Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

116 results about "System building" patented technology

Systems Building is a multi-disciplinary company established in Mauritius since 1974, specialised in design, installation and maintenance of electrical and mechanical engineering services for the building industry.

Water resource management system based on terrestrial ecosystem protection

The invention discloses a water resource management system based on terrestrial ecosystem protection, and relates to the technical field of water resource management. The water resource management platform is in communication connection with a data collection and processing module, an index system construction module, a space coordinate system unification module, a unit analysis module, an ecological hydrological evaluation module and a management module, and all the modules are in electric signal connection. According to the method, hydrological characteristics and ecological requirements of different regions are identified more accurately by dividing ecological hydrological regions, comprehensive evaluation is performed on landform, ecological factors, climate hydrology and human activity data in a drainage basin by using a G-IS and a spatial analysis tool, ecological hydrological indexes are calculated, and the evaluation accuracy is improved. Therefore, targeted water resource management measures are formulated for each subarea, optimization of water resource allocation, improvement of water utilization efficiency, reduction of waste and guarantee of reasonable distribution and utilization of water resources are facilitated.
Owner:SOUTHWEAT UNIV OF SCI & TECH

Heavy-load train control safety evaluation method and system and electronic equipment

The invention relates to the field of heavy-load train safety, and discloses a heavy-load train control safety evaluation method and system and electronic equipment. The method comprises the following steps: collecting monitoring data of the heavy-load train, wherein the monitoring data comprises slow change data and time sequence data; performing flexible section division on the operation line based on line features, and performing feature extraction on data acquired by each flexible section unit to obtain a total feature set corresponding to each unit; constructing a feature relationship multi-graph for representing the relationship between the features based on the correlation analysis result of the total feature set; analyzing the feature relationship multi-graph to obtain an optimal feature set of each flexible section unit; and on the basis of the optimal feature set of each flexible section unit, abnormal monitoring is performed on the operation state through a preset context sensing model, and operation safety is evaluated according to a monitoring result. The system construction and maintenance cost is reduced, analysts can be supported to carry out deeper insight, and the intelligent degree of multi-dimensional monitoring data analysis is improved.
Owner:SHENHUA RAIL & FREIGHT WAGONS TRANSPORT +1

Geometric pose and optical axis error synchronous calibration method of reflective phase deflection system

The invention belongs to the field of optical detection, and particularly relates to a synchronous calibration method for a geometric pose and an optical axis error of a reflective phase deflection system, which comprises the following steps of: taking a plane mirror pose as a reference, establishing redundant geometric constraints under a plurality of poses through mirror image reflection, and jointly solving geometric external parameters of the system; and meanwhile, a reverse ray tracing model and a normal integral model are synchronously constructed in a calibration stage, surface shape data are actually measured by combining an interferometer, a system optical axis error field is explicitly stripped, and decoupling separation of a system structure error and a surface shape error is realized. According to the method, the system building process is greatly simplified, the dependence of a high-precision mechanical auxiliary device is avoided, and the overall detection precision and the low-frequency error control capability of the reflective phase deflection system are effectively improved by synchronously modeling and compensating the optical axis error of the system in the calibration stage; and a technical basis with engineering adaptability is provided for high-precision free-form surface optical detection.
Owner:CHANGCHUN INST OF OPTICS FINE MECHANICS & PHYSICS CHINESE ACAD OF SCI

Power system knowledge asset management method and system based on knowledge graph

The invention provides an electric power system knowledge asset management method and system based on a knowledge graph, and relates to the technical field of electric power systems, and the method comprises the following steps: S1, knowledge asset investigation and classification; s2, constructing a multi-level label system; s3, constructing and optimizing a knowledge base; s4, developing a technical map management interface; s5, carrying out deep technical map analysis; s6, implementing a knowledge asset management process; s7, precisely matching and applying ecological construction; the system comprises a knowledge carding and classification module, a label system construction module, a knowledge base construction and optimization module, a technical atlas management module, a technical atlas analysis module, a knowledge asset management process control module and a precise matching application module. According to the method, multiple fields of electric power engineering, information technology, knowledge asset management, computer science and the like are spanned, comprehensive consideration of novel electric power system technology innovation network ecology is embodied, and especially deep integration in the aspect of knowledge asset management strategies is embodied.
Owner:INFORMATION & COMMUNICATION BRANCH STATE GRID JIBEI ELECTRIC POWER CO LTD +1

