Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

581 results about "Upper floor" patented technology

Item of furniture

A piece of furniture includes a furniture body with an upper floor and a flap, and at least one flap fitting being arranged on the upper floor in order to hold the flap movably between a position closing a storage space of the furniture body and an opening position. The flap fitting includes a housing, on which a support arm is rotatably mounted, which includes a retaining element for fixing the flap, and an energy store, by means of which a force can be applied to the support arm, the support arm being articulatedly connected to a drive lever, which is articulatedly connected to a deflection lever. An opening limiter is provided between the drive lever and the deflection lever, by means of which the maximum opening position of the support arm can be adjusted. This allows the flap fitting to be flexibly adapted to the respective installation position.
Owner:HETTICH ONI

Building

To provide a building that can prevent the lower floor from being flooded in a configuration in which a space continuous with outdoor space is provided between the upper floor and lower floor.SOLUTION: A house 10 according to the present invention includes an upper floor 12 positioned above the ground G, and a lower floor 16 positioned below the upper floor 12; and a piloti 18 that are continuous with the outdoor space are provided between the upper floor 12 and the lower floor 16, making it possible to go between the floor surface of the lower floor 16 and the ground G. The lower floor 16 has a floating body 30 that floats on water, and if the lower floor 16 is flooded, it is levitated by the floating body 30.SELECTED DRAWING: Figure 1
Owner:DAIWA HOUSE INDUSTRY CO LTD

Embedded-keel-free installation system and installation method for large curtain wall

The invention provides a large curtain wall pre-embedding-free keel installation system and an installation method, which overcome the problems of a traditional keel pre-embedding construction scheme, reduce the installation cost, improve the installation precision, the construction efficiency and the reliability, reduce the safety risk and reduce the influence on a main body structure, and comprise a reinforced concrete slab and a reinforced concrete beam, an upper end plate and a lower end plate are respectively arranged on the top surface and the bottom surface of the reinforced concrete beam; the outer side and the inner side of the reinforced concrete beam are each provided with a plurality of vertically-distributed screws, and the upper ends and the lower ends of the screws located on the outer side of the reinforced concrete beam are connected with the upper end plate and the lower end plate correspondingly. When the curtain wall main keel is installed, the curtain wall main keel is located between two reinforced concrete beams corresponding to an upper floor and a lower floor of a building, the upper end of the curtain wall main keel is connected with the lower end plate located on the upper layer, and the lower end of the curtain wall main keel is connected with the upper end plate located on the lower layer.
Owner:CHINA RAILWAY TENTH GRP FOURTH ENG CO LTD +2

Systems and methods for resisting soft story collapse

The present subject matter relates to systems and methods for providing resistance to soft story collapse in a multi-story structure. Such systems and methods includes providing a multi-story structure having a first floor and one or more upper floors, wherein a structural of the first floor is less than 70% of a structural stiffness of the one or more upper floors, and decreasing the structural stiffness of the one or more upper floors to be less than or substantially equal to the structural stiffness of the first floor.
Owner:THE STEEL NETWORK

Floor overhead layer module and ground air supply duct structure

The floor overhead layer module comprises an upper floor, a lower floor and a plurality of overhead supporting columns, the overhead supporting columns are regularly distributed on the upper surface of the lower floor, and a plurality of first mounting grooves in one-to-one correspondence with the overhead supporting columns are concavely formed in the lower surface of the upper floor; the tops of the multiple overhead supporting columns are installed in the corresponding first installation grooves so as to support and fix the upper floor, and then an overhead space is formed between the lower floor and the upper floor. According to the technical scheme, the technical problems that an existing ground air supply duct structure is difficult to construct, only small-air-volume circulating air supply can be conducted, and the circulating air volume or the circulating number of times of an all-air system cannot be met can be effectively solved.
Owner:GUANGDONG PHNIX ECO ENERGY SOLUTION

Position identification device and detection system for absolute position detection of elevator car

