The invention discloses a fracturing sand adding design method based on a large parallel plate proppant migration laying object model experiment, and particularly relates to the field of oil and gas field development. The method comprises the steps that the value range of each construction parameter is determined according to a fracturing target, a large parallel plate proppant migration laying object model experiment device is used for conducting a contrast experiment on each construction parameter, the migration condition of a proppant under different parameters and a final sand dike form picture are obtained, sand dike form evaluation parameters are used for conducting quantitative evaluation on the final sand dike form, the construction parameters are optimized, the horizontal migration speed and the vertical sedimentation speed of the proppant are measured under different conditions, the supporting height and the horizontal supporting crack length are calculated, sand adding parameters of all stages of fracturing are determined after checking, and the final fracturing sand adding construction scheme is determined by combining the proportion of the proppant and fracturing fluidin all the stages. According to the fracturing sand adding design method based on the large parallel plate proppant migration laying object model experiment, the problem that the quantitative evaluation parameters of an experiment result are few and incomplete is solved, the fracturing yield increasing effect is greatly improved, and the fracturing construction cost is effectively reduced.