Distributed photovoltaic and energy storage planning method coupled with long-term and short-term uncertainty

The invention discloses a distributed photovoltaic and energy storage planning method coupling long-short term uncertainty, and the method comprises the steps: building a parameter incomplete probability distribution set through a distribution robust optimization algorithm, and depicting the long-term load uncertainty affected by economic and market rules; through an adaptive clustering algorithm, a load and photovoltaic short-term scene is generated, and short-term uncertainty is described. On the basis, an IGDT-based two-stage collaborative planning model is provided to evaluate the economic and environmental benefits of the planning scheme. In the first stage, the planning model optimizes the site selection and capacity of distributed photovoltaic and energy storage by coupling the uncertainty of long-term and short-term, and aims to reduce the system construction and operation cost to the greatest extent. In the second stage, the model adopts the IGDT to optimize the short-term uncertain radius of the photovoltaic and load, and the effectiveness of scene selection is improved. Meanwhile, a comprehensive evaluation index is designed, and an optimal scheme is selected in the second stage, so that the economical efficiency and robustness of the scheme are balanced.
Owner:ZHEJIANG UNIV

Block alignment multi-target trajectory optimization method based on IWOA

The invention provides a block alignment multi-target trajectory optimization method based on IWOA. The block alignment multi-target trajectory optimization method comprises the steps of 1, determining a ship block trajectory planning mode; 2, dynamic track parameters which need to be followed by the attitude adjusting trolley in different directions are obtained; 3, multi-target trajectory optimization of the block and the attitude adjusting trolley is achieved; 4, planning the attitude adjustment of the block, solving the optimal time within the constraint range, and solving the motion trail of the attitude adjustment trolley; 5, establishing a posture adjusting trolley block alignment model; and step 6, verifying the feasibility of block trajectory multi-objective optimization and the accuracy of block alignment trajectory planning. The method has the beneficial effects that efficient and accurate automatic alignment of the ship block is realized through automatic alignment system building, high-precision measurement system building, coordinate transformation model building, point set matching algorithm building, intelligent optimization algorithm building, trajectory planning algorithm building and ship block automatic alignment trajectory planning system building.
Owner:JIANGSU UNIV OF SCI & TECH

Method, device and equipment for building desktop-level hardware-in-the-loop test system

The invention provides a desktop-level hardware-in-the-loop test system building method, device and equipment, and relates to the technical field of hardware-in-the-loop simulation, and the method comprises the steps: configuring a vehicle network simulation and vehicle dynamics model in an upper computer with a CAN development environment and vehicle dynamics simulation software, a real-time data channel between the two is established through a full duplex transmission protocol; a driver instruction is generated through the driving control panel, and a vehicle state signal is generated through vehicle dynamics software; the wheel speed in the vehicle state signal is converted into a physical excitation signal, and a wheel cylinder pressure signal returned by the controller is collected; the pressure signal is fed back to the vehicle dynamics model to form a closed loop, a test scene is executed, and the desktop-level hardware-in-loop test of the brake controller is completed. By using vehicle dynamics simulation software, the test confidence coefficient is improved; data exchange is carried out by utilizing an FDX protocol of a CAN development environment, and complexity and potential risks of self-development of a communication interface are avoided.
Owner:BEBEST (SHANGHAI) AUTOMOTIVE ELECTRONICS CO LTD

Electronic component supply chain supply and demand management method

The invention relates to the technical field of supply chain management, in particular to an electronic component supply chain supply and demand management method, which comprises the following steps: S1, abstractly tagging acquired electronic data; s2, selecting an LLM model, inputting the abstract tagging data in the S1 into the LLM model, analyzing the input data text by the LLM model, and outputting the result, the output result including further explanation of the supply and demand condition and prediction of the future supply and demand trend; s3, performing fine tuning on the LLM model by using a fine tuning module; s4, after system building is completed, vectorization representation is carried out on the labeled supply and demand data and the material data stored in the system, and rapid matching and query are carried out through a vector search technology; data at the supply end and the demand end are regularized through abstract labels, the consistency and efficiency of data processing are remarkably improved, and discrete and complex original data are converted into a unified label format by adopting an abstract label regularization technology.
Owner:SHANGTONG ELECTRONICS (NANJING) CO LTD

