The invention relates to a soakaway pit
dewatering device and a soakaway pit construction method. The soakaway pit
dewatering device comprises a
pile casing with a top opening, a
water pumping pipe extending to the bottom of the
pile casing is arranged in the
pile casing, a water inlet end of the
water pumping pipe is connected with a water pump, the water outlet end extends out of the pile casing, a plurality of water inlet holes are uniformly formed in the side wall and the bottom of the pile casing, the water inlet holes of the side wall of the pile casing extend to the middle of the pile casing from the bottom of the pile casing, a steel plate
water stop ring is arranged on an outer ring of the top of the pile casing, a scaleplate which moves up and down along the inner wall of the pile casing is arranged on the inner wall of the pile casing, and a
buoy is arranged at the bottom of the scaleplate; and the construction method comprises the following steps of pile casing installing,
water pumping, graded sand and stone pouring, foundation concrete
cushion layer, waterproof coiled material laying, fine stone concrete protective layer pouring and the like. According to the soakawaypit
dewatering device and the soakaway pit construction method, in a foundation construction process, construction and dewatering can be carried out at the same time, the dewatering is stopped whilethe foundation concrete pouring is finished, and it is effectively ensured that the
water level of a foundation pit continues to being below a
cushion layer before the raft concrete construction is carried out.