The utility model relates to a position identification device and a detection system for detecting the absolute position of an elevator car, belongs to the technical field of elevator equipment, and solves the problems of low precision, high environmental requirements, high cost and the like in the conventional method for detecting the absolute position of the elevator car. The detection system comprises a position identification device and an identification recognition device, the position identification device comprises magnetic strips installed in an elevator shaft in a segmented mode, and an upper door area, an upper floor absolute coding area, a flat layer position induction area, a lower floor absolute coding area and a lower door area are sequentially distributed on each magnetic strip. The identification recognition device reads sensing data of the Hall sensors corresponding to all the areas of the magnetic strip and outputs corresponding signals to an elevator control system. According to the utility model, the overall length of the magnetic strip is shortened, the cost is low, the absolute position detector is suitable for absolute position detection of elevator cars in high-rise and super high-rise buildings, the service life is long, the detection precision is high, the induction distance is large, the anti-interference performance is strong, and the absolute position detector is not easily influenced by ambient light intensity, cleanliness and magnetic field.
Owner:CHANGCHUN SHENGHAO ELECTRONICS

Vibration reduction floor

The invention discloses a vibration reduction floor, and relates to the technical field of vibration reduction equipment, the vibration reduction floor is applied to a building, the vibration reduction floor comprises a vibration reduction cushion layer and an upper floor, the vibration reduction cushion layer comprises a first cushion layer and a second cushion layer, the first cushion layer is horizontally laid on a floor of the building, and the second cushion layer is laid along the edge of the bottom of a wall of the building; the second cushion layer is connected with the first cushion layer, and a first area is defined by the first cushion layer and the second cushion layer; the upper floor comprises a concrete layer and floor tiles, and the concrete layer is laid in the first area; the floor tiles are laid on the concrete layer, and the floor tiles are located in the first area; the overall resonance frequency of the anti-vibration cushion layer and the upper floor is smaller than or equal to 30 Hz. The upper floor is laid in the first area of the anti-vibration cushion layer to provide vibration reduction for the upper floor, and due to the fact that the overall resonance frequency of the anti-vibration cushion layer and the upper floor is smaller than or equal to 30 Hz, indoor vibration of sensitive buildings caused by vibration of urban rail transit can be effectively reduced.
Owner:CENT FOR NUCLEAR & RADIATION SAFETY MINISTRY OF ECOLOGY & ENVIRONMENT

One-driving-two manure scraping equipment for collecting manure on upper floor and lower floor

The utility model relates to the technical field of pig farm equipment, in particular to one-dragging-two manure scraping equipment for collecting manure on an upper floor and a lower floor, which comprises transverse plates, vertical plates fixedly connected around the middle of the two transverse plates, a grid plate arranged between the two transverse plates, and rotating plates symmetrically arranged on two sides of the grid plate; inserting grooves are formed in the vertical plates on the left side and the right side of the transverse plate, inserting blocks are arranged in the inserting grooves, and a dirt collecting groove is formed in one side of the bottom end of the grid plate. A motor rotates to drive threaded rods to rotate, the threaded rods rotate to drive a driving belt wheel to rotate, and the two threaded rods are driven to rotate synchronously, so that a scraping plate moves in the horizontal direction, pig manure at the lower end of a grid plate is scraped into a sewage collecting groove and flows into a sewage discharging pipeline through a guide plate to be collected, and the pig manure on the upper floor and the lower floor is collected synchronously; the cleaning efficiency of the equipment is improved, and industry conventions are broken through to achieve floor crossing one-driving-two manure scraping equipment.
Owner:QINGDAO ZEYU KAISHENG MASCH MFG CO LTD

Modularized indoor lighting adjusting structure

The utility model provides a modularized indoor lighting adjusting structure which comprises a light reflecting shutter, a light guide plate, a light guide plate, a light guide plate, a light guide plate and a light guide plate, and the light reflecting shutter is located on the inner side of a window and used for reflecting light emitted into the window; reflective shutters are arranged between the diffuse reflection plate and the window, and reflected light of the reflective shutters irradiates the diffuse reflection plate; and the diffuse reflection plate is mounted on a suspended ceiling layer of the ceiling through the height adjusting piece. According to the scheme, light rays are irradiated to the light reflecting shutters through the window, the light reflecting shutters reflect sunlight to the diffuse reflection plate, under the action of the diffuse reflection plate, the light rays are gently subjected to diffuse reflection, the reflection face can be enlarged, part of diffuse reflection light rays are irradiated to the suspended ceiling layer, diffuse reflection is generated again under the action of the suspended ceiling layer, and therefore the light rays are more attractive. According to the scheme, the indoor lighting intensity of the reading room is improved, and meanwhile the softness of indoor light can be guaranteed.
Owner:GOLD MANTIS CONSTR DECORATION