Business system building method and system

The invention discloses a business system building method and system, and relates to the field of business process management, and the method comprises the steps: recognizing related entities such as roles, demands, strategic targets and the like through a bidirectional undifferentiated coding model, carrying out semantic coding and element classification through an attention polarity model, and generating a benefit related party graph in combination with a rule engine; calculating a demand weight by means of a graph neural network, embedding a semantic vector to generate a weighted strategic vector, constraining an AI model to extract flow nodes, and correlating to generate a flow element table; a final-stage flow chart is generated through state coding and a near-end strategy optimization learning network, a programming environment is determined based on requirements, a code segment is matched to generate a service system, full-process automation from strategic analysis to service system generation is achieved, the development efficiency of the service system is improved, and the technical threshold is reduced.
Owner:BEIJING HUILING TECH CO LTD

Internet of Things intelligent transmission and distribution system and method combined with 4GLORA wireless technology

The invention belongs to the technical field of smart home and energy transmission and distribution, and particularly relates to a 4Gamp-combined system. The invention discloses an Internet of Things intelligent transmission and distribution method based on LORA wireless technology, and the method comprises the following specific steps: a data collection and uploading stage: obtaining parameter information, uploading the data to a transmission and distribution central centralized control center through an LORA module, and uploading key data to a cloud platform through a 4G module; performing data processing and analysis, comparing the collected data with a preset target value, calculating parameters to be adjusted, and performing synchronous analysis and early warning; in the control execution stage, an adjusting instruction is sent to each branch control valve and a water mixing device through an LORA module, the cold and hot water mixing proportion is adjusted so as to control the water supply temperature, and the control valves adjust the water flow of each room according to requirements; remote monitoring and feedback optimization are carried out; and intelligent learning and optimization. Accurate distribution, intelligent control and remote management of household energy are achieved, the household energy utilization efficiency is improved, energy consumption is reduced, the living comfort is improved, and meanwhile the system construction and operation cost is reduced.
Owner:ZHEJIANG DAUTEHE SMART HOME SYSTEM CO LTD

Spaceflight thermal control coating film magnetron sputtering coating manufacturing digital twin system building method

The invention discloses a method for constructing a digital twin system for manufacturing a spaceflight thermal control coating film through magnetron sputtering coating. The method comprises the following steps of: firstly, constructing a machine tool three-dimensional model by utilizing Unity 3D and a three-dimensional reconstruction technology; a digital twinborn model is adopted to carry out mapping simulation on equipment operation actions and operation data acquired in real time, and visualization of the manufacturing process is achieved; according to the production requirements of magnetron sputtering coating equipment, an instruction prediction model is established for a specified coating product or process through a digital twin system, and online quality prediction of a real-time production process is realized; by establishing a channel-space attention mechanism, a mapping relation between coating defect strong correlation characteristics and defect categories is established, and magnetron sputtering coating system state early warning based on fusion of multi-source acquisition information is realized.
Owner:HARBIN UNIV OF SCI & TECH

Laser measurement system building method for ultra-large aviation process equipment

The invention discloses a laser measurement system building method for ultra-large aviation process equipment, which comprises the following steps of: designing a measurement field, setting a system building point position of the measurement field, and determining a measurement station of a laser tracker; measuring and recording temperature data of each building point in the measurement field; measuring the space coordinates of all the system building points in the measuring field; performing iteration judgment of out-of-tolerance data on the space coordinates of the building points at the measurement stations of the laser tracker so as to eliminate the building points with out-of-tolerance space coordinates; performing spatial networking on all the system building points in the measurement field, and determining the relative spatial relationship of all the system building points; and establishing a coordinate system based on the relative spatial relationship of all the system establishment points in the measurement field. According to the technical scheme provided by the invention, the problem that in a reference point measurement mode of ultra-large aviation process equipment, due to measurement errors and temperature factors of measurement equipment, the precision of a measurement field formed by station transfer matching of measured data and theoretical data of the reference point is reduced, and the assembly measurement requirement cannot be met is solved.
Owner:AVIC XIAN AIRCRAFT IND GRP CO LTD

