Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

30results about How to "Scheduling in real time" patented technology

Multi-core parallel simulation engine system supporting joint operations

The invention discloses a multi-core parallel simulation engine system supporting joint operations. The system solves the problem that the real-time performance of a traditional joint operation system is easily influenced when step length is used to forward logic time. The system includes a model scheduling management module, a thread management module, an external interface management module and a high-level architecture (HLA) management module. According to the system, target nodes are assigned for simulation entities to enable total computation amounts of models on each node to be equivalent; then through the model scheduling management module, a scheduling schedule of each node is generated based on a principle of load balancing, the simulation step length is assigned for the models, and during a simulation process, the scheduling schedule is adjusted and the simulation step length of the destroyed entities and generated new entities is adjusted. The system can autonomously divide the scheduling schedule according to operating cycles of the models and the system step length, allow the entities to use the different physical models or the behavior models according to needs for simulation, and support real-time scheduling of large-scale simulation and the high-fidelity operation models.
Owner:BEIHANG UNIV

Synthesis optimizing and scheduling system of energy system

The present invention discloses an integrated and optimal scheduling system of an energy system, which is respectively connected with a management information system and a production process control system. The integrated and optimal scheduling system comprises an operation interface, an information monitoring and scheduling function module, a data analysis function module, an energy optimizing function module, an energy planning function module, an event management function module, a functional model base, a relational database, real-time database, an interface module and a manual input interface; wherein, the information monitoring and scheduling function module, the data analysis function module, the energy optimizing function module, the energy planning function module and the event management function module are respectively connected with the operation module and the functional model base; the relational database is respectively connected with the operation interface, the functional model base, the real-time database and the manual input interface; the relational database is connected with the management information system through the interface module; and the real-time database is connected with the production process control system. The present invention can scientifically and accurately schedule the energy supply, and reduce the energy waste and pollutants.
Owner:SOUTH CHINA UNIV OF TECH

Synthesis optimizing and scheduling method of energy system

The method comprises the following steps: firstly, field production energy flow data are input into a relational database through a manual input interface, or a real-time database collects the field production energy flow data transmitted by a production process control system and stores the data into the relational database; secondly, the scheduling personnel operates the information monitoring and scheduling function module, the data analysis function module through an operation interface, or triggers an event management function module through an external event, so as to read and write the relational database, or the scheduling personnel reads and writes the relational database through the operation interface or an management information system, transforms the data format of the read data, transmits the data to the operation interface for displaying or printing or to the management information system; thirdly, the scheduling personnel operates an energy optimizing function module and an energy planning function module to adopt the corresponding optimal scheduling for the production energy system according to the displayed or printed data and advice. The present invention can realize the global optimization of the enterprise energy scheduling.
Owner:SOUTH CHINA UNIV OF TECH

Regional first-aid monitoring method, system and device based on vehicle scheduling

InactiveCN109166311AQuick rescueBalanced occupancy rate of first aid resourcesData processing applicationsDetection of traffic movementDiseaseResource utilization
The invention discloses a regional first-aid monitoring method, system and device based on vehicle scheduling. The method comprises the steps of: generating a pre-arranged first-aid plan according toa first-aid call, wherein the pre-arranged first-aid plan comprises the disease of a patient, a preliminary diagnostic result, a disease place and a first-aid place; according to the first-aid place in the pre-arranged first-aid plan, determining a first-aid medical site based on a proximity principle; according to the pre-arranged first-aid plan, determining a first-aid vehicle through a pre-setvehicle scheduling algorithm; and monitoring the first-aid vehicle and the first-aid medical site in real time through an IOT technology. The system comprises a pre-arranged plan generation module, afirst-aid medical site determining module, a first-aid vehicle determining module and a monitoring module. The device comprises a storage and a processor. The regional first-aid monitoring method, system and device based on vehicle scheduling in the invention have the advantages of being balanced in first-aid resource utilization rate, rapid in rescue speed and high in emergency capability, and can be widely used in the technical field of first-aid systems.
Owner:广东康软科技股份有限公司

Shoemaking production line layout based on personalized customization and scheduling mode of the shoemaking production line layout