Drainage pipe joint updating method and drainage pipe structure

To provide drainage pipe joints with optimal vibration damping performance, vibration isolation performance, and sound insulation performance, as well as suitable water tightness.SOLUTION: A drainage pipe joint 100 comprises a pipe main body 110 that is placed in a through hole of a floor slab S when installed in a building, an upper riser pipe connection part 120 that connects a drainage riser pipe 520 that protrudes above the floor slab S and allows drainage water to flow in from the upper floor, a drainage pipe connection part 130 that connects a drainage riser pipe 530 that protrudes below the floor slab S and allows drainage water to flow out to the lower floor, and a horizontal branch pipe connection part 140 that connects a drainage horizontal branch pipe 510 above the floor slab S. An outer layer member 700 is provided so as to be wound around the outer periphery of the pipe main body 110, and the outer layer member 700 has a three-layer structure consisting of, from the inner layer, a vibration damping material 714, a vibration insulator 720, and a sound insulation cover 730, and the sound insulation cover 730 covers the entire length of the vibration insulator 720 in the vertical direction.SELECTED DRAWING: Figure 5
Owner:KUBOTA CHEMIX CO LTD

Electric screw type construction supporting device

The utility model discloses an electric screw type construction supporting device which comprises a first stand column, a second stand column and a nut. The first stand column and the second stand column each comprise a guide rail, a screw installed on the guide rail, a motor installed on the guide rail and used for driving the screw to rotate, a supporting assembly installed on the guide rail and a fixing assembly used for fixing the guide rail, and the screw of the first stand column and the screw of the second stand column are both in threaded connection with the nut. The electric screw type construction supporting device is used for supporting a horizontal prefabricated part, pouring of an upper floor can be carried out during maintenance of a lower floor, maintenance and pouring can be carried out at the same time, the construction period can be shortened, and the construction cost can be reduced.
Owner:BEIJING ZULIN FORMWORK & SCAFFOLDING CO LTD

Automobile fan heater mounting structure and automobile

The invention discloses an automobile warm air blower mounting structure and an automobile, and belongs to the technical field of automobile heating, the automobile warm air blower mounting structure comprises a double-layer floor structure, the double-layer floor structure comprises an upper floor and a lower floor, the upper floor is laterally viewed to form a two-stage step structure, and the two-stage step structure is fixed on the lower floor which is laterally viewed to form an approximately L-shaped structure to form a step structure with a hollow cavity; an air outlet is formed in the vertical end face of the upper floor, the lower floor comprises a fan heater mounting frame, and the fan heater mounting frame is contained in the hollow cavity of the step and is adjacent to the air outlet. The double-layer floor forms a step structure, the fan heater is installed in the step structure and supplies air from the air outlet in the side wall of the step, and the seat is installed on the step, so that the lower limbs of passengers are prevented from being directly blown by the fan heater, and the passengers feel more comfortable; the height of the step can be suitable for warm air blowers with different heights; the warm air blower is mounted in the floor, so that more activity space can be obtained for legs, and the shape and the function of the seat are not limited any more; the double-layer floor structure is composed of aluminum alloy and polypropylene cellular boards, and energy conservation, emission reduction and light weight are achieved.
Owner:CHINA FAW CO LTD

Curtain wall fitting method

To provide a curtain wall fitting method that can improve workability of fitting a curtain wall.SOLUTION: A curtain wall fitting method includes the steps of: temporarily placing a lower end of a curtain wall suspended by a hanging device on a fitting floor; fitting a transport device installed on a slide rail on an upper floor to an upper end of the curtain wall temporarily placed on the fitting floor; transporting the curtain wall along the slide rail by the transport device to a fitting position so as to span fitting areas of a plurality of curtain walls in a width direction of a building; and fitting the curtain wall transported by the transport device to the fitting floor.SELECTED DRAWING: Figure 8
Owner:OHBAYASHI GUMI LTD

