library and construction constraint condition model library, and instantiating the hydropower engineering simulation model according to the BIM model of the hydropower engineering; according to the BIM model and the engineering data, obtaining object parameters, assigning parameter values of the object parameters to attribute parameter values and attribute variable values in the hydropower engineering construction simulation model, and obtaining a hydropower engineering construction simulation model instance; the object parameters comprise geometric parameters, material parameters and construction process parameters. According to the embodiment of the invention, a large amount of code writing cost required by modeling of the simulation object can be saved, and then the efficiency of construction progress modeling can be improved.
Owner:THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1

Optimized molecular dynamics simulation method for monocrystalline silicon cutting process

The invention discloses an optimized molecular dynamics simulation method for a monocrystalline silicon cutting process. Comprising the following steps: initializing and setting parameters, creating a workpiece area, creating an abrasive particle area, creating an atomic box, setting atomic mass, fixing a boundary layer, selecting a potential function, carrying out energy minimization processing and relaxation processing, setting cutting parameters, and carrying out operation simulation and result visualization processing. According to the method, interaction between silicon atoms and interaction between silicon and carbon can be described more accurately by using Tersoft potential; the simulation stability is improved by setting time step length, temperature control and energy minimization; by defining different temperature control layers such as a constant temperature layer and a Newton layer, complex dynamic behaviors in the material cutting process can be better simulated; by optimizing a calculation model and an algorithm, the speed and the precision of atomic motion trail and stress distribution in the process of simulating the cutting of the monocrystalline silicon are remarkably improved, and the stability of the simulation process is ensured.
Owner:KUNMING UNIV OF SCI & TECH

Force-heat coupling simulation and structure optimization method and system for ultra-complex structure

The invention discloses a force-heat coupling simulation and structure optimization method and system for an ultra-complex structure, and the method comprises the steps: generating parameters and data structures required by subsequent simulation and optimization for a given model and a design domain; comprising the following steps: constructing a background coarse grid, constructing a seed point and a radius, modeling a porous structure based on a voronoi structure, and pre-calculating a stress field of the porous structure; calculating a density field, performing thermodynamic simulation on the generated porous structure based on the background coarse grid and the shape function according to the density field, querying a stress matrix corresponding to each seed point according to the obtained stress field, and performing characteristic decomposition and extraction on the stress matrix to obtain a weight matrix corresponding to the seed point; a topological optimization method is used, control parameters are updated through a GCMMA method according to the sensitivity, and therefore the porous structure is updated, material distribution is optimized, and optimization is conducted continuously till the change of the control parameters is smaller than a threshold value. According to the method, the topological optimization problem of the anisotropic porous structure under the multi-physical-field condition can be quickly and effectively solved.
Owner:ZHEJIANG UNIV

Simulation method and simulation device for dynamic response of high-speed train

The invention provides a high-speed train dynamic response simulation method and device, and the method comprises the steps: building a surface element dynamic model of a to-be-tested high-speed train through a potential energy theory based on the boundary dimension parameters and panel parameters of the to-be-tested high-speed train, and building a surface element dynamic model of the to-be-tested high-speed train based on the train body structure parameters and suspension system parameters of the to-be-tested high-speed train; constructing a multi-body dynamic model of the high-speed train to be tested; aiming at the target flow test working condition, performing simulation driving on the high-speed train to be tested through a time domain serial sequence type coupling method so as to perform online coupling on the surface element dynamic model and the multi-body dynamic model, and obtaining dynamic response data of the high-speed train to be tested under the target flow test working condition; and based on the dynamic response data, obtaining a simulation result of the to-be-tested high-speed train under the target flow test working condition through function analysis. Through the method, the problem of waste of simulation calculation resources is solved, and the accuracy and efficiency of dynamic response simulation of the high-speed train are improved.
Owner:CRRC CHANGCHUN RAILWAY VEHICLES CO LTD

Grid model generation method for fluid displacement process of well cementation engineering

