Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

878 results about "Water damage" patented technology

Water damage describes various possible losses caused by water intruding where it will enable attack of a material or system by destructive processes such as rotting of wood, growth, rusting of steel, de-laminating of materials such as plywood, and many others.

Anti-rut asphalt modifier and preparation method thereof and modified asphalt and application thereof

The invention discloses a traffic anti-rut asphalt modifier and a preparation method thereof; the asphalt modifier is prepared from the following components in parts by weight: 20 to 200 parts of thermoplastic elastomer, 5 to 450 parts of polyolefin, and 5 to 400 parts of rubber powder. Simultaneously, the invention also discloses modified asphalt which contains the asphalt modifier and application of the modified asphalt in asphalt mixture. The invention can significantly improve the high-temperature performance and the anti-rut capability of the asphalt mixture, improves anti-water damage and anti-low temperature cracking and other performance, and has high cost performance. Compared with asphalt modification, the invention does not need to add asphalt modification equipment, can significantly reduce energy consumption and loss in the production process, can realize long-termed inventory, prevents the problem of the poor storage stability of modified asphalt, does not affect the mixing proportion design, does not change the gradation of the asphalt mixture under any content, only finely adjusts the asphalt-aggregate ratio, has simple construction process, and realizes random adding through a direct feeding method.
Owner:SHENZHEN OCEAN POWER INDUSTRIAL CO LTD +3

Water conservation method for overlying strata water flowing fracture main channel through ground horizontal directional drilling grouting and sealing

The invention discloses a water conservation method for overlying strata water flowing fracture main channel through ground horizontal directional drilling grouting and sealing, which is suitable forthe technical field of water resource conservation in coal mining and mine water damage prevention and control. The method includes the following steps: firstly obtaining development characteristic information of the mined height of the overlying strata water flowing fractured zone in a tested area under specific mining conditions; then according to the development characteristic information, determining the distribution range of an aquiclude area of the overlying strata water flowing fractured zone communication stratum corresponding to the water flowing fracture main channel in the tested area; lastly, after determining position and orientation of the water flowing fracture main channel, constructing horizontal directional drilling on the ground and grouting and sealing the water flowingfracture main channel, thereby achieving the goal of reducing water conductivity of the fracture and conserving groundwater resources. The water conservation method has the advantages of simple steps, reliable effect and strong practicability.
Owner:CHINA UNIV OF MINING & TECH

Steel slag and rubber asphalt concrete and preparation method thereof

The invention provides a steel slag and rubber asphalt concrete and a preparation method thereof. In the concrete, the steel slag is selected as a coarse aggregate and rubber asphalt is selected as a binder, and the concrete further comprises a fine aggregate and a filler; the mineral aggregate of the asphalt mixture is graded to form a coarse aggregate gap gradation framework solid type; the ratio of the rubber asphalt to the mineral aggregate is comprehensively determined through a Marshall compacting experiment to determine the range via the volume parameter of a Marshall test piece and verification on the road properties such as high-temperature rutting resistance and water damage resistance; when the rubber asphalt and the mineral aggregate are mixed and stirred, the heating temperature of the rubber asphalt is 175-180 DEG C and the heating temperature of the mineral aggregate is 10-30 DEG C higher than that of the rubber asphalt; moreover, the dry mixing time of the mineral aggregate is 15-20 s and the wet mixing time of the mineral aggregate is 35-40 s; and the ex-factory temperature of the steel slag and rubber asphalt concrete formed after the mixing and the stirring is 175-185 DEG C. The invention replaces the mineral aggregate by the steel slag, and can recycle the waste materials, save the stone resources, and reduce the destruction from the stone mining to the environment.
Owner:RES INST OF HIGHWAY MIN OF COMM

Anti-rutting asphalt modifier, preparation method thereof, modified asphalt and application thereof

The invention discloses a traffic anti-rutting asphalt modifier and a preparation method thereof, and the asphalt modifier is prepared by the following component in parts by weight: 10-20 parts of polyolefin, 1-80 parts of rubber powder and 0.5-1 part of antioxidant. The invention simultaneously discloses modified asphalt containing the asphalt modifier and an application of the modified asphalt in asphalt mixture. The invention can significantly improve the high-temperature performance and the anti-rutting capacity of the asphalt mixture, improve the resistance to water damage, the resistance to low temperature cracking and other performances and have high performance-price ratio. Compared with asphalt modification, the invention does not need to add an asphalt modification device and can significantly reduce the energy consumption and the loss during the production process, realize the long-term storage, avoid the problem of poor storage stability of the modified asphalt, not affect the design of the mixing proportion, not change the graduation of the asphalt mixture under any content and only need to carry out micro-adjustment on the asphalt-aggregate ratio; the construction process is simple; and the direct input method can realize the addition at will.
Owner:SHENZHEN OCEAN POWER INDUSTRIAL CO LTD +3

Rubber modified asphalt mixture and preparation and construction methods thereof

The invention relates to a modified asphalt mixture and preparation and construction methods thereof, particularly relates to rubber modified asphalt and preparation and construction methods thereof and belongs to the technical field of engineering. The rubber modified asphalt and the methods solve the construction problem that the mixture is thick and sticky by adding trans-polyoctenamer rubber (TOR) into the asphalt mixture, further reduce the stirring temperature of the rubber asphalt mixture, reduce processing equipment, improve production process, and are favorable for preventing water damage by a design method of continuous dense gradation. The preparation process of the mixture improves the using performance of the rubber asphalt mixture. The rubber modified asphalt and the methodshave the advantages of promoting the comprehensive utilization of waste tires by paving asphalt pavements with waste rubber powder modified asphalt, reducing great environment stress brought by blackpollution, saving resources, improving the pavement performance of the asphalt mixture, improving the service quality of the pavement, prolonging the service life of the pavement, reducing cost, and improving performance of products. Compared with the conventional modified asphalt production process, the preparation and construction methods have the advantages of energy saving and environmental protection and are convenient for construction.
Owner:JIANGSU EASTTRANS INTELLIGENT CONTROL TECH GRP CO LTD

Coal mine underground roadway transient electromagnetic stack advanced detection device and method

The present invention belongs to the coal mining geophysical prospecting technical field, relates to a transient electromagnetic stack advanced detection device and method, in particular, a coal mine underground roadway transient electromagnetic stack advanced detection device and method. According to the device and method of the invention, a probe is arranged in a borehole, so that the probe can be far away from interference sources such as metal machineries in a roadway, and therefore, the influence of the interference sources can be avoided; the hole drilling conditions of a coal mine tunneling face are fully utilized, so that inside-roadway coil emission and inside-borehole three-component receiving can be realized; and a receiving device can move towards a direction before the tunneling face, and therefore, various kinds of the interference of the metal machineries at the tunneling face can be avoided without affecting the tunneling work of a mine party, and the advanced detection data of a plurality of positions in the borehole can be subjected to stack processing, and processing results can be displayed, and thus, hidden water damage geological bodies before the tunneling face can be predicted at an extra long distance.
Owner:XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products