A multi-layer reinforced protection device

The present invention discloses a multi-layer reinforcement protection device, including a counterweight box, in which a driving motor is arranged, and the driving motor is connected to a supporting cantilever through a gear transmission. The application adopts a multi-layer height design, which can play a buffering and insurance role for people in three times. The first layer is a dense mesh protection net, which is closer to the upper floor, and the horizontal cantilever is relatively short. When the worker steps on the air, it can quickly play a supporting role, and at the same time, it can play a role in receiving the small parts that roll down; the extension distance of the second layer of horizontal cantilever is greater than the extension distance of the first layer, and it can play a role in receiving when the worker steps on the air and flips back. The second layer adopts a large-aperture protection net, which mainly plays a role in buffering the human body, connecting the joints such as the feet, and increasing the probability of people grabbing the second layer of protection net. The third layer of protection net is closest to the support layer of the bottom layer, can withstand the maximum torque, and extends the farthest outside the floor, which is used to receive heavy objects and workers who are knocked over by the second layer.
Owner:BEIJING URBAN CONSTR INSTALLATION ENG

Coal mining method for controlling surface subsidence by floor isolation grouting and filling

The present application relates to the field of mining area subsidence reduction and filling mining, in particular to a floor isolation grouting filling control surface subsidence mining method; a certain thickness of rock stratum is selected as a floor pressure bearing protective layer below a floor failure zone, the floor pressure bearing protective layer arches under grouting pressure, but no fissure leading to the upper floor failure zone is generated; the floor pressure bearing protective layer bottom interface is taken as a grouting layer, a grouting borehole is connected to the grouting layer; working face mining is carried out, when grouting filling can be carried out, filling slurry is injected from the grouting borehole to the grouting layer. The filling slurry lifts the floor grouting pressure bearing layer and the floor failure zone under high pressure, finally fills the entire goaf, reduces the breaking degree of the coal seam roof, controls the subsidence amplitude of the overlying strata, and further reduces the surface subsidence amplitude. In the present application, the mining and grouting filling processes are separated, the influence of grouting filling operation on working face mining is avoided, and the present application is particularly suitable for coal mine areas with dense buildings.
Owner:CHINA UNIV OF MINING & TECH

Building security monitoring system

The utility model discloses a building security and protection monitoring system, which is used for security and protection monitoring in building floors, and is characterized by comprising a camera shooting module provided with a plurality of network cameras, and one network camera is arranged in each floor; the wireless transmission module is provided with a plurality of wireless gateways, one wireless gateway is arranged in each floor, a wireless network is connected with a network camera, the wireless gateway on the upper floor is sequentially cascaded with the wireless gateway on the lower floor, a router is arranged on the roof, an SIM (Subscriber Identity Module) card is arranged in the router, and the router is respectively connected with the wireless gateway on the uppermost floor and the monitoring center; the power supply module is provided with a plurality of energy storage battery modules, each floor is provided with one energy storage battery module, and the energy storage battery modules are respectively connected with the network cameras and the wireless gateways in the corresponding floors; according to the invention, wiring-free deployment of the monitoring system for the rear stair area of the old building is realized. And wireless signals are kept stable through short-distance multi-hop transmission.
Owner:ZHITIANBAO TECHNOLOGY CO LTD

Novel edge constructional column aluminum formwork construction device and construction method

The novel edge constructional column aluminum formwork construction device comprises a support arranged on an upper floor slab and an aluminum alloy formwork, the support is in a cross shape, pulleys are arranged at the two ends and the top of the support, and the novel edge constructional column aluminum formwork construction device further comprises a connecting steel plate arranged on the upper floor slab. The connecting steel plates are respectively welded on the upper surface of the upper floor and the floor wall surface; according to the method for driving the aluminum formwork through the support, in the actual construction process, operability is high, increase and decrease can be conducted according to the site reality, installation is convenient, meanwhile, installation is rapid and convenient, after an external scaffold is dismantled, installation is conducted through a crank arm vehicle in a traditional mode, time and labor are consumed, the installation time of workers can be effectively shortened, applicability is high, and the construction efficiency is improved. Installation and detachment are convenient, construction elevators and other machines and tools can be adopted for transportation upstairs, the requirements for sites and environments are not high, the rubber sealing strips additionally arranged on the two sides of the aluminum formwork can effectively prevent slurry leakage, and the engineering quality and the finished product effect are guaranteed.
Owner:CHINA CONSTRUCTION EIGHTH BUREAU (INNER MONGOLIA) CONSTRUCTION CO LTD