Stable hydrogen production device and method for solid oxide electrolytic tank under fluctuating power supply

The invention relates to a stable hydrogen production device and method for a solid oxide electrolytic cell under a fluctuating power supply, and the device comprises the fluctuating power supply, a first electric pile, a thermochemical module and a second electric pile, a fuel electrode gas inlet of the first electric pile is connected with a first gas output end, and a power supply end of the first electric pile is connected with the fluctuating power supply; a fuel electrode outlet of the first electric pile is connected with an inlet of the thermochemical module, and the first electric pile generates a first gas product based on first output gas of a first gas output end when the current input voltage is greater than a first preset voltage; and the thermochemical module performs hydrogen absorption and heat absorption reaction based on the first gas product to obtain a second gas product. And the second electric pile generates hydrogen meeting the preset concentration through electrolysis based on the second output gas of the second gas output end and the second gas product. Therefore, the problem that thermal management and gas component balance management of the system are insufficient under the fluctuating power supply condition is solved, the operation efficiency of the system is improved, and the complexity of system building is reduced.
Owner:TSINGHUA UNIVERSITY +1

Industrial special system building method based on collaborative optimization of large model and intelligent agent

The invention discloses an industrial special system building method based on large model and agent collaborative optimization, which comprises two core steps of industrial large model generation and agent collaborative optimization. The method specifically comprises the following steps: S1, generation of an industry large model: completing construction of an industry adaptation model through a data set generation module, a model fine tuning module, a model format conversion and quantification module and a model reconstruction and loading module in sequence; and S11, the data set generation module adopts an open source general large model as an initial semantic generation engine, and the method constructs a full-link system covering automatic generation of a data set, efficient fine tuning of parameters, model format conversion and quantization, model reconstruction and rapid loading, and agent construction and collaborative optimization control. And rapid injection of industry knowledge and efficient migration of model capability are realized.
Owner:SHANGHAI INTELLIGENT & CONNECTED VEHICLE R & D CENTER CO LTD

A studio lighting system

The utility model relates to the technical field of light equipment, and disclose a studio light system, including roof, still include: the limiting frame is fixedly installed on the roof, and the limiting frame is rotatably connected with the guide ring, and the roof is equipped with the drive part for controlling the rotation of guide ring, the utility model discloses the integrated design is adopted, and the panel soft light and spotlight are accurately installed on the roof, and successfully build up a set of efficient convenient light building framework, and this framework breaks the cumbersome mode of traditional light system building, realizes the quick assembly of light system, and, utilize drive part to make six panel soft light have the trend of simultaneously inwards contraction or outward expansion to the rotation adjustment of guide ring, thereby convenient operator adjusts the illumination brightness and range of light according to the environment, and this kind of flexible adjustment mode can accurately satisfy the light demand under different scenes, further enhance the display effect, bring more high -quality visual experience for audience.
Owner:QINGDAO RULEI ENG CO LTD

A method for simultaneously carrying out data management in a system when building a new business information system

This invention relates to the technical fields of data quality, data management, and data governance. Specifically, it relates to a method for simultaneously conducting data governance within a newly built business information system. This method establishes a general data management standard covering data specifications, database specifications, and process specifications; builds a supervisory standard that runs through the entire process of project requirements analysis, design, development, deployment, and operation and maintenance; and integrates these two types of standards into the technical requirements of the newly built business system project. Data governance is implemented step-by-step at each stage of the project, thus avoiding data quality problems from the source of business system construction. This avoids the additional costs and schedule risks of traditional post-event governance, ensures that the system data format is uniform, secure, and compliant, and can seamlessly integrate with the enterprise's existing data governance system, solving the problems of data silos, redundancy, and inconsistency in multi-system parallel scenarios.
Owner:CHONGQING TSINGSHAN IND