The invention discloses a shoemaking production line layout based on personalized customization and a scheduling mode of the shoemaking production line layout, and the specific layout and scheduling steps are as follows: step 1, based on personalized customization, production is carried out by a production line according to a customer customization order, and the customization order is generated after foot shape measurement, shoe style selection and vamp pattern customization are carried out by each customer in a store; step 2, an operator of the production line issues a process instruction book for production in combination with MES, and pattern files and process parameters corresponding to an order are downloaded and uploaded to the flying loom for production when the order is issued; step 3, on the basis of the step 2, vamp auxiliary materials are conveyed to a vamp auxiliary material lighting warehouse through a vamp auxiliary material conveying line to wait for being matched withthe vamps, and after matching is completed, the vamps with the RFID tags, the auxiliary materials and the material boxes are conveyed to stations needed by vamp forming through a vamp forming roller conveying line to be operated. The shoemaking production line layout based on personalized customization and the scheduling mode thereof are stable and reliable, equipment is simple, operation is convenient, practicability is high, and the shoemaking production line layout is suitable for wide application and popularization.
Owner:中电望辰科技有限公司

Transport vehicle self-adjusting center system of mobile substation

The embodiment of the invention discloses a transport vehicle self-adjusting center system of a mobile substation. The system comprises a performance management and control module, a scheduling main control center, a fault management module and a network adjustment module. The performance management and control module sets an alarm threshold value for maintaining normal operation of the system. The performance alarm statistics module is connected with the dispatching main control center; the dispatching master control center is connected with the fault management module through a performance comprehensive query module. The signal end of the fault management module is connected with a guarantee management and control subsystem. The communication end of the guarantee management and control subsystem is connected with a monitoring host through a wireless network. The whole system takes a management and control system as a framework; on the basis of the data information stored in the database, the system of the network dispatching center is integrated, finally, the functions of fault management and dispatching of the transport vehicles are achieved, the transport vehicles can be dispatched in real time, the transport vehicles can be replaced in time according to system alarms, and therefore the working efficiency of the mobile substation is improved.
Owner:GUANGDONG POWER GRID CO LTD +1

An optimal dispatching method for joint flood control of mixed cascade reservoirs considering the use of flood diversion and storage embankments

The invention discloses a combined cascaded reservoir combined flood control optimal dispatching method considering the use of flood diversion and storage embankments, comprising the following steps: S1, obtaining samples of flood diversion flow, flood diversion time, and submerged area / flood diversion volume when the embankment may be used for flood diversion; S2, training the artificial neural network model based on the sample, constructing the flood diversion flow-submerged area / flood diversion volume spatio-temporal prediction knowledge base; S3, establishing a flood control optimization dispatching model considering the use of flood diversion and storage embankments; S4, based on the spatio-temporal prediction The knowledge base calculates and analyzes the optimal dispatching model for combined flood control of mixed reservoirs considering the use of flood diversion and storage mixed reservoirs combined with civil embankments, and obtains the optimal dispatching scheme. The present invention constructs flood diversion flow-submerged area / flood diversion amount spatio-temporal prediction knowledge base by training artificial neural network, and uses it as a boundary condition of combined cascade reservoir joint flood control optimal scheduling model, so that flood diversion information can be extracted in real time and real-time scheduling can be realized .
Owner:HUAZHONG UNIV OF SCI & TECH

Hydropower station peak regulation discharge amplitude prediction method based on water level amplitude variation control

The invention discloses a hydropower station peak regulation discharge amplitude prediction method based on water level amplitude variation control. The method comprises the following steps: simulating a non-constant flow process in a river channel by adopting a one-dimensional Saint-Venant equation set; solving the water level of each station along the downstream river channel of the hydropower station at each moment, and calculating the water level amplitude of each station along the downstream river channel of the hydropower station; establishing a function relationship between the peak regulation discharge amplitude of the hydropower station and the water level amplitude of the downstream navigable river reach; and substituting the water level variable amplitude of the downstream navigable reach required by shipping into the function relationship to obtain the peak regulation discharge amplitude of the hydropower station meeting the water level variable amplitude control requirement of the downstream navigable reach. According to the method, through one-dimensional non-constant flow simulation calculation, the correlation between the peak-load discharge amplitude of the hydropower station and the water level amplitude of the downstream navigable reach is established in advance, and then the water level amplitude control requirement of the downstream navigable reach is directly converted into the peak-load discharge amplitude of the hydropower station, so that clear constraint conditions are provided for dispatching of the hydropower station; the target of real-time and flexible dispatching of the hydropower station is achieved.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES

Synthetic optimizing and scheduling system of energy system

The present invention discloses an integrated and optimal scheduling system of an energy system, which is respectively connected with a management information system and a production process control system. The integrated and optimal scheduling system comprises an operation interface, an information monitoring and scheduling function module, a data analysis function module, an energy optimizing function module, an energy planning function module, an event management function module, a functional model base, a relational database, real-time database, an interface module and a manual input interface; wherein, the information monitoring and scheduling function module, the data analysis function module, the energy optimizing function module, the energy planning function module and the event management function module are respectively connected with the operation module and the functional model base; the relational database is respectively connected with the operation interface, the functional model base, the real-time database and the manual input interface; the relational database is connected with the management information system through the interface module; and the real-time database is connected with the production process control system. The present invention can scientifically and accurately schedule the energy supply, and reduce the energy waste and pollutants.
Owner:SOUTH CHINA UNIV OF TECH

Intelligent scheduling device suitable for carrier communication of ring distribution network and method therefor

The invention discloses an intelligent scheduling device suitable for carrier communication of a ring distribution network and a method therefor. The intelligent scheduling device is arranged in the ring distribution network, and comprises a microprocessor module, as well as an Ethernet interface module, a synchronous dynamic random access memory, a flash memory and two serial interface modules, which are respectively connected with the microprocessor module. The intelligent scheduling device further comprises a power supply module for supplying power to the above modules. In the invention, the characteristic that the carrier communication links of the ring distribution network are the same in a ring manner is fully utilized, and the MCU (Microprogrammed Control Unit) microprocessor module is used for control, so as to monitor the communication state of two carrier networks of the ring distribution networks in real time, when some point fails to work, the one with interrupted communication is automatically switched to the other carrier network from carrier equipment, and when the failure of the point is removed, the original carrier lattice structure is restored. According to the invention, full-automatic switching and scheduling of carrier communication are achieved without the need of manual intervention, and the scheduling is carried out in real time without influencing normal carrier communication.
Owner:SHANGHAI MUNICIPAL ELECTRIC POWER CO +1

A data-driven linear solution method for power grid power flow equation

The present invention relates to the field of grid power flow calculation and the technical field of data driving, and provides a data driving-based grid power flow equation linearization and solving method. The method comprises: first establishing mapping equations from active power injection and reactive power injection to voltage phase angle and voltage amplitude according to node types of nodes of a power system, and then listing calculation expressions of power flow equation solutions according to the relations between known and unknown quantities of the node types; and proposing, according to data such as the active power injection, reactive power injection, voltage amplitude, and voltage phase angle in historical measurement data of the grid, a Bayesian linear regression method for grid power flow equation linearization in which a grid data colinearity characteristic is considered, so as to obtain the solution of a linearized power flow equation. The present invention can improve the precision of grid power flow equation calculation and facilitate reducing grid operation costs. In addition, the present invention reduces the calculation amount, improves the calculation flexibility, and better accords with the actual situations of the power system in engineering application.
Owner:TSINGHUA UNIV

A Multi-core Parallel Simulation Engine System Supporting Joint Operations

The invention discloses a multi-core parallel simulation engine system supporting joint operations. The system solves the problem that the real-time performance of a traditional joint operation system is easily influenced when step length is used to forward logic time. The system includes a model scheduling management module, a thread management module, an external interface management module and a high-level architecture (HLA) management module. According to the system, target nodes are assigned for simulation entities to enable total computation amounts of models on each node to be equivalent; then through the model scheduling management module, a scheduling schedule of each node is generated based on a principle of load balancing, the simulation step length is assigned for the models, and during a simulation process, the scheduling schedule is adjusted and the simulation step length of the destroyed entities and generated new entities is adjusted. The system can autonomously divide the scheduling schedule according to operating cycles of the models and the system step length, allow the entities to use the different physical models or the behavior models according to needs for simulation, and support real-time scheduling of large-scale simulation and the high-fidelity operation models.
Owner:BEIHANG UNIV

A mobile substation transport vehicle self-adjustment center system

The embodiment of the present invention discloses a mobile substation transport vehicle self-adjustment center system, including a performance management and control module, a dispatching main control center, a fault management module and a network adjustment module. The performance management and control module sets an alarm threshold for maintaining the normal operation of the system. The dispatching main control center is connected to the dispatching main control center through a performance alarm statistics module, and the dispatching main control center is connected to the fault management module through a performance comprehensive query module, and the signal end of the fault management module is connected to a guarantee management and control subsystem, and the guarantee management and control The communication end of the subsystem is connected to the monitoring host through the wireless network. The whole system is based on the management and control system, combined with the data information stored in the database, and integrates the system of the network commissioning center, and finally realizes the fault management and scheduling of transport vehicles. The function can dispatch transport vehicles in real time, and replace transport vehicles in time according to system alarms, thereby improving the work efficiency of mobile substations.
Owner:GUANGDONG POWER GRID CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products