Building

A building includes a floor located between an upper floor and a lower floor. The floor includes first floor extending members and second floor extending members that intersect the first floor extending members. The first floor extending members and the second floor extending members are made of wood. A reinforcement member is arranged in at least one of a section between two of the first floor extending members and a section between two of the second floor extending members.
Owner:SEKISUI HOUSE KK

A method for installing a time-zone type round-table curtain wall

This invention discloses an installation method for a time-zone-division circular pedestal curtain wall. The time-zone-division circular pedestal curtain wall includes time-zone-division curtain wall units. A set of curtain wall glass is arranged with 24 units corresponding to 24 time zones, forming a pedestal shape that is smaller at the top and larger at the bottom. A time zone pointer is also provided at the top of the curtain wall glass, and the projection of the time zone pointer is projected onto the outer surface of the curtain wall glass. This invention facilitates the lighting and aesthetic requirements of the central area by setting a continuous circular pedestal curtain wall in the middle of the corridor. The setting of the lower and upper floor sloping walls facilitates the installation of the curtain wall keel, providing a fixed foundation and ensuring the overall structural integrity. The time-zone setting of the curtain wall glass ensures both aesthetic appeal and ease of installation while improving lighting efficiency. The setting of the time zone pointer and the pointer connecting wall further makes the central curtain wall resemble a sundial, enriching the structural types, and the pointer connecting wall at the connection point ensures the stability of the installation.
Owner:BEIJING URBAN CONSTR SIXTH GRP

Prefabricated building wallboard connecting piece capable of dissipating energy and prefabricated building wallboard

The invention relates to a prefabricated building wallboard connecting piece capable of dissipating energy and a prefabricated building wallboard, the prefabricated building wallboard connecting piece comprises a plurality of first connecting pieces and a plurality of second connecting pieces, and the first connecting pieces and the second connecting pieces are arranged at the top of the wallboard and used for connecting the wallboard and an upper floor beam slab; the first connecting piece comprises a first supporting groove and a first supporting piece, the first supporting piece is matched with the first supporting groove in an inserted mode, and the first connecting piece is configured to be in sliding friction between the first supporting groove and the first supporting piece and generate friction damping when the upper floor beam plate and the wall plate are relatively close to each other; the second connecting piece comprises a second supporting groove and a second supporting piece, the second supporting piece is matched with the second supporting groove in an inserted mode, and the second connecting piece is configured to be in sliding friction between the second supporting groove and the second supporting piece and generate friction damping when the upper floor beam plate and the wall plate are relatively away from each other; the two connecting pieces generate friction damping in the vertical direction and the horizontal direction.
Owner:POWERCHINA HUADONG ENG CORP LTD

Construction operation platform and construction operation method of super high-rise fully-enclosed air shaft structure

The application discloses a construction operation platform of an ultra-high full-closed wind well structure and a construction operation method. When a floor is lifted, a supporting corner is adjusted on a screw rod through an adjusting nut, the supporting corner is close to a square steel frame, the supporting corner no longer supports an inner wall of the wind well, a universal ball is rotated out of the screw rod, a rolling ball body of the universal ball is in rolling contact with the inner wall of the wind well, a tower crane is lifted through a lifting ring, the lifting ring pulls a steel plate, the steel plate pulls the square steel frame to roll and lift on the inner wall of the wind well, and the square steel frame is installed at a mounting position of an upper floor. After a wall-penetrating bolt is used for construction, the square steel frame is installed, the universal ball is rotated into the screw rod and no longer in contact with the inner wall of the wind well, and the supporting corner is adjusted to abut against the inner wall of the wind well to limit the square steel frame. The construction operation platform can be built in the wind well and lifted without disassembly, the problem that the rod body needs to be disassembled and reassembled when the floor is lifted is solved, and the construction efficiency is improved.
Owner:CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD +1

Fabricated steel truss-concrete composite floor system and assembling method thereof