Satellite combination structure and satellite launching control method

The invention relates to the technical field of spaceflight, and particularly discloses a satellite combination structure and a satellite launching control method. The satellite combination structure comprises a first satellite and at least two second satellites; the second satellites are arranged on the same side of the first satellite side by side, the second satellites are connected with the first satellite through separation mechanisms, and every two adjacent second satellites are connected through a separation mechanism; the first satellite comprises a propelling system and a first force bearing structure, the propelling system comprises a main propeller and a fuel tank, the fuel tank is located in the first force bearing structure, and the main propeller is connected to the outer side of the bottom of the first force bearing structure. Therefore, complex structures such as an upper stage or a propulsion power cabin do not need to be additionally arranged, under the condition that the satellite function and the on-orbit deployment condition are guaranteed, the carrying capacity is effectively saved, new space junk is avoided, meanwhile, the satellite launching cost is saved, and the system construction cost is reduced.
Owner:SHIFANG SATLINK (SUZHOU) AEROSPACE TECH CO LTD +1

Fabricated steel truss-concrete composite floor system and assembling method thereof

The invention provides an assembly type steel truss-concrete composite floor system and an assembly method thereof, and relates to the technical field of floor system buildings. The structure comprises at least one combination box, the combination box comprises a box beam, at least one upper floor slab and at least one lower floor slab, the box beam is arranged on the bearing column, an upper containing groove is formed in the top of the box beam, a lower containing groove is formed in the bottom of the box beam, and the upper floor slab and the lower floor slab are arranged in the upper containing groove. The upper floor slab is arranged in the upper containing groove and connected with the box beam, and the lower floor slab is arranged in the lower containing groove and connected with the box beam. The lower bottom surface of the floor system does not need to be leveled by workers through operations such as ceiling mounting in the later period, and the effect of low construction burden is achieved.
Owner:JIANGSU ZHONGCHENG DESIGN INST CO LTD

A clustered layout structure of buildings and structures in a circulating water supply system

The present invention relates to the technical field of generator set equipment, and discloses a clustered arrangement structure of circulating water supply system buildings, including a cooling water circulation building group, the cooling water circulation building group includes a cooling tower, a water collection tank, a return ditch, a water absorption well and a circulating water pump room, a plurality of cooling towers are provided, and a plurality of cooling towers are connected in a straight line to form a cooling tower row, the cooling tower row is arranged on the water collection tank, and air inlets are provided on both sides of the cooling tower that are relatively distributed along the width direction of the cooling tower row, the water collection tank, the return ditch and the water absorption well are connected in sequence and the water flow direction remains unchanged, the circulating water pump room is located on one side of the length direction of the cooling tower row, the return ditch and the water absorption well are arranged in sequence between the cooling tower row and the circulating water pump room, a circulating water pump is provided in the circulating water pump room, and the water absorption port of the circulating water pump is connected to the water absorption well. The present invention has a reasonable layout, effectively reduces the occupied area without affecting the air intake cooling effect of the cooling tower, saves engineering investment, and maintains the stability of the water flow state in the system.
Owner:CHINA ENERGY ENG GRP GUANGDONG ELECTRIC POWER DESIGN INST CO LTD

Equipment part replacement whole-process management and control system and method

The invention discloses a full-process management and control system and method for replacement of equipment spare and accessory parts, and belongs to the technical field of equipment full life cycle management, and the system comprises a system construction module which constructs a modular management and control system based on material picking application data of an enterprise resource planning system; the operation process specification module is used for formulating and integrating operation process specifications so as to guide part replacement and recording part destination information of maintenance records; the spare and accessory part evaluation and processing module is used for performing function evaluation on the replaced spare and accessory parts and performing classification processing on the spare and accessory parts according to an evaluation result to obtain an evaluation record; and the information recording and checking module is used for regularly checking the spare and accessory parts according to the spare and accessory part destination information and the review record in the maintenance record. According to the invention, the problems of difficult supervision, incomplete recording, nonstandard operation of maintenance personnel and the like in the replacement process of equipment parts in the cigarette factory can be solved.
Owner:HONGYUN HONGHE TOBACCO (GRP) CO LTD

Method and device for building operating system, operating system, equipment and medium