The invention relates to the technical field of numerical simulation, in particular to a grid model generation method for the fluid displacement process of well cementation engineering. The method comprises the following steps: acquiring geological data of a well cementation project area, and constructing an initial geological model; well cementation engineering design data are obtained, well cementation engineering topological structure modeling is carried out, and a well cementation engineering topological structure model is obtained; according to the initial geologic model and the well cementation engineering topological structure model, fluid dynamic simulation is carried out, and a fluid characteristic matrix is obtained; performing fluid displacement process simulation according to the fluid characteristic matrix to obtain fluid displacement process data; performing fluid displacement process optimization on the well cementation engineering design data based on the fluid displacement process data to obtain optimized fluid displacement process data, and performing resource allocation redistribution on the well cementation engineering design data according to the optimized fluid displacement process data to obtain optimized well cementation engineering design data. According to the invention, the accuracy of fluid displacement simulation can be improved.
Owner:YANAN GUWEI IND & TRADE CO LTD

Method for predicting crosstalk voltage peak value at far end of disturbed wire during cable crosstalk

The invention discloses a method for predicting a crosstalk voltage peak value at the far end of a disturbed line during cable crosstalk, which belongs to the field of electromagnetic compatibility and comprises the following steps: constructing a field-line coupling electromagnetic crosstalk simulation model by combining an existing transmission line model analysis method; simulating and counting a crosstalk voltage peak value at the far end of the disturbed line, and constructing a data set and carrying out normalization processing; constructing a disturbed line far-end crosstalk voltage peak prediction model, wherein the disturbed line far-end crosstalk voltage peak prediction model adopts an improved double-implicit strata radial basis function neural network; predicting a crosstalk voltage peak value at the far end of a disturbed wire when the cable is subjected to crosstalk; according to the method provided by the invention, the calculation time is saved, and the simulation efficiency is improved; moreover, the method can achieve the prediction of the crosstalk voltage peak value at the far end of the disturbed line under the condition that the related parameters of any cable and the interference source parameters of the interference line are changed, and obtains the coupling magnitude of the voltage on the disturbed cable. And the coupling condition of the crosstalk voltage at the far end of the disturbed wire under the actual cable crosstalk condition can be reflected.
Owner:JILIN UNIVERSITY

Thermal simulation method and system of circuit board and circuit board

The invention relates to the technical field of thermal simulation, in particular to a thermal simulation method and system of a circuit board and the circuit board. The method comprises the following steps: acquiring circuit board design data and modeling to obtain a circuit board three-dimensional structure model; performing precision estimation according to the circuit board design data to obtain circuit board thermal simulation precision data; dividing the circuit board three-dimensional structure model according to the circuit board thermal simulation precision data to obtain circuit board assembly grid data; performing physical attribute assignment on the circuit board assembly grid data according to the circuit board design data to obtain physical grid unit data; performing circuit board thermal simulation according to the physical grid unit data to obtain circuit board thermal simulation data; and visualizing the thermal simulation data of the circuit board to obtain a thermal stress distribution diagram, and performing circuit board assembly design optimization on the three-dimensional structure model of the circuit board according to the thermal stress distribution diagram to obtain an optimized three-dimensional structure model of the circuit board. The heat management capability of the circuit board can be effectively improved.
Owner:SHENZHEN SANDEYING ELECTRONICS CO LTD

Photoresist spin-coating process simulation method and computer equipment

The invention relates to a photoresist spin-coating process simulation method and computer equipment, and the method comprises the steps: building a fan-shaped simulation grid based on the parameter information of a target wafer and the position information of a photoresist injection port; the fan-shaped simulation grid is a fan-shaped space area in the columnar space; the columnar space is a space area defined by space extension by taking the surface of the target wafer as the bottom surface and taking the plane where the photoresist injection port is located as the top surface; establishing a two-phase flow fluid mathematical model; through the target solver, the two-phase fluid mathematical model is iteratively solved according to the boundary condition of the fan-shaped simulation grid, the fluid attribute corresponding to the two-phase fluid and the initial condition of process simulation, and the photoresist spin-coating process simulation result is determined, so that the photoresist spin-coating process simulation efficiency is improved, and the photoresist spin-coating process simulation efficiency is improved. The problems of high cost and time consumption required by a traditional simulation method are avoided, and adjustment and optimization of process parameters are more efficient and flexible.
Owner:ZJU HANGZHOU GLOBAL SCI & TECH INNOVATION CENT

Electromagnetic transient simulation method based on system dynamic characteristic difference decoupling

