Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

63results about How to "Method innovation" patented technology

Cargo vehicle security state previous warning method based on braking distance

The invention relates to a cargo vehicle security state early warning method based on braking distance, in particular to a determination method of the early warning threshold of the on-road vehicle. Aiming at the condition that the on-road vehicle is easy to have some potential dangers, the method of the invention uses the braking distance as the starting point to reflect the secure state of the vehicle. The real-time monitoring method of the on-road state of the vehicle comprises the following specific steps: extracting various factors of the vehicle such as the brake parameters, the current state factor and the outer road environment factor to perform information integration, using a braking distance model to calculate the required braking distance d1 of the current vehicle, comparing with a safe braking distance d0, calculating the degree of risk to determine the current danger condition of the vehicle, and using the range of the degree of risk as the early warning threshold of the vehicle to perform graded early warning. The invention has high instantaneity, precision and accuracy, does not require complicated calculation and design and provides a scientific and effective method for the determination of the danger condition threshold of the vehicle.
Owner:JILIN UNIV

Multi-scale multi-physical field coupling simulation method for nuclear reactor TRISO fuel particles

ActiveCN111291494ARealize one-dimensionalRealize three-dimensional multi-scale couplingDesign optimisation/simulationNuclear reactorGeometric modeling
A multi-scale multi-physical field coupling simulation method for nuclear reactor TRISO fuel particles comprises the following steps of rstablishing 1, a zero-dimensional neutron burnup model, a one-dimensional geometric model and a three-dimensional geometric model; 2, setting a solution domain, an initial condition and a boundary condition at different scales; 3, completing neutron burnup calculation in each time step length, preliminarily calculating fission gas release amount in the fuel pellet one-dimensional geometric model, and completing preliminary calculation of heat transfer and mechanics in the fuel particle three-dimensional geometric model; and 4, taking a calculation result in the one-dimensional geometric model of the fuel pellet in the step 3 as calculation input in the three-dimensional geometric model of the fuel pellet in the next time step length, wherein he calculation result in the fuel particle three-dimensional geometric model in the step 3 is used as calculation input in the fuel pellet one-dimensional geometric model of the next time step, and calculation results of heat transfer and mechanics are mutually transmitted; and 5, repeating the coupling process in the step 4 until the calculation is converged, otherwise, returning to the step 3 until the calculation is converged.
Owner:XI AN JIAOTONG UNIV

Method for establishing full three-dimensional coupling model of reactor U-shaped tubular steam generator

The invention discloses a method for establishing a full three-dimensional coupling model of a reactor U-shaped tubular steam generator, which is suitable for all systems related to energy conversionby adopting a shell-and-tube heat exchanger in the field of energy. The coupling method mainly comprises the following steps: 1, simplifying a geometric model of the steam generator; 2, establishing aprimary and secondary side geometric model; 3, carrying out primary and secondary side three-dimensional computing node division; 4, performing spatial dispersion on a pipe side (primary side) energysource item; 5, performing spatial discretization on a shell side (secondary side) energy source item; 6, coupling primary and secondary side energy source items at the same coordinate node; and 7, performing data transmission between the primary side and the secondary side and on internal nodes of each side, and performing iteration to obtain a convergence solution. Geometric model simplification is mainly used for simplifying the workload caused by the number of a large number of heat transfer pipes to model establishment and numerical calculation. Primary and secondary side computing nodedivision adopts a completely identical division strategy; each side energy source item is obtained through a discrete flow heat transfer equation; and the data exchange of the energy source items on the two sides is carried out between the corresponding primary and secondary side computing nodes under the same coordinate.
Owner:XI AN JIAOTONG UNIV

Method for building Nierji reservoir water ecological risk early warning model through fusion technology

The invention discloses a method for building a Nierji reservoir water ecological risk early warning model through the fusion technology, and relates to a method for building a Nierji reservoir water ecological risk early warning model. A system dynamics decision-making module is adopted for risk early warning and decision making quantitative analysis, then a Bayesian network model is adopted for risk early warning and decision making quantitative analysis according to a quantitative analysis result, and therefore Nierji reservoir water ecological risk early warning and decision making are achieved. The Nierji reservoir water ecological risk early warning model is built, the system dynamics and the Bayesian network model technology are fused, quantitative advantages in early-warning and decision-making research are highlighted, and Nierji reservoir water ecological risk early warning and decision making are achieved. The accuracy of the model is verified based on comparison and analysis for current data, and the availability of the model is verified through early-warning research on relative risk source risks and decision-making research on control strategies.
Owner:松辽流域水资源保护局松辽流域水环境监测中心 +1

Method for establishing nuclear power system shell-and-tube heat exchanger numerical model under motion condition

