The invention relates to a
surface barrier structure for dam termite prevention and an implementation method. A dam comprises a dam body, a protection slope, drainage prisms and infiltration lines. The
surface barrier structure comprises an anti-termite layer which is arranged between a protection slope and a dam body and comprises a liquid-doped soil layer and a water-resisting layer from outside to inside; the water conveying
system comprises a water conveying main
pipe and water conveying
branch pipes, the water conveying
branch pipes are arranged at different elevations of the liquid-doped soil layer, the upper end of the water conveying main
pipe is used for inputting doped liquid, and the lower end of the water conveying main
pipe is connected with the water conveying
branch pipes at different elevations; by pre-burying the water conveying pipeline, the process of increasing the salt (chemical) content of soil can be extended to the time after the dam body is completed, construction is easy and convenient, the influence on dam body construction is small, the construction period is shortened, the construction quality of the barrier structure is guaranteed, and the construction cost is reduced; the salt (
pesticide) content of soil can be monitored in real time in the operation and maintenance period, salt (
pesticide) water conveying is carried out according to actual conditions, the protection effect of the barrier structure is ensured, and maintenance is convenient; the water-resisting layer in the anti-termite layer is made of clay, combination of soil
layers is facilitated, and stability of the dam slope is guaranteed.