The invention belongs to the technical field of tunnel and underground
engineering construction safety protection, and discloses a gas tunnel grading
fortification and comprehensive guarantee method which comprises the steps that gas content w,
gas pressure P, surrounding rock gas permeability and geological stress data are collected before construction; establishing a grading rule according to the parameters and generating a risk partition map in combination with the tunnel section, wherein the map is updated once every 50-100m along with construction; in the construction stage,
elimination-rotation-release-sealing
fortification is carried out according to subareas, pre-pumping, channel guiding and discharging, three-level ventilation and composite seepage prevention and grouting isolation are carried out in a high-
risk area, and spraying and grouting with different thicknesses are adopted in a medium-
risk area and a low-
risk area respectively; setting multiple parameter thresholds of concentration, flow and pressure in
coal uncovering operation, and triggering emergency ventilation, extraction and plugging; in the operation stage, a double-layer anti-seepage
system composed of a PVC coiled material and a grouting isolation belt is constructed, and
grout is supplemented regularly; data are obtained through a
monitoring system composed of a gas sensor, a stress meter and a displacement meter.