The invention discloses an offshore
pile foundation excavation construction method and equipment based on
zoning delayed blasting, and relates to the field of blasting construction, the method comprises the steps that in an erected drilling
machine platform, a blast hole array is drilled to a preset elevation according to a preset position; the slotting holes, the caving holes and the contour holes are charged in a differentiated layered charging mode; segmental delayed
detonation is conducted, specifically, a slotting hole drainage
cartridge bag is detonated firstly so that water on the upper portion of a slotting rock
mass can be discharged, and an orifice rock
mass is broken; then, upper and lower
rock breaking cartridges of the slotting hole and cartridges of the caving hole and the contour hole are sequentially detonated in a delayed mode; blasting gravels generated in the
detonation process are removed, and the
pile foundation steel
pipe is sunk to the designed elevation; and concrete is poured into the
pile foundation steel
pipe to form the offshore pile foundation. According to the method, the deepwater high-pressure limitation is reduced through the
detonation drainage process and the segmented delayed detonation process, the efficiency of layered
rock breaking and energy directional release is improved, and then the blasting effect and the
slag removal efficiency of offshore pile foundation excavation construction are improved.