The invention relates to the technical field of
project management, in particular to a building
engineering project construction
quality management method and
system, and the method comprises the following steps: obtaining a drawing node sequence index and comparing a process
stage number, screening compliant nodes, judging the reasonability of a task configuration
time sequence, analyzing the deviation of an included angle between a crack angle and a load direction, and recognizing structural
abnormality. And aggregating the partition abnormal nodes to form a construction project quality
risk distribution section mapping result. According to the method, the structure drawing node sequence is compared with the construction process, it is guaranteed that input data logic is unified, the task configuration reasonability is improved through input time and stage sequence cross check, a stress deviation judgment mechanism is established in the crack direction through vector included angle and load comparison, and structural logic
verification of inspection data is achieved; abnormal nodes are identified according to double standards of time compliance and stress deviation, a
spatial density model is constructed by combining partition aggregation with an
area ratio, building quality
risk distribution is accurately presented, and the problem focusing and
processing priority judgment capability is enhanced.