The invention relates to the technical field, in particular to an intelligent scheduling management method and
system for
server spare parts, and the method comprises the following steps: analyzing logistics and contracts, matching addresses with an AC
automaton to obtain regions and delivery volumes, extracting contract proportions to construct a customer mapping table, and counting the inventory and the number of inventory and in-transit customer parts in the regions. And calculating the
failure rate, analyzing the BOM to obtain a replaceable
list, calculating the total demand, subtracting the inventory and the in-transit amount to obtain a net application number, and when the net application number is greater than zero, integrating each piece of information to generate a
spare part application scheduling plan. According to the method, logistics and contract information is automatically analyzed, a differentiated demand model combining customer contract proportion and component historical
failure rate is dynamically constructed, fixed experience proportion is abandoned, regional real-time inventory and in-transit quantity are integrated, a net application gap is accurately calculated, and meanwhile, a replaceable component
list is fused into a scheduling plan, so that the scheduling efficiency is improved. The
spare part scheduling accuracy and the supply chain response flexibility are greatly improved, and the risks of resource mismatching and inventory overstock are effectively avoided.