The invention relates to an electromagnetic transient simulation method based on system dynamic characteristic difference decoupling. An electromagnetic transient decoupling simulation method is constructed from the dynamic characteristics of a power system. The system is divided into two parts according to the time constant difference of each device of the power system, the part with the continuously changing topological structure is regarded as a fast-changing subsystem, and the other part is a slow-changing subsystem. Transfer mapping of a node admittance matrix and an injection current source column vector is carried out on each side of boundary points of the two subsystems, two matrix descriptions of the same system are formed, and therefore decoupling simulation is achieved. The method is a coarse-grained simulation segmentation method with universality, and is characterized in that accurate matrixes for describing a slow-varying subsystem and a quick-varying subsystem can be respectively formed on a simulation level without introducing additional virtual elements and a complex equivalence method, electromagnetic transient decoupling simulation of a power system is realized, the calculation complexity is reduced, and the simulation efficiency is improved. And the simulation efficiency is improved.
Owner:NORTH CHINA ELECTRIC POWER UNIV +1

Drying chamber characteristic and heat pump drying system dynamic modeling method based on Modelica

The invention discloses a drying chamber characteristic and heat pump drying system dynamic modeling method based on Modelica. The method comprises the steps that connectors of different physical domains in a heat pump drying system are designed; splitting the system into component model libraries according to different functions, and performing physical modeling respectively; adding a defined connector in the component model, and constructing a drying loop and a heat pump loop according to a system structure; the unstable drying characteristic of the drying chamber in the drying loop is explored, and a safe operation boundary is provided for the heat pump loop; designing parameters of key components of a heat pump loop and designing a PID controller; and carrying out simulation research to obtain dynamic response of the key parameters. According to the method, a physical model library of each component of the heat pump drying system is established, and a dynamic simulation model of the heat pump drying system is established on the basis; and the unstable drying characteristic of the drying chamber is disclosed, heat pump loop parameter design and PID control design are carried out, and the dynamic response performance of the system under closed-loop response is obtained through a step response experiment.
Owner:LIYANG RES INST OF SOUTHEAST UNIV +1

MP migration path and settling velocity monitoring system and method based on numerical modeling

The invention provides an MP migration path and settling velocity monitoring system and method based on numerical modeling. The system comprises a sensor module, an offshore sampling device, a preprocessing module, a numerical model module, a discretization solving module, a data analysis module and a visualization module. According to the micro-plastic migration path and settling velocity monitoring system provided by the invention, the prediction process of micro-plastic migration and settling velocity is optimized by utilizing a numerical modeling technology, and the simulation accuracy and efficiency of micro-plastic behaviors in a complex marine environment are remarkably improved. The method is especially suitable for effective tracking and quantitative analysis of the microplastics under dynamically changing ocean conditions, and a more efficient data processing platform is created to monitor behaviors of the microplastics, so that environmental protection measures are optimized, and ocean management efficiency is improved.
Owner:HARBIN INST OF TECH +1

High-order random wave representation method and system of non-Gaussian wind field, simulation method and system and storage medium

The invention discloses a high-order random wave representation method for a non-Gaussian wind field, and the method comprises the following steps: S1, deducing a frequency-wave number spectrum of a random wave based on a target power spectrum density and a theoretical coherence function model gamma (xi, omega); s2, defining frequency-wave number three spectrums according to the frequency-wave number spectrums, and obtaining a biased three-coherence function of high-order random waves; s3, calculating a pure frequency-wave number spectrum through a partial three-coherence function; s4, performing Fourier-Stetius integral expansion on the random waves, decomposing an orthogonal increment process, and establishing a new orthogonal increment process according to a pure frequency-wave number spectrum and a pure frequency-wave number three-spectrum; and S5, substituting the established orthogonal increment into the Fourier-Stetius integral expansion of the random wave in the step S4 to obtain the high-order spectrum representation of the non-Gaussian random wave. The invention further discloses a non-Gaussian wind field simulation method and system and a storage medium.
Owner:CHONGQING UNIV

Urban rainfall flood process simulation method combining road equivalent drainage and trunk pipe network

The invention discloses an urban rainfall flood process simulation method combining road equivalent drainage and a trunk pipe network, and the method comprises the steps: obtaining the basic data of a research region, building a two-dimensional hydrodynamic model and a one-dimensional pipe network model based on the obtained data, and carrying out the Thiessen polygon partitioning of the research region, establishing a coupling relationship among the rainwater nodes, the earth surface grids and the Thiessen polygon partitions; calculating the rainfall and infiltration process of the research area to judge whether the rainwater node overflows or not, if overflow occurs, performing overflow calculation, if not, discharging the road rainwater in the Thiessen polygon partition corresponding to the rainwater node into the rainwater node, and performing data updating according to the calculation result until the set operation time is reached, and then performing data updating according to the calculation result. And outputting a rainfall flood simulation result of the research area. According to the method, the flood process calculation of the region lacking the urban fine pipe network data is realized, and the simulation precision and the simulation calculation efficiency of the pipe network drainage process of the region lacking the urban fine pipe network data are improved.
Owner:XIAN UNIV OF TECH

Amorphous carbon film irradiation and simulation mechanical test method based on molecular dynamics

The invention provides an amorphous carbon film irradiation and simulation mechanical testing method based on molecular dynamics, and belongs to the technical field of amorphous carbon film irradiation and simulation mechanical testing, and the method comprises the following steps: constructing a molecular dynamics simulation model of an amorphous carbon film; relaxation is carried out on the obtained model through an NPT system, and it is ensured that the model reaches a stable structural state; performing simulation implementation on the relaxed model under different irradiation doses by using a large-scale parallel simulator LAMMPS to obtain an irradiation simulation result; according to the irradiated model, carrying out constant-force nanoindentation simulation on the amorphous carbon film by utilizing a large-scale parallel simulator LAMMPS for the second time to obtain a nanoindentation simulation result; and respectively carrying out visualization and structural defect analysis on the irradiation simulation result and the nanoindentation simulation result through OVITO, and evaluating the influence of different irradiation doses on the structure and mechanical properties of the amorphous carbon film. The invention provides an effective technical means for researching the behavior of the amorphous carbon film under the irradiation condition.
Owner:RES & DEV INST OF NORTHWESTERN POLYTECHNICAL UNIV IN SHENZHEN

Insulating pull rod lightweight design method based on multi-objective optimization algorithm

The invention discloses an insulating pull rod lightweight design method based on a multi-objective optimization algorithm, and aims to solve the problems of heavy weight and heavy workload of a bearing tool in hot-line work of an ultra-high voltage transmission line. The method comprises the following steps: setting electrical and mechanical property parameters of the insulating pull rod; then, a three-dimensional model is built through SolidWorks, and finite element analysis is carried out through COMSOL; then, an optimized data set is obtained through joint simulation of MATLAB, COMSOL and SolidWorks; secondly, establishing a mathematical optimization model, solving by adopting a particle swarm-grey wolf optimization algorithm, and improving the algorithm through Sine-Tent-Cosine chaotic mapping population initialization and a crisscross strategy; and finally performing simulation verification on the optimization scheme. The device is applied to the lightweight design of large-load insulating force-bearing tools, effectively shortens the development period of the tools, saves the production cost, improves the safety coefficient of hot-line work, and remarkably reduces the workload of hot-line workers.
Owner:CHINA THREE GORGES UNIV

Control method, system, medium and equipment based on web simulation storage three-dimensional warehouse

The invention discloses a control method, system, medium and equipment based on a web simulation storage three-dimensional warehouse, and relates to the technical field of computers. The method comprises the steps that the construction requirement of a user for a storage stereoscopic warehouse is acquired, a target stereoscopic warehouse model is constructed on a preset model object based on the construction requirement, and the target stereoscopic warehouse model comprises a plurality of warehouse locations; when task scheduling signals are received, a target scheduling task is created based on the task scheduling signals, and the task scheduling signals comprise warehouse-out scheduling signals and warehouse-in scheduling signals; and controlling a carrying device to execute a warehouse-out task or a warehouse-in task at the corresponding storage location based on the target scheduling task. By implementing the technical scheme provided by the invention, the simulation efficiency of the three-dimensional warehouse can be improved.
Owner:SHANGHAI MINGCAI DIGITAL TECH CO LTD

Fatigue time-varying reliability calculation method and device, equipment, storage medium and product