The application discloses a system building method, a system building device, an operating system, equipment and a medium. The system building method comprises the following steps: obtaining a configuration file of an operating system to be built, and determining at least two function units to be implemented by the operating system to be built according to the configuration file; obtaining an OS element capability corresponding to each function unit in the at least two function units, and assembling all the obtained OS element capabilities to obtain the operating system to be built. According to the embodiment of the application, the operating system is decoupled from hardware, the operating system is built in the mode of assembling OS element capabilities, the operating system can be spliced, the existing OS element capabilities can be reused, the operating system can be built on demand, and therefore, the development of operating systems of various hardware devices can be completed conveniently, quickly and at low cost, and the development difficulty and cost of the operating system are greatly reduced.
Owner:深圳开鸿数字产业发展有限公司

Calibration test method and system for ultra-low frequency magnetic field immunity

The invention discloses a multi-frequency point calibration test method and system for 0-10 Hz ultralow frequency magnetic field immunity. The method comprises the steps of system building, single frequency point reference calibration, test execution and exception handling. When the system is built, the hardware modules are connected according to a specific mode; in the calibration stage, references are established for frequency points of 2Hz, 4Hz, 6Hz and 8Hz; during testing, precise field intensity control and data recording are realized through combination of coarse adjustment and fine adjustment; and verifying the probe position when abnormity occurs. The system comprises an arbitrary function generator, a power amplifier, a radiation ring and a gauss meter, and parameters of each module are adaptive to a frequency band of 0-10Hz. The field intensity larger than or equal to 1000 A / m can be stably generated, the testing precision is improved, the 0-10 Hz frequency band standard testing blank is filled, and the device is suitable for electronic equipment testing in the fields of industrial automation, new energy automobiles and the like.
Owner:CATARC AUTOMOTIVE TEST CENTER (WUHAN) CO LTD

Systems and methods building tiered request-response communications using probability-based selections

Methods and systems building tiered request-response communications using probability-based selections. For example, the methods and systems may use machine learning and / or artificial intelligence to generate a tier of a tiered request-response communications with a subset of user input fields and / or tiers, in which the subset is dispositive for completing the tiered request-response communication.
Owner:CAPITAL ONE SERVICES LLC

A high-precision coordinate boring machine tool wear intelligent prediction method

The application discloses a high-precision coordinate boring machine tool wear intelligent prediction method, and relates to the technical field of cutting tools, which comprises the following steps: step one, equipment building: determining sensor arrangement and communication scheme, and completing data acquisition system building according to the same; step two, testing: performing milling processing experiment, collecting machine tool vibration signals, measuring tool flank wear width and workpiece surface roughness, and establishing a tool wear prediction model according to the same; and step three, using: inputting the collected machine tool vibration signals in the processing process into the model, so that the current tool wear degree can be judged according to the actual vibration signals, and whether the tool needs to be replaced in time can be judged. The application identifies the vibration signal characteristics of the high-precision coordinate boring machine, can effectively improve the prediction accuracy, judges whether the tool wear degree prediction value meets the requirements, and thus prompts the engineers to replace the tool, so that the processing requirements are met.
Owner:SHANGHAI JIAOTONG UNIV

Data conversion device for linking heterogeneous models, and program

To provide a data conversion device for linking heterogeneous models capable of quickly and automatically creating data for a structural calculation model based on a BIM design model, and a program.SOLUTION: A data conversion device 10 for linking heterogeneous models converts first data relating to a BIM design model 50 of a building included in a system building into second data relating to a structural calculation model 80, and has an acquisition unit 21 that acquires the first data, a conversion unit 22 that converts the first data into the second data, and a memory unit 25 that stores the created second data, where the first data includes provisional structural member data for each object that constitutes the BIM design model 50.SELECTED DRAWING: Figure 2
Owner:DAIWA HOUSE INDUSTRY CO LTD

A smart meter acquisition terminal load optimization configuration method and system

The application discloses a kind of intelligent electric meter acquisition terminal load optimization configuration method, comprising the following steps: S1, the basic data of target area intelligent electric meter acquisition system, operating data and the cost parameters of each type acquisition terminal are obtained;Based on the basic data and operating data, the relationship model of acquisition success rate and acquisition terminal load quantity is established;Based on the cost parameters, total cost model is established;S2, with the total cost of all acquisition terminals in the target area as objective function, with the load configuration scheme of each acquisition terminal as decision variable, with the overall average acquisition success rate of the target area not less than the preset target value as constraint condition, optimization problem is constructed;S3, the optimization problem is solved using mathematical optimization solver, and the optimal load configuration scheme of each acquisition terminal is generated.The present application realizes scientific balance and global optimal configuration between system construction operation cost and data acquisition reliability.
Owner:STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO

Electric control system environment monitoring system and method based on electric arc furnace steelmaking of iron and steel enterprise

The invention discloses an electric control system environment monitoring system and method based on electric arc furnace steelmaking of an iron and steel enterprise. Comprising the following steps: building professional fire compartments according to an electric arc furnace system, respectively arranging temperature-sensing and smoke-sensing fire detectors in each fire compartment, carrying out fire monitoring on each fire compartment through the detectors, and immediately sending a signal to a fire detection alarm and linkage system once a fire in a certain fire compartment is found; a linkage signal is output through the linkage module, all ventilation fans and working lighting are stopped, an evacuation emergency lighting system is started, and an automatic fire extinguishing system is started to extinguish fire. The electric arc furnace environment detection system and the electric control system are integrated, the system coordination performance is good, and remote centralized control over electrical equipment used for adjusting the environment in the electric arc furnace area is achieved.
Owner:HUATIAN NANJING ENG & TECH CORP MCC +1

Full-dimensional digital performance visual preview system

The invention relates to the multi-element field of performance art, in particular to a full-dimensional digital performance visual preview system. Comprising rehearsal design software Depence, a conceptual design module, a complete system building module, a DMX / RDM control module, an equipment debugging and programming module, a construction drawing making module, an Exce l export and document module, a DMX-I n control input module, a 3D visualization module, a full visual element real-time simulation rehearsal module, a simulation animation effect picture module and a real-time performance simulation module. And a 4k high-definition animation effect module is provided. According to the method, the efficiency of performance visual design is improved, so that the labor cost and trial-and-error cost are reduced; collaboration among design departments is enhanced, and perfect presentation of a visual effect is ensured; the requirements on rehearsal talents and computer equipment hardware are reduced, and the application range of the system is expanded; visual elements and entity equipment are comprehensively integrated, and the artistic effect is improved; a plurality of preview display modes are provided, and the user experience is enhanced.
Owner:BEIJING DASHENG TIANYI CULTURE COMMUNICATION CO LTD

A distributed emergency communication guarantee system building method

The application relates to a distributed emergency communication guarantee system and a building method, which are used for emergency communication guarantee between two communication towers, and comprise a plurality of chassis vehicles, each of which is provided with a plurality of tracked vehicles; the front end of the chassis vehicle is provided with a cab, and the rear end of the chassis vehicle is provided with a compartment; the chassis vehicle is provided with a lifting support rod, which can form a fiber support seat together with the chassis vehicle after being lifted; each tracked vehicle is provided with a telescopic lifting rod, which can form a fiber support seat together with the tracked vehicle after being lifted when the tracked vehicle drives out of the compartment; at least one of the chassis vehicles is provided with a drone; after a plurality of the fiber support seats are arranged between two communication towers, the drone is used for pulling out the fiber on a wire coil, so that the fiber is erected between the two communication towers.
Owner:LONGYAN HAIDEXIN AUTOMOBILE +1

A building with indoor heat exchange circulation system

The present application discloses an indoor heat exchange circulation system building, which specifically relates to the field of heat exchange technology in buildings, including a heat exchange mechanism and a water pipe; the heat exchange mechanism includes an annular water pipe, a U-shaped connecting pipe and a heat dissipation fin; the two ends of the U-shaped connecting pipe are connected to the annular water pipe, and the water pipe and the annular water pipe are connected by water; the heat dissipation fin is plugged and fixed in the U-shaped connecting pipe, and the heat dissipation fin is connected to the U-shaped connecting pipe. The present invention provides an indoor heat exchange circulation system building, which realizes rapid heat dissipation of the heat source by increasing the contact surface with the air, thereby improving the heat exchange efficiency between the heating heat source and the environment.
Owner:HANGZHOU ZHONGLIAN ZHUJING ARCHITECTURAL DESIGN CO LTD