The application relates to the technical field of water conservancy and
hydropower engineering and discloses a dam shoulder
karst underground
river drainage and horizontal pressure relief
system and a construction method, the dam shoulder
karst underground
river drainage and horizontal pressure relief
system comprises an underground river pipeline blocking module used for filling the underground river pipeline and forming a water retaining structure; an underground
river water drainage and removal module used for connecting the water bodies inside and outside the mountain and realizing flow transfer of the water bodies; a
karst gas passage module used for connecting the gases inside and outside the mountain and realizing flow transfer of the gases; the underground
river water drainage and removal module and the karst gas passage module form a gas passage and horizontal pressure relief structure, and the gas passage and horizontal pressure relief structure keeps the
water balance between the inside and outside of the mountain based on the principle of a communicating vessel. The construction method is based on the dam shoulder karst underground
river drainage and horizontal pressure relief
system. Through cooperation of the three modules, multiple functions such as drainage, gas passage and horizontal pressure relief are realized, the gas passage and horizontal pressure relief
structure based on the principle of a communicating vessel is formed, is used for drainage during the construction period and water and gas balance during the operation period, and is used for
processing the dam shoulder karst underground river passage, so that the influence of
karst water and gas on the dam is effectively solved.