The invention relates to the technical field of fatigue time-varying reliability analysis, in particular to a fatigue time-varying reliability calculation method and device, equipment, a storage medium and a product. The method comprises the following steps: performing crack propagation simulation on a three-dimensional plate shell structure based on a random propagation finite element method, and establishing a geometric model of a crack propagation path; based on the geometric model, calculating a stress intensity factor of the crack tip by adopting an interaction integral method, and determining change data of the stress intensity factor in the crack propagation process; based on the stress intensity factor of the crack tip and the change data of the stress intensity factor in the crack propagation process, performing numerical simulation on the crack propagation process by adopting an propagation finite element method; and based on a numerical simulation result, optimizing the crack propagation process by adopting an HLRF-BFGS optimization algorithm, and determining the reliability of fatigue crack propagation. According to the method, the fatigue reliability evaluation effect is improved.
Owner:UNIV OF SCI & TECH BEIJING

Electrode stimulation electric field simulation method and device, electronic equipment and storage medium

The embodiment of the invention discloses an electrode stimulation electric field simulation method and device, electronic equipment and a storage medium, and relates to the technical field of information, and the method comprises the steps: obtaining a brain image of a target user implanted with a stimulation electrode and an electrode implantation position of the stimulation electrode; performing brain tissue category division on the brain image to determine a first brain point cloud corresponding to the target user based on a brain tissue category division result; determining brain electrical characteristic distribution information corresponding to the target user based on a plurality of first data points in the first brain point cloud and the corresponding brain tissue electrical characteristic parameters; when the stimulation parameter is applied to the target contact of the stimulation electrode, the brain stimulation electric field distribution information corresponding to the stimulation parameter is determined based on the electrode implantation position, the brain electrical characteristic distribution information and the stimulation parameter, so that the reliability and the accuracy of the electrode stimulation electric field distribution information are improved; and the simulation efficiency and the real-time performance of the electric field distribution around the stimulating electrode are improved.
Owner:SCENERAY

Design optimization method for oscillating water column wave energy device

The invention discloses a design optimization method for an oscillating water column wave energy device, and belongs to the technical field of ocean wave energy utilization, and the method comprises the following specific steps: S1, determining modeling parameters of a to-be-optimized device, and carrying out the parametric modeling of the wave energy device, so as to obtain the parametric modeling of the wave energy device; s2, selecting an air chamber width in the modeling parameters as a target optimization parameter, and setting other modeling parameters as constants, S3, inputting parameterized modeling in fluid mechanics software, calculating an air pressure value P1 (t) and a gas flow velocity value V (t) of the corresponding wave energy device, and forming a discrete point group; s4, fitting the discrete point group, and constructing an agent model; and S5, carrying out final optimization design by using the proxy model. By adopting the method, a multi-parameter and multi-target optimization scene can be met, and a new method is provided for design optimization of a wave energy device.
Owner:SOUTH CHINA UNIV OF TECH

Simulation method and device, computer equipment and storage medium

The invention relates to a simulation method and device, computer equipment and a storage medium. The method comprises the following steps: constructing a plurality of sub-modules of a target simulation model; determining a target sub-module in the plurality of sub-modules, packaging the target sub-module into a simulink model, and packaging the sub-modules, except the target sub-module, in the plurality of sub-modules into an FMU model; obtaining data interaction parameters between the simulink model and the plurality of FMU models; and running the target simulation model according to the data interaction parameters. According to the method, the time consumption of local adjustment of the target simulation model is reduced, so that local adjustment of the target simulation model can be facilitated, and the simulation efficiency is improved.
Owner:CHANGSHA KELIANG TECH CO LTD

Simulation resource scheduling method and device, computer equipment and storage medium

The invention relates to the technical field of computers, and discloses a simulation resource scheduling method and device, computer equipment and a storage medium, and the simulation resource scheduling method comprises the steps: obtaining a to-be-simulated task corresponding to a target chip, and distributing the to-be-simulated task to a corresponding task queue according to the priority of the to-be-simulated task; determining the to-be-simulated task meeting the priority condition in the task queue as a target simulation task; a target node meeting the execution condition is determined in the node cluster, the target simulation task is distributed to the target node, the target simulation task is executed based on the target node, and the running state of the target node is an idle state or an occupied state. According to the method, the execution efficiency of the simulation task can be improved through deployment and scheduling of the node cluster, the manual dependency degree is reduced, and then the chip design simulation efficiency is improved.
Owner:SHANDONG YUNHAI GUOCHUANG CLOUD COMPUTING EQUIP IND INNOVATION CENT CO LTD