ActiveCN111274747AConsider mobilityConsider all featuresDesign optimisation/simulationCAD numerical modellingComputational modelEngineering
The invention discloses a method for establishing a numerical model of a shell-and-tube heat exchanger of a nuclear power system under a motion condition. The method is suitable for establishing a three-dimensional numerical calculation model of large heat exchange equipment of the nuclear power system under the motion condition that different forms are generated under certain external force. Thethree-dimensional numerical calculation model is mainly based on a three-dimensional thermal hydraulic numerical calculation model of the shell-and-tube heat exchanger in static operation. According to the motion forms and the stress characteristics under different motion conditions, the stress is uniform; motion decomposition, stress analysis and decomposition of a single motion, establishment ofan additional force source item acting on a momentum equation under the single motion, and a composite motion additional force source item synthesis process are carried out on a shell-and-tube heat exchanger under a composite motion condition; and finally, establishing a set of numerical calculation model capable of accurately describing the thermal hydraulic characteristics of the shell-and-tubeheat exchanger of the nuclear power system under the composite motion condition.
Owner:XI AN JIAOTONG UNIV

Data processing method for Beidou and GPS common frequency point real-time signal receiving and processing system

The invention discloses a data processing method for a Beidou and GPS common frequency point real-time signal receiving and processing system. Beidou second generation and GPS common frequency point signals are transmitted into three RF front-end modules through the same antenna, through a series of amplification, filtering and down-conversion, the signals are converted into 2-bit medium-frequency digital signals in an A/D mode, the medium-frequency digital signals are acquired into an internal storage of an FPGA under the control of the FPGA and stored as data blocks of certain length in a ping-pong mode, and finally, the data blocks are transmitted to a computer through a USB controller. The method has the advantages that the technical purposes that the Beidou second generation and the GPS common frequency point signals are captured rapidly on a software framework of a computer platform and the data are processed in real time are achieved, and the locating accuracy, the reliability, the integrity and the usability of a single locating system are remarkably improved; based on software development of the software radio technology, an algorithm of a traditional hardware receiver is eliminated, and a reconfiguration research mode is achieved.
Owner:SHANGHAI INST OF TECHNICAL PHYSICS - CHINESE ACAD OF SCI

Well head and well bottom pressure conversion method for shale gas horizontal well under two-phase flow conditions

The invention discloses a well head and well bottom pressure conversion method for a shale gas horizontal well under two-phase flow conditions. The well head and well bottom pressure conversion method comprises the step of logging data, such as daily output, pressure and temperature of a production well head based on the condition that a well shaft of a shale gas production well has two phases of gas and liquid. The flowing states of the well shaft of a vertical section and a horizontal section of a gas well are analyzed by taking the influence of factors, such as nonlinear change of gas, a slippage effect and pipe wall frictional resistance, into consideration, and integrating a testing result of a production profile of the production well, so that a two-phase flow pipe flow model is selected, and well head and well bottom pressure conversion is carried out. According to the well head and well bottom pressure conversion method for the shale gas horizontal well under the two-phase flow conditions, the technical difficult problems about flow state distribution characteristics of the well shaft of the shale gas horizontal well are effectively solved by fully and comprehensively utilizing production dynamic monitoring data, and a foundation is laid for converting well head and well bottom pressure in the next step. Meanwhile, a result is verified by adopting underground permanent monitoring data and output profile test data; the well head and well bottom pressure conversion method has the characteristics that the method is innovative, the thought is rigorous, the application is simple, and the analysis results are accurate and reliable.
Owner:中石化石油工程技术服务有限公司 +1

A water ecological risk assessment method for typical areas of the Nenjiang River Basin based on a system dynamics decision model

A water ecological risk assessment method for a typical area of ​​the Nen River Basin based on a system dynamics decision model, which relates to a water ecological risk assessment method for a typical area of ​​the Nen River Basin. The method of the present invention is as follows: through the system dynamics decision-making model, the tributary influx, non-point source discharge, upstream water and sewage discharge along the river that affect the amount of pollution sources entering the Nierji Reservoir are used to simulate different treatment schemes to reduce the pollution of the reservoir. The effect of ecological risk is to realize the decision-making of the plan, and on the basis of the water ecological risk index system, evaluate the water ecological risk status of different points in the lake in different periods, and build the sample space of Bayesian network based on Netica software to calculate each index The probability of occurrence of different degrees of ecological risk when changes occur, so as to realize the assessment of water ecological risk in typical areas of the Nenjiang River Basin. The invention is applied to water ecological risk assessment in typical areas of river basins.
Owner:松辽流域水资源保护局松辽流域水环境监测中心