The invention provides an assembly type steel truss-concrete composite floor system and an assembly method thereof, and relates to the technical field of floor system buildings. The structure comprises at least one combination box, the combination box comprises a box beam, at least one upper floor slab and at least one lower floor slab, the box beam is arranged on the bearing column, an upper containing groove is formed in the top of the box beam, a lower containing groove is formed in the bottom of the box beam, and the upper floor slab and the lower floor slab are arranged in the upper containing groove. The upper floor slab is arranged in the upper containing groove and connected with the box beam, and the lower floor slab is arranged in the lower containing groove and connected with the box beam. The lower bottom surface of the floor system does not need to be leveled by workers through operations such as ceiling mounting in the later period, and the effect of low construction burden is achieved.
Owner:JIANGSU ZHONGCHENG DESIGN INST CO LTD

Reinforced concrete and wooden earthquake-resistant high-rise buildings

The present invention provides a reinforced concrete and wooden high-rise building with seismic isolation capabilities, which also allows for the stable support of the elevator shaft while avoiding interference with the lower floors. [Solution] A seismically isolated high-rise building 10 includes a lower floor 20 made of reinforced concrete and an upper floor 30 made of wood hybrid structure, wherein an intermediate seismic isolation layer 40 is provided between the lower floor 21 and the upper floor 22 of the lower floor 20. An elevator shaft 35 is supported by the upper floor 30 and extends to a height reaching the floor slab 21a of the lowest floor of the lower floor 20, and is supported inside the concrete core section 50. The elevator shaft 35 is inserted between the ceiling slab 41 and the floor slab 21a of the lower floor 21, maintaining a spacing of 41c, 21c between them and the opening edges of the insertion openings formed in the ceiling slab 41 and floor slab 21a.
Owner:OKUMURA CORP

Semi-basement unit

ActiveJP7883348B1BasementFloor slab
The aim is to provide a lightweight, inexpensive, and easy-to-install semi-underground unit that is unaffected by the live and dead loads of the upper floors of the building. [Solution] The semi-underground unit of the present invention consists of a factory-produced top cover plate, a residential unit or interior wall unit, a soil pressure reinforcement unit, and a retaining wall block body formed on-site. The top cover plate is provided with an entrance that connects to a stair cover unit connected to the underside of the building's floor. The residential unit or interior wall unit consists of a box-shaped lightweight steel frame formed of a structural seismic-resistant and reinforced structure such as a wall structure. The soil pressure reinforcement unit consists of a box-shaped lightweight steel frame formed of a structural seismic-resistant and reinforced structure such as a rigid frame structure and a wall structure that protrudes and opens to the ground surface. The retaining wall block body consists of a hollow box-shaped concrete wall whose upper surface protrudes and opens to the ground surface.
Owner:村山 哲夫

Hospital

This building is a hospital that has a multi-story parking lot and a linear accelerator housing facility, among other things. In this building, the retaining wall that forms the underground seismic isolation pit provided in the main building is raised higher than the ground, and a waterproof wall is formed to surround the main building. Therefore, the main building has a flood prevention function along with the seismic isolation structure. In addition, by providing the loading and unloading entrances for goods on the upper floors of the main building, there is no need to form a wide entrance for loading and unloading vehicles in the waterproof wall, and the flood prevention function of the main building is further enhanced. Also, by separating the floor of the loading and unloading entrance from the floor of the user entrance (the first floor), the flow lines of the management side and the users are clearly separated, enabling smoother hospital operation.
Owner:OHBAYASHI GUMI LTD

Adjustable elevator shaft operation platform device

The utility model discloses an adjustable elevator shaft operation platform device which comprises a construction platform plate, expansion plates are movably connected to the front side, the rear side and the left side of the construction platform plate, an anchoring plate is movably connected to the middle of the right side of the construction platform plate, and a platform framework is fixedly connected to the lower side of the construction platform plate. Two vertical sliding rods extending downwards are fixedly connected to the middle of the right side of the platform framework. The construction platform can drive the self-climbing frame mechanism to ascend through the driving mechanism, the self-climbing frame mechanism can be automatically hung on an upper floor through the second telescopic supporting mechanism after ascending to the upper layer, and then the self-climbing frame mechanism drives the construction platform to ascend through the driving mechanism. The first telescopic supporting mechanism of the construction platform plate at the bottom of the vertical sliding rod is automatically supported on the lower floor and just ascends to cross the upper surface of the upper floor, so that automatic climbing is achieved, and repeated lifting or repeated mounting and dismounting are not needed.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Construction method for one-time excavation through benching method

