The invention relates to a large
tidal range deepwater causeway closure gap closure
steel frame cage structure and a closure gap closure construction method therefore. The structure is characterized in that the
steel frame cage structure comprises section steel frameworks, connecting ribs, sliding grooves, sliding strips, fixing ribs and reinforcing meshes, wherein the
steel frame cage is a truncated
pyramid body, the steel frame cage parallel to the two sides of a closure gap and the outer sides of the two section steel frameworks making contact with a soft permeable material are provided with fixing steel pipes respectively, the two sides, perpendicular to the closure gap, of the steel frame cage are provided with the corresponding number of sliding grooves and sliding strips respectively, and the steel frame cage is fixed on a concrete
interlocking piece through a lock catch on the soft permeable material. The closure gap closure construction method of the large
tidal range deepwater causeway closure gap closure steel frame cage structure comprises the following steps that the lock catch is prefabricated and placed, early-stage preparation is carried out, closure dam is carriedout, the construction of a
diversion dam is carried out, technical observation is carried out, the steel frame cage is manufactured, the steel frame cage is subjected to hoisting and placing,
riprap and coping are carried out, enclosed gas construction is carried out, a
breakwater core is subjected to hydraulic reclamation and the like, a water-permeable frame cage is placed on a closure gap closure dam to form an closure dam framework, the
riprap is carried out in the frame cage to finish closure, and the positioning intercepting effects are good.