Data processing method for Beidou and GPS common frequency point real-time signal receiving and processing system

The invention discloses a data processing method for a Beidou and GPS common frequency point real-time signal receiving and processing system. Beidou second generation and GPS common frequency point signals are transmitted into three RF (radio frequency) front-end modules through the same antenna, through a series of amplification, filtering and down-conversion, the signals are converted into 2-bit medium-frequency digital signals in an A / D mode, the medium-frequency digital signals are acquired into an internal storage of an FPGA under the control of the FPGA and stored as data blocks of certain length in a ping-pong mode, and finally, the data blocks are transmitted to a computer through a USB controller. The method has the advantages that the technical purposes that the Beidou second generation and the GPS common frequency point signals are captured rapidly on a software framework of a computer platform and the data are processed in real time are achieved, and the locating accuracy, reliability, integrity and usability of a single locating system are remarkably improved; and based on software development of the software radio technology, an algorithm of a traditional hardware receiver is eliminated, and a reconfiguration research mode is achieved.
Owner:SHANGHAI INST OF TECHNICAL PHYSICS - CHINESE ACAD OF SCI

Real-time signal receiving and processing system of public frequency points of Beidou navigation satellite system and GPS

The present invention discloses a real-time signal receiving and processing system of public frequency points of a Beidou navigation satellite system and a GPS. Signals of the public frequency points of the Beidou navigation satellite system and the GPS enter three RF radio frequency front end modules through the same antenna, are subjected to a series of amplification, filtering and down-conversion processing, and are converted to 2bit medium frequency digital signals through the A / D (Analog to Digital) conversion, and the medium frequency digital signals are acquired to the internal storage of an FPGA under the control of the FPGA, are stored to be a data block with a certain length in a ping-pong mode, and are transmitted to a computer in a block mode through a USB controller. The real-time signal receiving and processing system of public frequency points of a Beidou navigation satellite system and a GPS is able to perform rapid capture and real-time data processing of signals of the public frequency points of the Beidou navigation satellite system and the GPS on the software architecture of a computer platform, and the like, therefore positioning accuracy, reliability, integrity and availability of a single positioning system are substantially improved; and moreover, the software development on the basis of the software radio technology is performed, thereby getting rid of the algorithm of a traditional hardware receiver and realizing the reconfiguration of a research mode.
Owner:SHANGHAI INST OF TECHNICAL PHYSICS - CHINESE ACAD OF SCI

A method for building a full three-dimensional coupled model of a reactor u-tube steam generator

A method for establishing a full three-dimensional coupling model of a reactor U-shaped tube steam generator is applicable to all systems in the energy field that use shell-and-tube heat exchangers for energy conversion. The coupling method mainly includes the following parts: 1. Simplification of the geometric model of the steam generator; 2. Establishment of the geometric model of the primary and secondary sides; 3. The three-dimensional calculation node division of the primary and secondary sides; 4. The energy source item space of the tube side (primary side) Discrete; 5. Discretization of energy source items on the shell side (secondary side); 6. Coupling of energy source items on the primary and secondary sides at the same coordinate nodes; 7. Data transfer between primary and secondary sides and internal nodes on each side, iteration a convergent solution. Geometric model simplification is mainly used to simplify the workload caused by a large number of heat transfer tubes for model establishment and numerical calculation; the division of primary and secondary calculation nodes adopts exactly the same division strategy; the energy source items of each side are obtained through discrete flow heat transfer equations; The data exchange of energy source items on both sides is carried out between the corresponding primary and secondary computing nodes under the same coordinates.
Owner:XI AN JIAOTONG UNIV

Method and device of automatically monitoring suspended load sediment by replacement method

The invention discloses a method and a device of automatically monitoring suspended load sediment by a replacement method. The device includes an overwater portion and an underwater portion. The underwater portion includes a lead fish and a cable. A submersible pump is mounted on the cable above the lead fish. A water inlet of the submersible pump is parallel to a main line of the lead fish. An upper water pipe of the submersible pump protrudes from a water surface and is provided with a solenoid valve. The overwater portion includes a water container. The water container is placed on a weighing sensor through a support frame. An overflow water pipe is arranged at an upper end of the water container. An upper end of the overflow water pipe opens into an overflow drainage pipe. A drainage pipe is arranged at a lower end of the water container. A solenoid valve is arranged on the drainage pipe. A first temperature sensor is mounted at the same height as the submersible pump. A second temperature sensor is mounted at the overflow drainage pipe. According to the device, automation of observing of suspended load sediment of rivers can be realized, manual intervention and errors caused by manual intervention are greatly reduced, work efficiency can be improved by dozens of times, and energy consumption is greatly reduced.
Owner:赵如月
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products