The construction method comprises the following steps: after a predetermined tunneling task of an upper step is finished, a tunneling part carries out tunneling operation of a lower step in a region where the construction of the lower step is located; upper step construction operation is synchronously carried out on the upper step; after the lower step tunneling operation is completed, lower step construction operation is synchronously carried out; before the operation of the upper floor stand, the unit vehicle is moved, the tunneling part is moved to the tunnel face to carry out the next cycle of upper step tunneling operation, and parallel operation of upper step construction and lower step construction is realized through the cycle; according to the scheme, the problems that mechanical equipment of all functional blocks in the front excavation primary support process of the front tunnel face is difficult to connect and parallel construction cannot be achieved are solved, the primary support ring forming process of new Austrian method construction is completed through mechanical and integrated rack integrated equipment, the safety step pitch is effectively controlled, and the excavation efficiency and safety are improved.
Owner:SICHUAN LANHAI ENG EQUIP MFG CO LTD

Joint

To provide a joint.SOLUTION: A joint is installed in an open hole formed on a floor slab of a building and has an aggregate part having a vertical pipe connection part to be connected to a vertical pipe extending from the upper floor and a horizontal pipe connection part to be connected to a horizontal pipe, an upper cylindrical part that connects the vertical pipe connection part and the aggregate part and has a larger inner diameter than that of the vertical pipe, and a lower connection part to be connected to the vertical pipe extending from the lower floor. At least any of the upper cylindrical part, the aggregate part, and the lower connection part is formed of resin. A first rotary member is disposed in either the upper cylindrical part or the aggregate part. A second rotary member is disposed in the lower connection part.SELECTED DRAWING: Figure 1
Owner:SEKISUI CHEMICAL CO LTD

Modularized external elevator riding track

The utility model relates to the technical field of external elevator people riding track construction, and particularly discloses a modularized external elevator people riding track which comprises a lower floor slab, an upper floor slab, an external elevator and a riding track structure arranged between the lower floor slab and the upper floor slab. The door is arranged on the belly portion above the riding track, the guardrails are arranged on the two sides of the riding track, the adjustable ejector rod is arranged at the bottom of the riding track, the riding track is of a rectangular plate-shaped structure, the entrance side and the exit side of the riding track are provided with a ramp and a hooking piece respectively, the hooking piece is of a hook-shaped structure, the hooking piece is connected with an entrance of an external elevator in a hooking mode, and the guardrails are arranged on the two sides of the riding track in the length direction of the riding track in a full-length mode. The bottoms of the guardrails are fixedly connected with the top face of the riding track, the door is arranged between the two guardrails and comprises two door leaves and a door frame, a bolt is arranged between the two door leaves, the door frame is arranged on the peripheries of the two door leaves, door shafts are arranged between the two door leaves and the door frame, and the door leaves are hinged to the door frame through the door shafts.
Owner:BEIJING URBAN CONSTR FIFTH CONSTR GRP

Efficient reinforced medical building radiation protection system easy to construct

The invention provides an efficient, reinforced and easy-to-construct medical building radiation protection system, which comprises a wall body structure, and is characterized in that the wall body structure comprises an upper floor slab, a lower floor slab and four enclosing walls; the multiple bearing frame bodies are fixedly installed at the bottom of the upper floor slab and on the enclosing wall in an array mode, and the bearing frame bodies are transversely arranged; the assembly type protection mechanism is installed on the bearing frame body, the assembly type protection mechanism design is adopted, installation is convenient, in the assembly type protection mechanism, a connecting piece is installed on the bearing frame body in a sliding mode, and a clamping groove is formed between a clamping piece and the connecting piece and used for clamping and fixing a first lead plate; and the clamping piece is detachably connected with the connecting piece, so that the lead plates are convenient to maintain, and the lead plates I with different thicknesses can be mounted according to use requirements.
Owner:THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU